Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTemporary engineered enclosure system for adjoining property27p · 3 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
Protection and Mechanical Methods
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents · 1 drawing sheet
Full demolition to a one story building
On file for this project
21 documents · 3 drawing sheets
Underpinning work in conjunction with NB B01201594-I1
On file for this project
65 documents · 9 drawing sheets
Bulkhead7p · 1 filing · 20 docs
ArchitectureMechanicalPlumbingStructural
Underpinning work in conjunction with NB B01201594-I1
On file for this project
65 documents · 7 drawing sheets
Floor 6Temporary engineered enclosure system for adjoining property14p · 1 filing · 6 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents
Floor 5Temporary engineered enclosure system for adjoining property14p · 1 filing · 6 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents
Floor 4Temporary engineered enclosure system for adjoining property14p · 1 filing · 6 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents
Floor 3Temporary engineered enclosure system for adjoining property14p · 1 filing · 6 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents
Floor 2Temporary engineered enclosure system for adjoining property13p · 2 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents
Underpinning work in conjunction with NB B01201594-I1
On file for this project
65 documents · 6 drawing sheets
Floor 1Temporary engineered enclosure system for adjoining property179p · 4 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents
KNUCKLEBOOM PLACEMENT. THJIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
3 documents
Full demolition to a one story building
On file for this project
21 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Cellar13p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Full demolition to a one story building
On file for this project
21 documents · 1 drawing sheet
Underpinning work in conjunction with NB B01201594-I1
On file for this project
65 documents · 9 drawing sheets
Site & exteriorBona LLC18p · 2 filings · 8 docs
CivilEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Sidewalk Shed · Supported Scaffold
TEMPORARY ENGINEERED ENCLOSURE SYSTEM FOR ADJOINING PROPERTY PROTECTION
On file for this project
6 documents · 12 drawing sheets
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets