← Back
Walk-up apt, over six families with stores
229 SOUTH 3 STREET
BROOKLYN · BIN 3063156
💬 Discuss this project
1908Year Built
6Stories
C7Building Class
R6Zoning
14,355 sfGross Floor Area
17Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 229 STREET LLC · 2,750 sf lot · 5.22 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARASH REAL ESTATE MGMT307/08/2026
229 STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/21/2014$3.6M—— → —$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES110/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AIDIN HOME IMPROVEMENT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TESTERMAN PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275110/09/2020
Building Lifecycle
All (67)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Special Inspection (4)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
04/11/2024
Violation issued (HPD, closed)
A
12/07/2023
Violation issued (HPD, open)
B
12/07/2023
Violation issued (HPD, open)
C
12/07/2023
Violation issued (HPD, open)
B
11/07/2022
Violation issued (HPD, closed)
I
06/29/2022
Violation issued (HPD, closed)
C
06/29/2022
Violation issued (HPD, closed)
A
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
A
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
A
06/09/2022
Violation issued (HPD, closed)
A
06/09/2022
Violation issued (HPD, open)
A
06/09/2022
Violation issued (HPD, open)
C
06/09/2022
Violation issued (HPD, closed)
A
04/20/2022
Violation issued (HPD, closed)
B
04/20/2022
Violation issued (HPD, open)
C
04/20/2022
Violation issued (HPD, closed)
B
04/15/2022
Violation issued (HPD, closed)
B
04/15/2022
Violation issued (HPD, closed)
B
03/02/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, open)
C
02/17/2022
Violation issued (HPD, closed)
B
02/17/2022
Violation issued (HPD, closed)
B
12/16/2021
Violation issued (HPD, open)
B
12/16/2021
Violation issued (HPD, closed)
C
12/16/2021
Violation issued (HPD, closed)
B
12/16/2021
Violation issued (HPD, closed)
C
12/16/2021
Violation issued (HPD, closed)
C
12/16/2021
Violation issued (HPD, closed)
C
12/16/2021
Violation issued (HPD, closed)
B
12/16/2021
Violation issued (HPD, closed)
B
12/16/2021
Violation issued (HPD, closed)
B
11/01/2021
Signed off — Alteration
REPLACE PLUMBING FIXTURES AT FIRST FLOOR STOREAT SAME LOCATION. REPLACE OLD WATER PIPE, DRAINAGE PIPE FOR SINK AT FIRST FLOOR.
B00408846-I1
12/14/2020
Permit issued — Plumbing
B00408846-I1-PL
10/16/2020
Violation issued (HPD, closed)
A
10/16/2020
Violation issued (HPD, closed)
B
10/16/2020
Violation issued (HPD, closed)
B
10/16/2020
Violation issued (HPD, closed)
B
10/16/2020
Violation issued (HPD, closed)
A
10/16/2020
Violation issued (HPD, closed)
B
10/16/2020
Violation issued (HPD, open)
C
10/16/2020
Violation issued (HPD, closed)
B
10/09/2020
Filed — Alteration
REPLACE PLUMBING FIXTURES AT FIRST FLOOR STOREAT SAME LOCATION. REPLACE OLD WATER PIPE, DRAINAGE PIPE FOR SINK AT FIRST FLOOR.
B00408846-I1
10/09/2020
Special inspection requirement — Electrical energy consumption
BAKHTIAR SHAMLOO
10/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
10/06/2020
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
10/06/2020
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
03/05/2020
Violation issued (HPD, closed)
B
12/20/2019
Violation issued (HPD, closed)
B
12/20/2019
Violation issued (HPD, closed)
C
07/14/2019
Violation issued (HPD, closed)
B
06/07/2019
Violation issued (HPD, closed)
A
06/07/2019
Violation issued (HPD, closed)
B
06/07/2019
Violation issued (HPD, closed)
A
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTESTERMAN PLBG & HTG INC12/14/2020
BISOTISSUEDNY BUILDING ASSOCIATES IN11/25/2020
1 project · most recent 05/12/2021
FiledStatusContractorScope
05/12/2021Permit IssuedYORK ELEC'L CONTR'S INC.18 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/09/2020Electrical energy consumptionBAKHTIAR SHAMLOOenergy_progress
10/06/2020Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/06/2020Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
10/06/2020Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00408846-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/25/2021340761606Open ↗
10/13/2020340761606Open ↗
09/23/2020340761606Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
11/25/2020340761606Open ↗
▸BISWORK PERMIT APPLICATION1
11/25/2020340761606Open ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B00408846-I1Open ↗
08/27/2026B00408846-I1Open ↗
08/27/2026B00408846-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2020340761606Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/02/2026B00408846-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00408846-I1Open ↗
▸Safety & Tenant Protection5
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
11/06/2020340761606Open ↗
10/30/2020340761606Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
09/03/2020340761606Open ↗
▸BISSTREET TREE CHECKLIST1
09/03/2020340761606Open ↗
▸DOB NOWTenant Protection Plan1
09/02/2026B00408846-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/03/2020340761606Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00408846-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/22/2021340761606Open ↗
10/14/2021340761606Open ↗
11/06/2020340761606Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/14/2021340761606Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/06/2020340761606Open ↗
11/06/2020340761606Open ↗
10/13/2020340761606Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2021340761606Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/14/2021340761606Open ↗
09/03/2020340761606Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
10/14/2021340761606Open ↗
06/28/2021340761606Open ↗
05/27/2021340761606Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2020340761606Open ↗