← Back
Elevator apt, semi-fireproof with stores
23-09 BROADWAY
QUEENS · BIN 4623428
💬 Discuss this project
2021Year Built
7Stories
D7Building Class
R6AZoning
14,301 sfGross Floor Area
11Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: EVEREST 2309 BROADWAY LLC · 3,979 sf lot · 3.59 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING407/08/2026
EVEREST 2309 BROADWAY2503/22/2026
AKM CONSTRUCTION NY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2018$3.0M—R&B 15 PROPERTIES, LLC → EVEREST 2309 BROADWAY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE1203/21/2026
ALLCITYEXPEDITING403/21/2026
AE DESIGN SOLUTION203/21/2026
NDKAZALAS ARCHITECTURE103/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKM CONSTRUCTION NY CORPGeneral Contractor507/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor407/08/2026
EVEREST USA CORPGeneral Contractor207/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304305/30/2023
JOEL PHAGOO ,PE, PLLC2416306/29/2021
Building Lifecycle
All (74)Filed (13)Permit Issued (9)Signed Off (6)Violation (25)Inspection (1)Objection (10)Special Inspection (10)
05/11/2026
Violation issued (HPD, open)
A
01/14/2026
Permit issued — Sign
Q01103456-I1-SG
06/16/2025
Violation issued (HPD, open)
A
09/26/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MATHNASIUM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01103456-I1
10/24/2023
Signed off — Alteration
INSTALLATION OF BOILERS IN NEW RESIDENTIAL BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 421640139.
Q08044320-I1
09/13/2023
Signed off — Alteration
Installation of construction fence to protect site
Q00475938-I1
07/12/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00253097-I1
05/30/2023
Filed — Alteration
INSTALLATION OF BOILERS IN NEW RESIDENTIAL BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 421640139.
Q08044320-P1
05/30/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
05/30/2023
Special inspection requirement — Heating Systems
Naeem Anwar
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
05/30/2023
Special inspection requirement — Maintenance information
Naeem Anwar
05/22/2023
Permit issued — Boiler Equipment
Q08044320-I1-BE
03/17/2023
Permit issued — Construction Fence
Q00475938-I1-FN
12/05/2022
Filed — Alteration
INSTALLATION OF BOILERS IN NEW RESIDENTIAL BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 421640139.
Q08044320-I1
08/24/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD DURING NB CONST FILED SEP. SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00489436-I1
08/24/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00446224-I1
05/24/2022
Violation issued (ECB, closed)
Construction
05/05/2022
Permit issued — Sidewalk Shed
Q00253097-I1-SH
04/06/2022
Violation issued (ECB, closed)
Construction
03/24/2022
Permit issued — Sidewalk Shed
Q00446224-I1-SH
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2021
Violation issued (ECB, closed)
Construction
12/02/2021
Violation issued (ECB, closed)
Construction
10/05/2021
Signed off — Alteration
Q00500796-I1
09/28/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Violation issued (ECB, closed)
Construction
09/23/2021
Violation issued (ECB, closed)
Unknown
06/30/2021
Special inspection requirement — Final
JOEL PHAGOO
06/30/2021
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
06/29/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD DURING NB CONST FILED SEP. SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00489436-P2
06/18/2021
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
06/15/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Violation issued (ECB, closed)
Construction
06/15/2021
Violation issued (ECB, closed)
Construction
06/08/2021
Permit issued — Protection and Mechanical Methods
Q00500796-I1-PM
05/03/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD DURING NB CONST FILED SEP. SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00489436-P1
04/28/2021
Permit issued — Supported Scaffold
Q00489436-I1-SF
04/27/2021
Special inspection requirement — Final
JOEL PHAGOO
04/23/2021
Filed — Alteration
Q00500796-I1
04/23/2021
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
04/20/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00446224-P3
04/01/2021
Objection raised — 2014-SFBC 3314.3.4-Design-Buil
04/01/2021
Objection resolved — Addressed
04/01/2021
Objection raised — 2014-SFBC 3314.4.4-Safeguards-
04/01/2021
Objection resolved — Addressed
04/01/2021
Objection raised — 2014-SFBC 3314.4.4-Design load
04/01/2021
Objection resolved — Addressed
03/31/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD DURING NB CONST FILED SEP. SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00489436-I1
03/30/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00446224-P2
03/29/2021
Permit issued — Construction Fence
Q00475938-I1-FN
03/08/2021
Violation issued (ECB, closed)
Construction
03/08/2021
Violation issued (ECB, closed)
Construction
02/26/2021
Objection raised — Scope
02/26/2021
Objection resolved — Addressed
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedMAD SIGNS INC01/14/2026
DOB NOWBoiler EquipmentSigned-offFLAVIO MECHANICAL CORP05/22/2023
DOB NOWConstruction FenceSigned-offEVEREST USA CORP03/17/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/05/2022
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY03/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY06/08/2021
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY04/28/2021
DOB NOWConstruction FenceSigned-offEVEREST USA CORP03/29/2021
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY01/05/2021
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP05/08/2023
BIS—ISSUEDEVEREST USA CORP02/20/2023
BISPLISSUEDTOP DOG PLBG & HTG CORP09/29/2022
BIS—ISSUEDEVEREST USA CORP03/04/2022
BIS—ISSUEDEVEREST USA CORP09/20/2021
BISPLISSUEDTOP DOG PLBG & HTG CORP04/27/2021
BIS—ISSUEDEVEREST USA CORP02/17/2021
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP12/03/2020
BIS—ISSUEDEVEREST USA CORP06/26/2020
BIS—ISSUEDEVEREST USA CORP06/26/2020
BISPLISSUEDCRESCENT PLUMBING05/15/1992
BIS—ISSUEDTOP RIDGE BUILDERS, INC.03/04/1992
BISEQISSUEDTOP RIDGE BUILDERS, INC.03/04/1992
3 projects · most recent 02/12/2024
General Wiring
FiledStatusContractorScope
02/12/2024CompleteBRANDL ELECTRIC INC.General Wiring
07/25/2021CompleteJAM ELECTRICAL CORP—
01/05/2021CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/30/2023HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
05/30/2023HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
05/30/2023Heating SystemsNaeem Anwarspecial
05/30/2023HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
05/30/2023Maintenance informationNaeem Anwarenergy_progress
06/30/2021FinalJOEL PHAGOOprogress
06/30/2021Post-installed AnchorsJOEL PHAGOOspecial
06/18/2021Post-installed AnchorsJOEL PHAGOOspecial
04/27/2021FinalJOEL PHAGOOprogress
04/23/2021Post-installed AnchorsJOEL PHAGOOspecial
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch7
08/27/2026Q00500796-I1Request digital key ↗
08/27/2026Q00489436-P2Request digital key ↗
08/27/2026Q00489436-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
08/28/2026Q00253097-I1Request digital key ↗
08/27/2026Q00446224-I1Request digital key ↗
08/15/2026Q00446224-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026Q00475938-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION20
05/06/2024421640139Open ↗
04/12/2024421640139Open ↗
03/25/2024421640139Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION10
07/19/2023421640139Open ↗
07/19/2023421640139Open ↗
07/18/2023421640139Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
06/09/2023440708753Open ↗
06/09/2023440708753Open ↗
03/22/2022440708753Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
06/09/2023440708753Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
04/23/2019421640139Open ↗
04/23/2019421640139Open ↗
▸BISVERIFY TAX LOT1
10/04/2022421640139Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/04/2022421640139Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00253097-I1Open ↗
08/27/2026Q00475938-I1Open ↗
08/27/2026Q00446224-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/13/2020421640139Open ↗
07/13/2020421640139Open ↗
06/22/2020421640139Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q08044320-P1Open ↗
09/01/2026Q08044320-P1Open ↗
09/01/2026Q08044320-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q08044320-P1Open ↗
08/31/2026Q00489436-P2Open ↗
08/29/2026Q00489436-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/22/2022440708753Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/22/2022440708753Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/09/2019421640139Open ↗
04/09/2019421640139Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/25/2023421640139Open ↗
▸BISSPRINKLER SYSTEMS1
07/25/2023421640139Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/25/2023421640139Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
06/16/2023421640139Open ↗
06/09/2023440708753Open ↗
10/16/2018421640139Open ↗
▸BISSTREET TREES SITE PLAN3
07/08/2024421640139Open ↗
05/24/2023440708753Open ↗
05/24/2023421640139Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/09/2023440708753Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/22/2020421640139Open ↗
▸BISSTREET TREE SIGNOFF1
07/24/2024421640139Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/22/2020421640139Open ↗
06/22/2020421640139Open ↗
04/22/2019421640139Open ↗
Showing 3 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/25/2023421640139Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/25/2023421640139Open ↗
▸BISFENESTRATION AREAS1
07/25/2023421640139Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/30/2024421640139Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/25/2023421640139Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/25/2023421640139Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/25/2023421640139Open ↗
▸BISELECTRIC MOTORS1
07/25/2023421640139Open ↗
▸BISLIGHTING CONTROLS1
07/25/2023421640139Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/25/2023421640139Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q08044320-I1Open ↗
▸Inspections & Test Reports16
▸BISBPP - Inspection Appointment Form3
07/20/2023440708753Open ↗
06/09/2023440708753Open ↗
06/09/2023440708753Open ↗
▸BISHYDRO FLOW TEST LETTER3
07/30/2020421640139Open ↗
07/13/2020421640139Open ↗
06/22/2020421640139Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/29/2020421640139Open ↗
06/29/2020421640139Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/25/2023421640139Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/21/2023421640139Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/21/2023421640139Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/25/2023421640139Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
03/21/2023421640139Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/22/2020421640139Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/23/2019421640139Open ↗
▸BISMECHANICAL SYSTEMS1
07/25/2023421640139Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE3
05/06/2024421640139Open ↗
04/16/2019421640139Open ↗
10/16/2018421640139Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff3
07/20/2023440708753Open ↗
05/31/2023440708753Open ↗
03/22/2022440708753Open ↗
▸BISSUPERSEDING LETTER3
07/19/2023421640139Open ↗
07/19/2023421640139Open ↗
06/30/2021421640139Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE3
04/13/2022421640139Open ↗
10/01/2021421640139Open ↗
06/22/2020421640139Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction2
06/09/2023440708753Open ↗
06/09/2023440708753Open ↗
▸BISCOST AFFIDAVIT1
03/25/2019421951613Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/23/2023421951613Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION7
06/11/2024421640139Open ↗
12/06/2023421640139Open ↗
11/15/2022440708753Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET7
05/02/2019421725271Open ↗
04/18/2019421640139Open ↗
04/18/2019421640139Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
07/19/2023421640139Open ↗
07/19/2023421640139Open ↗
07/18/2023421640139Open ↗
Showing 3 of 6 on file for this type
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION3
06/09/2023440708753Open ↗
06/09/2023440708753Open ↗
06/09/2023440708753Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/09/2023440708753Open ↗
10/01/2021421640139Open ↗
▸BISLOWEST FLOOR ELEVATION1
03/21/2023421640139Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/03/2020421640139Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/15/2022440708753Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/21/2023421640139Open ↗
▸BISMAINTENANCE INFORMATION1
07/25/2023421640139Open ↗
▸BISPLOT DIAGRAM1
04/23/2019421640139Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
08/01/2023421640139Open ↗