← Back
BuildNYC
Three families
2295 LORING PLACE NORTH
BRONX · BIN 2014979
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R5Zoning
3,040 sfGross Floor Area
3Units
1 Active Violation ▸
Three families · Owner of record: Loring · 2,500 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 33p · 1 filing · 11 docs
Floor 25p · 1 filing · 11 docs
Floor 12p · 1 filing · 11 docs
Cellar7p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Valentine WL1103/22/2026
Loring103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/23/2020$720K—Private party → LORING LLC$237/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E312/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ibuild Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Primrose ServiceGeneral Contractor303/21/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E7129312/11/2024
Building Lifecycle
All (22)Filed (3)Permit Issued (2)Signed Off (2)Violation (6)Inspection (7)Special Inspection (2)
01/15/2025
Signed off — Alteration
REMOVAL/INSTALLATION OF PLUMBING FIXTURES AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01089028-S1
12/11/2024
Filed — Alteration
REMOVAL/INSTALLATION OF PLUMBING FIXTURES AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01089028-P1
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
12/02/2024
Signed off — Alteration
REMOVAL/INSTALLATION OF PLUMBING FIXTURES AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01089028-I1
11/27/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/07/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/12/2024
Permit issued — General Construction
X01089028-I1-GC
08/12/2024
Permit issued — Plumbing
X01089028-S1-PL
08/06/2024
Filed — Alteration
REMOVAL/INSTALLATION OF PLUMBING FIXTURES AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01089028-S1
08/06/2024
Filed — Alteration
REMOVAL/INSTALLATION OF PLUMBING FIXTURES AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X01089028-I1
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/20/2024
Violation issued (HPD, closed)
B
06/20/2024
Violation issued (HPD, closed)
A
06/20/2024
Violation issued (HPD, open)
B
03/02/2022
Violation issued (ECB, closed)
Construction
11/29/2003
Violation issued (ECB, closed)
HPD
11/05/2003
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPrimrose Service08/12/2024
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co08/12/2024
BIS—ISSUEDN/A05/06/2015
BISPLISSUEDL.L.G. Plumbing & Heating02/07/2012
BIS—ISSUEDNova Vasquez & Associates08/30/2011
BISPLISSUEDL.L.G. Plumbing & Heating09/22/2009
BIS—ISSUEDNova Vasquez & Associates06/08/2009
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/27/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/14/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/07/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
12/11/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/31/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X01089028-S1Request digital key ↗
08/21/2026X01089028-P1Request digital key ↗
08/21/2026X01089028-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
02/10/2025201130837Open ↗
05/15/2018201130837Open ↗
▸BISWORK PERMIT APPLICATION1
09/01/2011201130837Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026X01089028-P1Open ↗
08/13/2026X01089028-S1Open ↗
08/13/2026X01089028-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/25/2026X01089028-S1Open ↗
08/24/2026X01089028-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026X01089028-P1Open ↗
08/13/2026X01089028-S1Open ↗
08/13/2026X01089028-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/01/2011201130837Open ↗
09/01/2011201130837Open ↗
09/01/2011201130837Open ↗