2022Year Built
35Stories
D7Building Class
M1-6/R10Zoning
229,971 sfGross Floor Area
241Units
LL97 CoveredRent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 42ND ROAD LIC PROPERTY OWNER LLC · 10,954 sf lot · 20.99 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneral
Roof3p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 151p · 1 filing · 2 docs
Floor 141p · 1 filing · 2 docs
Floor 131p · 1 filing · 2 docs
Floor 121p · 1 filing · 2 docs
Floor 111p · 1 filing · 2 docs
Floor 101p · 1 filing · 2 docs
Floor 91p · 1 filing · 2 docs
Floor 81p · 1 filing · 2 docs
Floor 71p · 1 filing · 2 docs
Floor 61p · 1 filing · 2 docs
Floor 51p · 1 filing · 2 docs
Floor 41p · 1 filing · 2 docs
Floor 3218p · 2 filings · 20 docs
Floor 2220p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DORIA1707/08/2026
WERWAISS COMPANY12207/08/2026
TRIDENT GENERAL CONTRACTING307/08/2026
42ND ROAD LIC PROPERTY OWNER1503/22/2026
SUFFOLK CONSTRUCTION COMP303/22/2026
COMP SUFFOLK CONSTRUCTION403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor1507/08/2026
SUFFOLK CONSTRUCTION COMPGeneral Contractor1007/08/2026
TRIDENT GENERAL CONTRACTGeneral Contractor807/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection607/08/2026
ELICC AMERICAS CORPORATIONGeneral Contractor507/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor307/08/2026
PEAK FIRE PROTECTION LLCFire Protection307/08/2026
DEMAR PLUMBING CORPGeneral Contractor304/09/2026
ALMAR PLUMBING & HTG CORPPlumbing307/08/2026
GREG LOGISTICS LLCGeneral Contractor203/21/2026
HIGHRISE SAFETY SYSTEMS IGeneral Contractor207/08/2026
SIGNS CADScaffold107/08/2026
DEMAR PLUMBING CORPFire Protection107/08/2026
ANCORA ENGINEERING, PLLCGeneral Contractor103/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
DORIA SCAFFOLDING LLCGeneral Contractor107/08/2026
RAEL AUTOMATIC SPRGeneral Contractor103/22/2026
STAR ELECL CONTRACTORS C 003267General Contractor103/22/2026
WINDHAM RESTORATION CORPGeneral Contractor107/08/2026
PARKVIEW P&H INCPlumbing107/08/2026
SKF ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432410/21/2025
SKYLINE RIGGING7880604/29/2025
ADVANCED ENGINEERING & IN1224202/04/2025
VALJATO ENGINEERING PC2486105/24/2023
ANCORA ENGINEERING, PLLC6818202/21/2023
DESIMONE CONSULTING ENGIN5942402/21/2023
Building Lifecycle
All (267)Filed (56)Permit Issued (50)Signed Off (25)Violation (10)Inspection (21)Objection (72)Special Inspection (30)Tax Incentive (3)
06/04/2026
Signed off — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-I1
11/21/2025
Signed off — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-S6
11/06/2025
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
11/06/2025
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
10/30/2025
Signed off — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-S4
10/29/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
10/22/2025
Objection resolved — Addressed
10/21/2025
Filed — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-B3
10/20/2025
Objection raised — Admin
10/08/2025
Filed — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-A6
10/03/2025
Signed off — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-S7
10/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00842084-I1
10/02/2025
Signed off — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-S5
09/30/2025
Filed — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-B2
09/05/2025
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Metering
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Ventilation and air distribution system
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Fireplaces
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
09/05/2025
Special inspection requirement — Final
JOHN MCMONAGLE
08/21/2025
Filed — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-A5
08/12/2025
Signed off — Alteration
Bosun Chair Installation Locations Added for Facade Restoration and Inspection
Q01148836-I1
08/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
07/15/2025
Signed off — Alteration
NSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
Q01130447-I1
07/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01213220-I1
06/16/2025
Violation issued (HPD, closed)
A
06/12/2025
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00879219-I1
06/10/2025
Permit issued — Suspended Scaffold
Q01130447-I1-SC
06/01/2025
421-a(16) construction completed
05/19/2025
Filed — New Building
Sprinkler/standpipe work related to new building as shown on plans filed herewith.
Q00548195-A3
05/14/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00670719-I1
05/08/2025
Signed off — Alteration
USE OF MINI CRANE AT 23-10 42nd RD DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER Q00548195
Q00880510-I1
05/08/2025
Signed off — Alteration
Q00875196-I1
05/01/2025
Signed off — Alteration
APPLICATION FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC28-111 AND BB 2010-002. Application filed in conjunction with NB # Q00548195.
Q01134823-I1
04/29/2025
Filed — Alteration
NSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
Q01130447-P5
04/29/2025
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
04/29/2025
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
04/24/2025
Permit issued — Sidewalk Shed
Q01213220-I1-SH
04/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01213220-I1
04/18/2025
Signed off — Alteration
ERECT NON-ILLUMINATED, ACCESSORY BUSINESS SIGN ON EXISTING CANOPY
Q01187211-I1
04/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
Q00842084-P4
04/08/2025
Filed — Alteration
NSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS AND MATERIAL HOIST PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
Q01130447-P4
04/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2025
Special inspection requirement — Insulation placement and R values
Jennifer Sze
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Jennifer Sze
04/02/2025
Special inspection requirement — Air barrier - visual inspection
Jennifer Sze
04/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jennifer Sze
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/02/2025
Special inspection requirement — Air barrier continuity plan testing
Jennifer Sze
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDORIA SCAFFOLDING06/10/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC04/24/2025
DOB NOWSuspended ScaffoldPermit IssuedWINDHAM RESTORATION CORP04/01/2025
DOB NOWSignSigned-offSIGNS CAD CORP03/31/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC03/05/2025
DOB NOWPlumbingSigned-offALMAR PLUMBING & HTG CORP02/03/2025
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/23/2025
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/16/2025
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/16/2025
DOB NOWSuspended ScaffoldSigned-offSPYDER WINDOW CLEANING IN12/19/2024
DOB NOWGeneral ConstructionSigned-offSUFFOLK CONSTRUCTION COMP12/11/2024
DOB NOWSuspended ScaffoldPermit IssuedDORIA, INC10/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offGREG LOGISTICS LLC10/03/2024
DOB NOWGeneral ConstructionPermit IssuedSUFFOLK CONSTRUCTION COMP09/03/2024
DOB NOWProtection and Mechanical MethodsSigned-offELICC AMERICAS CORPORATIO07/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offELICC AMERICAS CORPORATIO07/09/2024
DOB NOWMechanical SystemsSigned-offDEMAR PLUMBING CORP05/06/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/10/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC03/21/2024
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC03/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC03/21/2024
DOB NOWPlumbingSigned-offALMAR PLUMBING & HTG CORP03/06/2024
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC01/10/2024
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC01/10/2024
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC01/09/2024
DOB NOWStandpipeSigned-offDEMAR PLUMBING CORP10/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWGeneral ConstructionPermit IssuedSUFFOLK CONSTRUCTION COMP09/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offELICC AMERICAS CORPORATIO07/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offELICC AMERICAS CORPORATIO07/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offHIGHRISE SAFETY SYSTEMS I07/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offHIGHRISE SAFETY SYSTEMS I07/05/2023
DOB NOWStructuralSigned-offSUFFOLK CONSTRUCTION COMP06/17/2023
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC05/16/2023
DOB NOWStandpipeSigned-offPEAK FIRE PROTECTION LLC05/16/2023
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC05/16/2023
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC05/12/2023
DOB NOWStructuralSigned-offSUFFOLK CONSTRUCTION COMP05/09/2023
DOB NOWMechanical SystemsSigned-offDEMAR PLUMBING CORP05/04/2023
DOB NOWPlumbingSigned-offALMAR PLUMBING & HTG CORP04/29/2023
+ 12 more permits on file
1 project · most recent 10/21/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/21/2025Permit IssuedSUFFOLK CONSTRUCTION COMPAir Conditioning Systems, Ventilation Systems
Cooling
Daikin REYQ168XAYDA 9,480 CFM · Vrf Outdoor ×62
REYQ144XAYDA 9,480 CFM · Vrf Outdoor ×36
REYQ096XAYDA 7,989 CFM · Vrf Outdoor ×20
RXYQ120XAYDA 6,286 CFM · Vrf Outdoor ×16
1*REYQ120XA / 1*REYQ96XA 7,989 CFM · Vrf Outdoor ×8
REYQ120XA / REYQ144XA 17,469 CFM · Vrf Outdoor ×8
REYQ168XA 9,480 CFM · Vrf Outdoor ×8
CAH010GVGM 2,500 CFM · Split System ×4
CAH012GVGC 6,500 CFM · Split System ×4
CAH013GVGM 2,700 CFM · Split System ×4
DPS007A 99,000 BTU · Heat Pump Outdoor ×4
FXTQ09TAVJUD 300 CFM · Vrf Indoor ×4
REYQ168XBYDA 9,480 CFM · Vrf Outdoor ×15
REYQ144XAYDB 9,480 CFM · Vrf Outdoor ×4
REYQ144XBYDA 9,489 CFM · Vrf Outdoor ×4
RXYQ120XATJA 6,286 CFM · Vrf Outdoor ×4
REYQ096XAYDB 7,989 CFM · Vrf Outdoor ×3
REYQ096XBYDA 7,989 CFM · Vrf Outdoor ×2
REYQ120XAYDB 7,989 CFM · Vrf Outdoor ×2
REYQ120XAYDB REYQ144XBYDA 17,469 CFM · Vrf Outdoor ×2
REYQ120XAYDB REYQ96XBYDA 7,989 CFM · Vrf Outdoor ×2
RZQ48TBVJUA 48,000 CFM · Vrf Outdoor ×2
DPS007AHHEDW 99,000 BTU · Heat Pump Outdoor ×1
Greenheck Minivent-450-VG 250 CFM · Erv ×12
Carnes WEHEC0318J3K3C8ECW 2,600 CFM ×8
Ventilation
Daikin N/A 2,000 CFM · Erv ×28
Greenheck AX-113-533-0814 26,000 CFM · Exhaust Fan ×8
GB-140 1,655 CFM · Exhaust Fan ×4
SQ-130-VG 1,650 CFM · Exhaust Fan ×4
USF-12 900 CFM · Exhaust Fan ×4
Minivent-450-VG 250 CFM · Erv ×2
Miniv-450 250 CFM · Erv ×1
Lfs System DEF-025 1,500 CFM ×4
ISAF-020 1,500 CFM ×4
Carnes ERV-45-15L 2,250 CFM · Erv ×1
1 project · most recent 10/21/2025
Sprinkler System
FiledStatusContractorScope
10/21/2025Signed-offRAEL AUTOMATIC SPR.CO INCSprinkler System
1 project · most recent 10/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/21/2025Signed-offALMAR PLUMBING & HTG CORPGas, Storm, Water/Sanitary
6 projects · most recent 06/02/2025
General Wiring
FiledStatusContractorScope
06/02/2025CompleteSKF ELECTRICAL CORPGeneral Wiring
04/23/2025CompleteBOROWIDE ELECT'L CONTR'S—
06/30/2023CompleteSTAR ELEC'L CONTRACTORS C—
06/27/2023CompleteSKF ELECTRICAL CORP—
05/25/2023CompleteSKF ELECTRICAL CORP—
03/15/2023CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 10/21/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/21/2025Signed-offALMAR PLUMBING & HTG CORPSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
10/29/2025Pass-Final SD - Fire PumpPassView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/12/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/05/2024Pass-Final SD - Fire PumpPassView ↗
07/31/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/06/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/06/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/18/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/18/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
10/25/2022Pass-Final House ConnectionPassView ↗
09/23/2022Pass-Final PL - UndergroundPassView ↗
07/28/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
11/06/2025Sprinkler SystemsJOHN MCMONAGLEspecial
11/06/2025Standpipe SystemsJOHN MCMONAGLEspecial
09/05/2025Emergency and Standby Power Systems (Generator)JOHN MCMONAGLEspecial
09/05/2025FinalJOHN MCMONAGLEprogress
09/05/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
09/05/2025Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
09/05/2025Interior lighting powerJOHN MCMONAGLEenergy_progress
09/05/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
09/05/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
09/05/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
09/05/2025Exterior lighting powerJOHN MCMONAGLEenergy_progress
09/05/2025Ventilation and air distribution systemJOHN MCMONAGLEenergy_progress
09/05/2025MeteringJOHN MCMONAGLEenergy_progress
09/05/2025Shutoff dampersJOHN MCMONAGLEenergy_progress
09/05/2025Lighting controlsJOHN MCMONAGLEenergy_progress
09/05/2025Maintenance informationJOHN MCMONAGLEenergy_progress
09/05/2025FireplacesJOHN MCMONAGLEenergy_progress
09/05/2025Mechanical SystemsJOHN MCMONAGLEspecial
08/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
04/29/2025Post-installed AnchorsZELJKO STEVANOVICspecial
04/29/2025Post-installed AnchorsZELJKO STEVANOVICspecial
04/02/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/02/2025Air barrier continuity plan testingJennifer Szeenergy_progress
04/02/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/02/2025Energy Code Compliance InspectionsJennifer Szeprogress
Latest 25 of 110.
▾Documents — 278 on file (BIS + DOB NOW)
▸Plans & Drawings56
▸DOB NOWPlans/Sketch56
08/26/2026Q00670719-I1Request digital key ↗
08/25/2026Q00842093-I1Request digital key ↗
08/25/2026Q00842089-I1Request digital key ↗
Showing 3 of 56 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
01/26/2024440805915Open ↗
01/24/2024440805915Open ↗
09/26/2023440805915Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/24/2025440688258Open ↗
05/12/2022440688258Open ↗
04/28/2022440688258Open ↗
▸BISWORK PERMIT APPLICATION2
02/12/2025440821265Open ↗
09/29/2023440805915Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026Q00548195-P5Open ↗
08/13/2026Q00548195-A1Open ↗
08/13/2026Q00548195-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026Q00548195-A4Open ↗
08/13/2026Q00548195-P5Open ↗
08/13/2026Q00548195-P9Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
05/12/2022440688258Open ↗
04/28/2022440688258Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/14/2022440688258Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00548195-I1Open ↗
▸Seals & Professional Certifications107
▸DOB NOWDPL-1: Design Professional Seal & Signature54
08/26/2026Q00670719-I1Open ↗
08/25/2026Q00842093-I1Open ↗
08/25/2026Q00842089-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/29/2026Q01130447-I1Open ↗
09/23/2026Q00548195-S8Open ↗
09/20/2026Q00548195-A3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/20/2026Q00548195-A3Open ↗
09/20/2026Q00548195-A3Open ↗
09/20/2026Q00548195-A3Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/26/2023440805915Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/14/2021440688258Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/26/2023440805915Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/26/2023440805915Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00548195-I1—
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist6
08/13/2026Q00548195-A2Open ↗
08/13/2026Q00548195-P9Open ↗
08/13/2026Q00548195-A1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/15/2026Q00548195-I1Open ↗
08/13/2026Q00548195-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/23/2024440688258Open ↗
▸BISSTREET TREE CHECKLIST1
10/23/2024440688258Open ↗
▸BISSTREET TREE SIGNOFF1
02/27/2026440688258Open ↗
▸BISSTREET TREES SITE PLAN1
10/17/2024440688258Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00548195-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/26/2023440805915Open ↗
09/14/2021440688258Open ↗
▸BISPOST-INSTALLED ANCHORS1
06/25/2025440805915Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00548195-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00548195-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00548195-S1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00548195-S3Open ↗
▸Approvals, Objections & Sign-offs8
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
02/27/2026440688258Open ↗
10/23/2024440688258Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/12/2022440688258Open ↗
04/28/2022440688258Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/21/2025440805915Open ↗
07/02/2025440821265Open ↗
▸BISFINAL1
06/23/2025440805915Open ↗
▸BISDOT COMPLIANCES FOR PED-RAMP IMPROVEMENTAT CORNER/ APEX CORNER PEDRAMP APPROVALFROM DOT1
11/12/2024440688258Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT1
09/26/2023440805915Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/18/2025440805915Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00548195-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00548195-I1Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
11/12/2024440688258Open ↗
01/26/2024440805915Open ↗
12/16/2022440688258Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/26/2023440805915Open ↗
09/14/2021440688258Open ↗
▸BISBOROUGH INTAKE FORM1
04/28/2022440688258Open ↗
▸Other Documents39
▸DOB NOWManufacturer's Specifications8
08/13/2026Q01148836-P1Open ↗
08/13/2026Q01148836-I1Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWCalculations8
08/13/2026Q01130447-P4Open ↗
08/13/2026Q01130447-P2Open ↗
08/13/2026Q01130447-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026Q00548195-P5Open ↗
08/13/2026Q00548195-A1Open ↗
08/13/2026Q00548195-P9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/13/2026Q00548195-S3Open ↗
08/13/2026Q00548195-Z1Open ↗
08/13/2026Q00548195-S1Open ↗
▸BISPLOT DIAGRAM2
05/12/2022440688258Open ↗
04/28/2022440688258Open ↗
▸DOB NOWFinal Survey2
08/15/2026Q00548195-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
10/23/2024440688258Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/02/2025440821265Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/23/2024440688258Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00548195-I1Open ↗