← Back
Walk-up cooperative
229 WEST 144 STREET
MANHATTAN · Harlem (North) · BIN 1060451
💬 Discuss this project
1940Year Built
6Stories
C6Building Class
R7-2Zoning
—Gross Floor Area
41Units
210 Open Violations 209 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 219-229 W 144 ST TENANTS ASSOC HDFC · 4.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES607/25/2026
219-229 W 144 ST TENANTS ASSOC HDFC303/22/2026
219-229 W 144 ST HDFC103/22/2026
HOUSING PRESERVATION DEVEL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES107/23/2025
GESTURE INK ARCHITECTURE101/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
S M EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESUS CONSTRUCTION COMGeneral Contractor303/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor207/25/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413101/25/2022
Building Lifecycle
All (73)Filed (2)Permit Issued (3)Signed Off (1)Violation (60)Objection (4)Special Inspection (3)
07/23/2026
Permit issued — Sidewalk Shed
M01259905-I1-SH
07/13/2026
Violation issued (HPD, open)
B
07/13/2026
Violation issued (HPD, open)
C
07/13/2026
Violation issued (HPD, open)
B
07/13/2026
Violation issued (HPD, open)
B
07/13/2026
Violation issued (HPD, open)
A
07/13/2026
Violation issued (HPD, open)
B
07/13/2026
Violation issued (HPD, open)
C
07/13/2026
Violation issued (HPD, open)
C
07/13/2026
Violation issued (HPD, open)
C
07/13/2026
Violation issued (HPD, open)
B
07/13/2026
Violation issued (HPD, open)
B
07/07/2026
Violation issued (ECB, open)
Construction
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
C
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
C
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
C
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
C
07/01/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, open)
C
06/29/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
A
12/30/2025
Violation issued (HPD, open)
C
12/30/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
B
12/07/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
C
11/17/2025
Violation issued (HPD, closed)
I
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, open)
C
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, open)
C
10/12/2025
Violation issued (HPD, open)
C
10/12/2025
Violation issued (HPD, open)
C
10/12/2025
Violation issued (HPD, open)
B
10/12/2025
Violation issued (HPD, open)
B
10/07/2025
Violation issued (HPD, closed)
C
10/07/2025
Violation issued (HPD, open)
C
10/06/2025
Violation issued (HPD, open)
C
07/23/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01259905-I1
07/23/2025
Permit issued — Sidewalk Shed
M01259905-I1-SH
06/27/2025
Violation issued (ECB, open)
Construction
06/04/2025
Violation issued (HPD, open)
A
05/08/2025
Violation issued (HPD, open)
B
05/08/2025
Violation issued (HPD, open)
B
05/08/2025
Violation issued (HPD, open)
C
08/26/2024
Violation issued (FDNY_NOV, closed)
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC07/23/2026
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC07/23/2025
DOB NOWGeneral ConstructionSigned-offGENESUS CONSTRUCTION COM12/01/2022
BISOTISSUEDI HOPE PLUMBING & HEATING CO INC03/24/1992
BISPLISSUEDI HOPE PLUMBING & HEATING CO INC03/24/1992
BISPLISSUEDST MARKS PLUMBING CO07/18/1991
BISOTISSUEDST MARKS PLUMBING CO07/18/1991
BISFBISSUEDS & M COMBUSTION INC05/07/1991
BISOTISSUEDS & M COMBUSTION INC04/11/1991
2 projects · most recent 07/25/2025
General Wiring
FiledStatusContractorScope
07/25/2025Permit IssuedRICHARD NEU—
01/08/2023CompleteGREEN LIGHT ELECL & MECHGeneral Wiring
1 project · most recent 07/23/2025
Sidewalk Shed
FiledStatusContractorScope
07/23/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/14/2021Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
12/14/2021Fire-Resistance Rated ConstructionALLENDE MATOSprogress
12/14/2021FinalMEL SARKOR-CLINTONprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026M01259905-I1Request digital key ↗
08/14/2026M00647374-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/03/2026M00647374-I1Open ↗
08/22/2026M01259905-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026M00647374-I1Open ↗
08/26/2026M00647374-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M00647374-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026M00647374-I1Open ↗