← Back
BuildNYC
Three families
2297 CROTONA AVENUE
BRONX · Belmont · BIN 2102206
💬 Discuss this project
2000Year Built
2Stories
C0Building Class
R7-1Zoning
3,387 sfGross Floor Area
3Units
Rent Stabilized43 Active Violations 42 unresolved · 1 paperwork only 3 old, status unconfirmed ▸
Three families · 1,840 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofConvert basement to dwelling unit, create three-family build1p · 1 filing · 10 docs
Floor 2Convert basement to dwelling unit, create three-family build4p · 1 filing · 10 docs
Floor 1Convert basement to dwelling unit, create three-family build4p · 1 filing · 10 docs
CellarResidential sprinkler system installation5p · 2 filings · 20 docs
BasementConvert basement to dwelling unit, create three-family build4p · 1 filing · 10 docs
Sub-BasementResidential sprinkler system installation9p · 1 filing · 12 docs
Site & exteriorConvert basement to dwelling unit, create three-family build4p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3320 WPR1204/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/01/2015$300K—Private party → 2297 CROTONA AVE LLC$89/sf building
10/23/2013$300K—Private party → Private party$89/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tabriz Design Group310/01/2025
Tabriz Group Enterprises104/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BT's Plumbing and HeatingPlumbing107/08/2026
Jasm Realty LaneGeneral Contractor907/14/2000
L. Richards PLG & HeatingPlumbing112/30/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275410/01/2025
Building Lifecycle
11/23/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
X01033798-I1-PL
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/27/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
X01033777-I1-GC
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
113 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT's Plumbing and Heating12/12/2025
DOB NOWGeneral ConstructionPermit IssuedPR03/27/2025
BIS—ISSUEDJasm Realty Lane07/14/2000
BISEQISSUEDJasm Realty Lane05/10/2000
BISEQISSUEDJasm Realty Lane05/10/2000
BIS—ISSUEDJasm Realty Lane05/10/2000
BIS—ISSUEDJasm Realty Lane05/10/2000
BISPLISSUEDL.richards Plumbing & Heating12/30/1999
BISEQISSUEDJasm Realty Lane09/28/1999
BISEQISSUEDJasm Realty Lane09/28/1999
BIS—ISSUEDJasm Realty Lane09/28/1999
BIS—ISSUEDJasm Realty Lane09/28/1999
1 project · most recent 10/01/2025
Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
10/01/2025Permit IssuedBT's Plumbing and HeatingPlumbing-Sprinkler, Water/Sanitary
1 project · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025Permit IssuedWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/02/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/01/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
10/18/2024HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
10/07/2024MeteringBAKHTIAR SHAMLOOenergy_progress
09/27/2024Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
09/25/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/17/2024Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
04/17/2024Maintenance informationBAKHTIAR SHAMLOOenergy_progress
04/17/2024Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
04/17/2024Permanent certificateBAKHTIAR SHAMLOOenergy_progress
04/17/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/10/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account