← Back
Predominantly retail with other uses
2294 NOSTRAND AVENUE
BROOKLYN · BIN 3207036
💬 Discuss this project
1930Year Built
2Stories
K4Building Class
R6Zoning
25,079 sfGross Floor Area
3Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 2294 NOSTRAND HOLDING, LLC · 21,000 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof9p · 5 filings · 20 docs
Floor 17p · 3 filings · 20 docs
Basement1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY CORP703/22/2026
2294 NOSTRAND HOLDING1303/22/2026
REO REALTY CONSTRUCTION C103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VINCENT J. LIOTTA P.E.107/25/2025
CHOSEN MEP, CORP.107/27/2022
IAQ SYSTEMS INC1312/17/2021
JEFFREY BRAVSTEIN105/11/2021
ASIF JAMIL, RA106/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES2803/21/2026
GREEN STUDIO203/21/2026
CITY EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM TNT LLCGeneral Contractor1007/08/2026
BNA SERVICES INCGeneral Contractor603/21/2026
ROCK GROUP NY CORPGeneral Contractor603/21/2026
GENESIS PLBG AND HTG CORPPlumbing207/08/2026
DDS MECHANICAL FPS CORPFire Protection207/08/2026
GREEN STAR ELECTL CONT INElectrical203/22/2026
AFGO MECHANICAL SVCS INCGeneral Contractor107/08/2026
REUBEN GROSSElectrical103/21/2026
DAVID CONSTRUCTING NY, INGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974107/25/2025
STEEL CORE ENGINEERING PL1098107/27/2022
SPECIAL TESTING & CONSULT1688912/17/2021
Building Lifecycle
All (137)Filed (17)Permit Issued (13)Signed Off (9)Violation (43)Inspection (1)Objection (24)Special Inspection (30)
07/30/2025
Signed off — Alteration
REPLACEMENT OF 10 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01260276-I1
07/25/2025
Filed — Alteration
REPLACEMENT OF 10 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01260276-I1
07/25/2025
Permit issued — Mechanical Systems
B01260276-I1-MS
07/23/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
07/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
07/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
07/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
07/23/2025
Special inspection requirement — Maintenance information
Vincent Liotta
07/23/2025
Special inspection requirement — Final
Vincent Liotta
03/06/2025
Violation issued (FDNY_ORDER, closed)
07/30/2024
Violation issued (FDNY_NOV, closed)
01/31/2024
Violation issued (FDNY_ORDER, closed)
01/31/2024
Violation issued (FDNY_ORDER, closed)
12/04/2023
Violation issued (FDNY_NOV, closed)
07/27/2023
Violation issued (ECB, closed)
Elevators
07/26/2023
Violation issued (FDNY_NOV, closed)
11/17/2022
Signed off — Alteration
B00781009-I1
11/09/2022
Permit issued — Mechanical Systems
B00781009-I1-MS
10/11/2022
Signed off — Alteration
B00297982-I1
07/27/2022
Filed — Alteration
B00781009-I1
07/25/2022
Special inspection requirement — Final
Gennadiy Faybyshenko
07/25/2022
Special inspection requirement — Mechanical Systems
Alexander Sheyman
12/20/2021
Special inspection requirement — HVAC insulation and sealing
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — Shutoff dampers
SEBASTIAN SETTEDUCATE JR., P.E
12/20/2021
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
12/17/2021
Filed — Alteration
B00297982-P2
12/15/2021
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — Shutoff dampers
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — HVAC insulation and sealing
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
12/15/2021
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
12/14/2021
Violation issued (FDNY_NOV, closed)
12/10/2021
Signed off — Alteration
B00478467-I1
12/01/2021
Signed off — Alteration
Installation of emergency generator for new dialysis center - see comments for PAA description
B00342624-I1
11/30/2021
Signed off — Alteration
Plumbing installation for new dialysis center. PAA scope listed in comments
B00297979-I1
11/30/2021
Signed off — Alteration
B00297977-I1
11/30/2021
Signed off — Alteration
Fuel storage tanks for emergency generator for new dialysis center. See comments for PAA
B00342606-I1
11/17/2021
Filed — Alteration
Plumbing installation for new dialysis center. PAA scope listed in comments
B00297979-P3
11/09/2021
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SEBASTIAN SETTEDUCATE JR., P.E
11/03/2021
Permit issued — Plumbing
B00297979-I1-PL
11/01/2021
Filed — Alteration
Fuel storage tanks for emergency generator for new dialysis center. See comments for PAA
B00342606-P2
10/26/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/20/2021
Permit issued — Boiler Equipment
B00342606-I1-BE
10/19/2021
Filed — Alteration
Plumbing installation for new dialysis center. PAA scope listed in comments
B00297979-P2
10/12/2021
Filed — Alteration
B00297982-P1
10/09/2021
Filed — Alteration
Plumbing installation for new dialysis center. PAA scope listed in comments
B00297979-P1
10/04/2021
Objection resolved — Addressed
09/30/2021
Objection resolved — Addressed
09/30/2021
Objection resolved — Addressed
09/30/2021
Objection resolved — Addressed
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS07/25/2025
DOB NOWMechanical SystemsSigned-offPLATINUM TNT LLC11/09/2022
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP11/03/2021
DOB NOWBoiler EquipmentSigned-offRB HTG CONSULTING GROUP10/20/2021
DOB NOWBoiler EquipmentSigned-offRB HTG CONSULTING GROUP08/12/2021
DOB NOWMechanical SystemsSigned-offDAVID CONSTRUCTING NY, IN07/06/2021
DOB NOWMechanical SystemsSigned-offBNA SERVICES INC07/01/2021
DOB NOWStructuralSigned-offBNA SERVICES INC07/01/2021
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP05/07/2021
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP01/13/2021
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP08/12/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/21/2018
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP06/20/2018
BISOTISSUEDTHREE W ENTERPRISES INC10/26/2020
BISOTISSUEDTHREE W ENTERPRISES INC04/27/2020
BIS—ISSUEDPLATINUM TNT LLC02/26/2020
BISPLISSUEDABSOLUTE PLBG HTG & MECH08/13/2018
BISEQISSUEDPLATINUM TNT LLC07/24/2018
BIS—ISSUEDPLATINUM TNT LLC07/16/2018
BIS—ISSUEDPLATINUM TNT LLC07/24/2017
BISEQISSUEDPLATINUM TNT LLC07/24/2017
BISSPISSUEDFIRE SPRINKLER ASSOC INC08/04/2015
BISPLISSUEDA & M WARSHAW PLBG & HTG07/28/2015
BISOTISSUEDTRICON CONSTRUCTION LLC07/10/2015
BISMHISSUEDPLATINUM INSTALLATIONS IN04/13/2015
BISPLISSUEDJODOM MECHANICAL, INC04/03/2015
BIS—ISSUEDPLATINUM INSTALLATIONS IN01/14/2015
BISEQISSUEDPLATINUM INSTALLATIONS IN01/14/2015
BISOTISSUEDRTS NOSTRAND LLC08/18/2014
BIS—ISSUEDNORTH SHORE NEON SIGN CO12/13/2013
BIS—ISSUEDNORTH SHORE NEON SIGN CO12/13/2013
BISPLISSUEDOLYMPIA MECHANICAL PIPING & HTG04/28/2003
BISOTISSUEDALDOM SIGNS CO02/10/1998
BISPLISSUEDTMS PLMBG & HTG CORP01/13/1998
BIS—ISSUEDPHD CORP01/13/1998
BISEQISSUEDPHD CORP01/13/1998
BISOTISSUEDPHD CORP08/19/1997
BISPLISSUEDMAIN LAND PLUMBING10/30/1995
BISOTISSUEDT.S.J. CONSTRUCTION10/30/1995
7 projects · most recent 07/01/2021
General Wiring
FiledStatusContractorScope
07/01/2021CompleteGREEN STAR ELECTL CONT IN3 meters, 3 new_meters
11/04/2020CompleteUNITED ELEC'L CONT'G CORPGeneral Wiring
08/13/2019CompleteGREEN STAR ELECTL CONT IN—
02/06/2019CompleteJAM ELECTRICAL CORP—
11/06/2018CompleteGREEN STAR ELECTL CONT INGeneral Wiring
11/06/2018CompleteGREEN STAR ELECTL CONT IN—
06/08/2018CompleteLINTECH ELECTRIC, INC.—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/26/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/23/2025Mechanical SystemsVincent Liottaspecial
07/23/2025HVAC-R and service water heating system controlsVincent Liottaenergy_progress
07/23/2025HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
07/23/2025HVAC-R and service water heating equipmentVincent Liottaenergy_progress
07/23/2025Maintenance informationVincent Liottaenergy_progress
07/23/2025FinalVincent Liottaprogress
07/25/2022FinalGennadiy Faybyshenkoprogress
07/25/2022Mechanical SystemsAlexander Sheymanspecial
12/20/2021HVAC insulation and sealing SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/20/2021Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/20/2021Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
12/20/2021Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/20/2021FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
12/20/2021HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/20/2021Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/20/2021Shutoff dampersSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/20/2021HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/15/2021Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/15/2021Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/15/2021Shutoff dampersSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/15/2021HVAC insulation and sealing SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/15/2021Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/15/2021HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
12/15/2021Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
12/15/2021FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
Latest 25 of 30.
▾Documents — 456 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/02/2026B00342624-I1Request digital key ↗
09/01/2026B00297982-I1Request digital key ↗
09/01/2026B00297982-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00297979-P1Request digital key ↗
09/02/2026B00297979-I1Request digital key ↗
09/02/2026B00297979-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/02/2026B00342606-P2Request digital key ↗
08/15/2026B00342606-P1Request digital key ↗
08/15/2026B00342606-I1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/01/2026B00478467-I1Request digital key ↗
09/01/2026B00051657-I1Request digital key ↗
08/21/2026B01260276-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00297977-I1Request digital key ↗
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION63
01/18/2024321500997Open ↗
01/17/2024321500997Open ↗
01/10/2024321500997Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION19
04/27/2020322040910Open ↗
02/28/2020321500997Open ↗
07/23/2019321500997Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
08/08/2019321500997Open ↗
08/08/2019321500997Open ↗
06/27/2019321500997Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
07/12/2019321500997Open ↗
07/05/2019321500997Open ↗
Showing 2 of 3 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
10/17/2019321500997Open ↗
10/07/2019321500997Open ↗
05/01/2017321500997Open ↗
▸BISZONING DIAGRAM2
05/14/2018321500997Open ↗
07/26/2017321500997Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/05/2017321500997Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/05/2017321500997Open ↗
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
04/27/2020322040910Open ↗
02/14/2020322040910Open ↗
09/11/2019321500997Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026B00051657-I1Open ↗
09/01/2026B00478467-I1Open ↗
08/13/2026B00342624-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B01260276-I1Open ↗
09/23/2026B01260276-I1Open ↗
08/28/2026B00781009-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01260276-I1Open ↗
09/01/2026B00342606-P1Open ↗
08/29/2026B00342606-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
04/27/2018321500997Open ↗
05/03/2017321500997Open ↗
Showing 2 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS4
01/02/2020321500997Open ↗
01/02/2020321500997Open ↗
01/02/2020321500997Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
01/02/2020321500997Open ↗
01/02/2020321500997Open ↗
01/02/2020321500997Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
11/22/2019321500666Open ↗
02/18/2016321105111Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
02/05/2016321176071Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST5
12/26/2019321500997Open ↗
12/29/2016321500997Open ↗
Showing 2 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN3
12/26/2019321500997Open ↗
10/17/2019321500997Open ↗
10/07/2019321500997Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT2
12/26/2019321500997Open ↗
06/30/2017321500997Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/01/2026B00478467-I1Open ↗
08/13/2026B00297982-I1Open ↗
08/13/2026B00297982-P1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
12/20/2021322040910Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
07/25/2017321500997Open ↗
07/25/2017321500997Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
02/14/2020322040910Open ↗
09/11/2019321500997Open ↗
07/25/2017321500997Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
12/02/2021322040910Open ↗
09/11/2019321500997Open ↗
07/14/2016321199396Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸BISHYDRAULIC FLOW CALCULATIONS1
05/01/2017321500997Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/11/2019321500997Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/02/2021322040910Open ↗
▸BISDEP Hydrant Flow Test Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs64
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
12/20/2021322040910Open ↗
02/09/2021321500997Open ↗
11/18/2020321500997Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
01/18/2024321500997Open ↗
01/17/2024321500997Open ↗
01/10/2024321500997Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
05/14/2020321500997Open ↗
05/01/2017321500997Open ↗
04/06/2016321199396Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT32
12/07/2021322040910Open ↗
02/14/2020322040910Open ↗
10/17/2019321500997Open ↗
Showing 3 of 32 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
02/28/2020321500997Open ↗
07/23/2019321500997Open ↗
07/17/2018321500997Open ↗
Showing 3 of 5 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET20
02/14/2020322040910Open ↗
02/15/2019321771141Open ↗
05/03/2017321500666Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION18
10/19/2021321500997Open ↗
10/08/2021322040910Open ↗
08/20/2020321500997Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM8
02/20/2020321500997Open ↗
12/26/2019321500997Open ↗
11/21/2019321500997Open ↗
Showing 3 of 8 on file for this type
▸Other Documents6
▸BISPLOT DIAGRAM4
10/17/2019321500997Open ↗
10/07/2019321500997Open ↗
Showing 2 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/28/2022321771141Open ↗
▸BISPROVIDE FINAL SURVEY DUE TO ENLARGMENT.1
11/01/2023321500997Open ↗