← Back
BuildNYC
Television studio
229 WEST 53RD STREET
MANHATTAN · BIN 1024833
💬 Discuss this project
1926Year Built
1Stories
J6Building Class
C6-5Zoning
13,010 sfGross Floor Area
4Units
0 Active Violations
Television studio · Owner of record: Roundabout Theatre Company · 11,667 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoundabout Theatre Company22p · 5 filings · 20 docs
Floor 1Valentino Beauty, Roundabout Theatre Company26p · 6 filings · 20 docs
MezzanineRoundabout Theatre Company20p · 3 filings · 20 docs
CellarRoundabout Theatre Company21p · 3 filings · 14 docs
Site & exteriorRoundabout Theatre Company21p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Roundabout Theatre Co6907/08/2026
Studio 54 Holdings903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design303/21/2026
Design 2147603/21/2026
Codegreen603/21/2026
Municipal Building Consultants103/21/2026
Nyccode203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ConstructomicsGeneral Contractor1907/08/2026
Buildcox ConstructionScaffold1007/08/2026
Reliable Plumbing & HeatingPlumbing407/08/2026
Pace PlumbingPlumbing107/08/2026
Winick ProductionsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254804/05/2023
P.a.collins Inspections P2168109/26/2019
Building Lifecycle
All (84)Filed (17)Permit Issued (22)Signed Off (8)Violation (1)Inspection (4)Objection (2)Special Inspection (30)
10/30/2025
Filed — No Work
M01307914-I1
10/10/2025
Signed off — Alteration
Temporary platform for a Valentino event in the theater. Removed at the end of the programing. No changes to existing structures, use or egress.
M01276824-I1
09/10/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Admin
09/08/2025
Filed — No Work
M01276712-P1
08/28/2025
Permit issued — General Construction
M01276824-I1-GC
08/26/2025
Filed — Alteration
Temporary platform for a Valentino event in the theater. Removed at the end of the programing. No changes to existing structures, use or egress.
M01276824-I1
08/26/2025
Filed — No Work
M01276712-I1
08/25/2025
Special inspection requirement — Final
ANDY ENGLER ROTH
04/28/2023
Signed off — Alteration
Repair mortar at underside of slab & repair steel for stair on roof; Replace missing or damaged spindles and railing on the fire escapes on the Mez, Balcony and Ground Flr as per plans (Studio 54 - Roof Replacement.) No change to use, egress or occupancy
M00768462-I1
04/06/2023
Special inspection requirement — Final
MAURICIO ANDRADE
04/06/2023
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
04/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
04/06/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
04/06/2023
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
04/05/2023
Filed — Alteration
Repair mortar at underside of slab & repair steel for stair on roof; Replace missing or damaged spindles and railing on the fire escapes on the Mez, Balcony and Ground Flr as per plans (Studio 54 - Roof Replacement.) No change to use, egress or occupancy
M00768462-P3
03/23/2023
Signed off — Alteration
Installation of temporary sidewalk shed, supported scaffold and material hoist as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00784706-I1
03/23/2023
Signed off — Alteration
Installation of a temporarily roof protection as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00784721-I1
03/07/2023
Signed off — Alteration
Remove existing roof membrane and insulation, prep and patch concrete deck for new insulation coverboard and liquid membrane roof. Raise parapets with railing on the roof as per plans (Studio 54 - Roof Replacement.) No change to use, egress or occupancy.
M00768423-I1
03/07/2023
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
03/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
03/07/2023
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
03/07/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
03/07/2023
Special inspection requirement — Final
MAURICIO ANDRADE
12/13/2022
Signed off — Alteration
M00462522-I1
12/12/2022
Filed — Alteration
Repair mortar at underside of slab & repair steel for stair on roof; Replace missing or damaged spindles and railing on the fire escapes on the Mez, Balcony and Ground Flr as per plans (Studio 54 - Roof Replacement.) No change to use, egress or occupancy
M00768462-P2
12/09/2022
Special inspection requirement — Final
MAURICIO ANDRADE
12/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
12/09/2022
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
12/09/2022
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
12/09/2022
Special inspection requirement — Sprayed fire-resistant materials
MAURICIO ANDRADE
12/09/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/07/2022
Filed — Alteration
Remove existing roof membrane and insulation, prep and patch concrete deck for new insulation coverboard and liquid membrane roof. Raise parapets with railing on the roof as per plans (Studio 54 - Roof Replacement.) No change to use, egress or occupancy.
M00768423-P1
12/02/2022
Signed off — Alteration
HEREWITH FILING A RENOVATION THAT INCLUDES THE REPLACEMENT OF EXISTING WATER HEATERS AND ASSOCIATED PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00462542-I1
12/01/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Sprayed fire-resistant materials
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Concrete - Cast-In-Place
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Masonry
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Final
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
12/01/2022
Special inspection requirement — Final
MAURICIO ANDRADE
11/29/2022
Permit issued — Supported Scaffold
M00784706-I1-SF
11/28/2022
Permit issued — Supported Scaffold
M00784706-I1-SH
11/14/2022
Signed off — Alteration
M00462505-I1
09/29/2022
Permit issued — Mechanical Systems
M00462522-I1-MS
09/29/2022
Permit issued — General Construction
M00768423-I1-GC
09/29/2022
Permit issued — General Construction
M00462505-I1-GC
09/29/2022
Permit issued — Structural
M00768462-I1-ST
09/13/2022
Permit issued — General Construction
M00462505-I1-GC
09/13/2022
Permit issued — Mechanical Systems
M00462522-I1-MS
08/31/2022
Filed — Alteration
Installation of a temporarily roof protection as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00784721-I1
08/31/2022
Filed — Alteration
Installation of temporary sidewalk shed, supported scaffold and material hoist as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00784706-P1
08/31/2022
Permit issued — Protection and Mechanical Methods
M00784721-I1-PM
08/10/2022
Filed — Alteration
Repair mortar at underside of slab & repair steel for stair on roof; Replace missing or damaged spindles and railing on the fire escapes on the Mez, Balcony and Ground Flr as per plans (Studio 54 - Roof Replacement.) No change to use, egress or occupancy
M00768462-P1
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWinick Productions08/28/2025
DOB NOWSupported ScaffoldSigned-offBuildcox Construction11/29/2022
DOB NOWSupported ScaffoldSigned-offBuildcox Construction11/28/2022
DOB NOWMechanical SystemsPermit IssuedConstructomics09/29/2022
DOB NOWGeneral ConstructionSigned-offConstructomics09/29/2022
DOB NOWGeneral ConstructionSigned-offConstructomics09/29/2022
DOB NOWStructuralSigned-offConstructomics09/29/2022
DOB NOWGeneral ConstructionSigned-offConstructomics09/13/2022
DOB NOWMechanical SystemsPermit IssuedConstructomics09/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offBuildcox Construction08/31/2022
DOB NOWStructuralSigned-offConstructomics08/10/2022
DOB NOWGeneral ConstructionSigned-offConstructomics08/09/2022
DOB NOWSidewalk ShedSigned-offBuildcox Construction08/02/2022
DOB NOWPlumbingSigned-offPace Plumbing05/09/2022
DOB NOWMechanical SystemsPermit IssuedConstructomics09/20/2021
DOB NOWGeneral ConstructionSigned-offConstructomics09/20/2021
DOB NOWPlumbingPermit IssuedReliable Plumbing & Heating09/07/2021
DOB NOWMechanical SystemsPermit IssuedConstructomics03/02/2021
DOB NOWGeneral ConstructionSigned-offConstructomics02/17/2021
DOB NOWPlumbingPermit IssuedReliable Plumbing & Heating10/05/2020
DOB NOWPlumbingPermit IssuedReliable Plumbing & Heating12/24/2019
DOB NOWPlumbingPermit IssuedReliable Plumbing & Heating10/07/2019
BIS—ISSUEDA.M.A. Holdings05/11/2017
BISPLISSUEDPar Plumbing Co12/21/2015
BISMHISSUEDYorke Construction10/21/2015
BISOTISSUEDYorke Construction10/21/2015
BISPLISSUEDPar Plumbing Co09/23/2015
BISOTISSUEDYorke Construction07/22/2015
BISOTISSUEDYorke Construction07/08/2015
BISOTISSUEDRcdolner03/05/2012
BISMHISSUEDRcdolner03/05/2012
BISPLISSUEDMac Felder02/06/2012
BISMHISSUEDRcdolner01/31/2012
BISOTISSUEDRcdolner01/31/2012
BISEQISSUEDAll-Safe01/20/2012
BISPLISSUEDBrook Plumbing & Heating11/01/2007
BISMHISSUEDRyder Construction05/09/2007
BISOTISSUEDRyder Construction12/14/2006
BIS—ISSUEDService Sign Erectors Co11/09/2006
BIS—ISSUEDService Sign Erectors Co11/09/2006
+ 13 more permits on file
1 project · most recent 09/26/2019
Water/Sanitary
FiledStatusContractorScope
09/26/2019Permit IssuedReliable Plumbing & HeatingWater/Sanitary
3 projects · most recent 05/21/2024
General Wiring
FiledStatusContractorScope
05/21/2024CompleteFive Borough Electric1 meters
08/05/2022CompleteRichard Neu—
01/03/2022CompleteCorzo Electl SystemsGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/13/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/27/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/25/2025FinalANDY ENGLER ROTHprogress
04/06/2023FinalMAURICIO ANDRADEprogress
04/06/2023Structural Steel - WeldingMAURICIO ANDRADEspecial
04/06/2023Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
04/06/2023Structural Steel - High Strength BoltingMAURICIO ANDRADEspecial
04/06/2023Structural Steel - DetailsMAURICIO ANDRADEspecial
03/07/2023Structural Steel - WeldingMAURICIO ANDRADEspecial
03/07/2023Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
03/07/2023Structural Steel - DetailsMAURICIO ANDRADEspecial
03/07/2023Structural Steel - High Strength BoltingMAURICIO ANDRADEspecial
03/07/2023FinalMAURICIO ANDRADEprogress
12/09/2022FinalMAURICIO ANDRADEprogress
12/09/2022Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
12/09/2022Post-installed AnchorsMAURICIO ANDRADEspecial
12/09/2022Insulation placement and R valuesMAURICIO ANDRADEenergy_progress
12/09/2022Sprayed fire-resistant materialsMAURICIO ANDRADEspecial
12/09/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
12/01/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
12/01/2022Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
12/01/2022Post-installed AnchorsMAURICIO ANDRADEspecial
12/01/2022Sprayed fire-resistant materialsMAURICIO ANDRADEspecial
12/01/2022Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
12/01/2022MasonryMAURICIO ANDRADEspecial
12/01/2022Structural Steel - DetailsMAURICIO ANDRADEspecial
12/01/2022Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Valentino BeautyEvents & gatheringsFloor 1
Project M01276824 Alteration · LOC Issued · 08/26/2025
Roundabout Theatre CompanyArts / Culture / EntertainmentSub-cellar, Cellar, Floor 1, Mezzanine, Roof
Project M00784721 Alteration · LOC Issued · 08/31/2022
Project M00768462 Alteration · LOC Issued · 08/02/2022
Project M00784706 Alteration · LOC Issued · 08/01/2022
Project M00768423 Alteration · LOC Issued · 07/27/2022
Project M00462522 Alteration · LOC Issued · 02/24/2021
Project M00462542 Alteration · LOC Issued · 02/21/2021
Project M00462505 Alteration · LOC Issued · 02/05/2021
Project M00201377 Alteration · Filing Withdrawn · 09/26/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch10
09/02/2026M00768462-P1Request digital key ↗
09/02/2026M00768462-P2Request digital key ↗
09/02/2026M00768462-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/21/2026M01276712-I1Request digital key ↗
08/21/2026M01276712-P1Request digital key ↗
08/21/2026M01307914-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00201377-I1Request digital key ↗
09/04/2026M00462542-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00462505-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00462522-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
05/23/2017123064888Open ↗
02/12/2016122618989Open ↗
02/03/2016122618989Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION15
05/11/2017123064888Open ↗
01/20/2016122618989Open ↗
11/09/2015122262363Open ↗
Showing 3 of 15 on file for this type
▸BISPLACE OF ASSEMBLY1
11/18/2013121839537Open ↗
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
10/25/2017123064888Open ↗
05/23/2017123064888Open ↗
01/08/2016122618989Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/04/2026M00462505-I1Open ↗
09/04/2026M00462522-I1Open ↗
09/02/2026M00768462-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026M00201377-I1Open ↗
09/01/2026M00768462-I1Open ↗
08/27/2026M00768423-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00201377-I1Open ↗
09/02/2026M00201377-I1Open ↗
09/01/2026M00768462-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/23/2017123064888Open ↗
01/08/2016122618989Open ↗
03/13/2014121939732Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/23/2017123064888Open ↗
01/08/2016122618989Open ↗
03/13/2014121939732Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/23/2012120949983Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
02/12/2016122618989Open ↗
02/03/2016122618989Open ↗
01/29/2016122618989Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
12/29/2015122262363Open ↗
11/16/2015122262363Open ↗
10/26/2015122262363Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
09/12/2013121770681Open ↗
06/11/2012120854325Open ↗
10/13/2011120854325Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/29/2016122534481Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/04/2026M00462505-I1Open ↗
09/04/2026M00462522-I1Open ↗
09/02/2026M00768462-P2Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
05/11/2017123064888Open ↗
01/08/2016122618989Open ↗
07/07/2015122262363Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/23/2012120949983Open ↗
10/13/2011120854325Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/08/2016122618989Open ↗
02/24/2015122262363Open ↗
03/13/2014121939732Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00462522-I1Open ↗
08/13/2026M00462505-I1Open ↗
08/13/2026M00768423-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/04/2026M00462505-I1Open ↗
09/04/2026M00462522-I1Open ↗
09/01/2026M00768423-I1Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/25/2017123064888Open ↗
04/16/2012120949983Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/23/2012120949983Open ↗
10/13/2011120854325Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
10/25/2017123064888Open ↗
05/23/2017123064888Open ↗
01/08/2016122618989Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET13
05/23/2017123064888Open ↗
01/08/2016122618989Open ↗
10/12/2015122534481Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION2
11/02/2015122262363Open ↗
06/12/2015122262363Open ↗
▸BISBOROUGH INTAKE FORM1
10/25/2017123064888Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/11/2013121837600Open ↗