← Back
BuildNYC
Two stories - detached, small or mid-size
23-03 160TH STREET
QUEENS · BIN 4110395
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,840 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction13p · 1 filing · 20 docs
Site & exteriorConstruction fence installationUnder Construction1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E409/22/2026
Mei Architect106/25/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor309/25/2026
L&L Construction DevelopmentScaffold109/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E7129409/22/2026
Building Lifecycle
All (51)Filed (5)Permit Issued (4)Objection (12)Special Inspection (30)
09/24/2026
Permit issued — General Construction
Q01415882-I1-GC
09/24/2026
Permit issued — Foundation
Q01415882-S1-FO-EA
09/24/2026
Permit issued — Construction Fence
Q01463844-I1-FN
09/24/2026
Permit issued — General Construction
Q01415882-I1-MS
09/22/2026
Filed — Alteration CO
INSTALLATION OF STRUCTURAL WORK INVOLVED IN PARTIAL DEMOLITION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01415882-S3
09/22/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01463844-I1
09/22/2026
Filed — Alteration CO
INSTALLATION OF STRUCTURAL WORK INVOLVED IN PARTIAL DEMOLITION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01415882-S2
09/22/2026
Filed — Alteration CO
INSTALLATION OF STRUCTURAL WORK INVOLVED IN PARTIAL DEMOLITION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01415882-S1
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
09/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
09/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
09/21/2026
Special inspection requirement — Masonry
MEHDI GHAZI
09/21/2026
Special inspection requirement — Final
MEHDI GHAZI
09/21/2026
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
09/09/2026
Objection resolved — Addressed
09/09/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
08/11/2026
Objection raised — Energy
08/11/2026
Objection raised — Admin
08/11/2026
Objection raised — Scope
08/11/2026
Objection raised — Other
08/11/2026
Objection raised — Structural
08/11/2026
Objection raised — Structural
06/25/2026
Filed — Alteration CO
INSTALLATION OF STRUCTURAL WORK INVOLVED IN PARTIAL DEMOLITION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01415882-I1
06/19/2026
Special inspection requirement — Heating Systems
06/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/19/2026
Special inspection requirement — Energy Code Compliance Inspections
06/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/19/2026
Special inspection requirement — Air barrier — testing
06/19/2026
Special inspection requirement — Fenestration areas
06/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/19/2026
Special inspection requirement — Air barrier - visual inspection
06/19/2026
Special inspection requirement — Maintenance information
06/19/2026
Special inspection requirement — Insulation placement and R values
06/19/2026
Special inspection requirement — Fenestration air leakage
06/19/2026
Special inspection requirement — Metering
06/19/2026
Special inspection requirement — Permanent certificate
06/19/2026
Special inspection requirement — Interior lighting power
06/19/2026
Special inspection requirement — Protection of exposed foundation insulation
06/19/2026
Special inspection requirement — Ventilation and air distribution system
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development09/24/2026
DOB NOWFoundationPermit IssuedL&L Construction Development09/24/2026
DOB NOWConstruction FencePermit IssuedL&L Construction Development09/24/2026
DOB NOWGeneral ConstructionPermit IssuedL&L Construction Development09/24/2026
1 project · most recent 09/22/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/22/2026——Storm, Water/Sanitary
1 project · most recent 09/22/2026
Masonry Wood
FiledStatusContractorScope
09/22/2026Permit IssuedL&L Construction DevelopmentMasonry, Wood
1 project · most recent 09/22/2026
Fence
FiledStatusContractorScope
09/22/2026Permit IssuedL&L Construction DevelopmentFence
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/21/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
09/21/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
09/21/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
09/21/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
09/21/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
09/21/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
09/21/2026MasonryMEHDI GHAZIspecial
09/21/2026FinalMEHDI GHAZIprogress
09/21/2026Structural Wood FrameMEHDI GHAZIprogress
06/19/2026Heating Systems—special
06/19/2026Subsurface Investigations (Borings/Test Pits)—special
06/19/2026Fire-Resistance Rated Construction—progress
06/19/2026Energy Code Compliance Inspections—progress
06/19/2026Fenestration and door U-factor and product ratings—energy_progress
06/19/2026HVAC-R and service water heating system controls—energy_progress
06/19/2026Air barrier — testing —energy_progress
06/19/2026Fenestration areas—energy_progress
06/19/2026HVAC-R and service water heating equipment—energy_progress
06/19/2026HVAC-R and service water piping design and insulation—energy_progress
06/19/2026Air barrier - visual inspection—energy_progress
06/19/2026Maintenance information—energy_progress
06/19/2026Insulation placement and R values—energy_progress
06/19/2026Fenestration air leakage—energy_progress
06/19/2026Metering—energy_progress
06/19/2026Permanent certificate—energy_progress
Latest 25 of 32.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
10/04/2026Q01463844-I1Request digital key ↗
08/16/2026Q01415882-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01415882-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/26/2026Q01463844-I1Open ↗
09/26/2026Q01415882-S3Open ↗
09/26/2026Q01415882-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/26/2026Q01415882-S2Open ↗
09/26/2026Q01415882-S3Open ↗
09/26/2026Q01415882-S3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/26/2026Q01415882-S2Open ↗
09/26/2026Q01415882-S3Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/26/2026Q01415882-S2Open ↗
09/26/2026Q01415882-S3Open ↗
09/26/2026Q01415882-S1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
09/26/2026Q01415882-S1Open ↗
08/16/2026Q01415882-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
09/26/2026Q01415882-S1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/16/2026Q01415882-I1Open ↗
▸DOB NOWPlot Diagram1
09/26/2026Q01415882-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01415882-I1Open ↗