← Back
Two family frame
23-24 100 STREET
QUEENS · BIN 4023914
💬 Discuss this project
1955Year Built
2Stories
B2Building Class
R3-1Zoning
2,760 sfGross Floor Area
2Units
5 Open Violations 3 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family frame · 3,300 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL EMPIRE BUILDING CONTRACTORS209/01/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/04/2016$875K—— → —$317/sf building
05/27/2016$725K—— → —$263/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MUMTAZ ENTERPRISES207/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUMTAZ ENTERPRISES9459207/17/2026
Building Lifecycle
All (9)Filed (2)Violation (5)Special Inspection (2)
07/17/2026
Filed — Alteration
APPLICATION FILE TO REMOVE & REPLACE EXISTING PLUMBING FIXTURES (W/C & LAV) AT CELLAR FLOOR. REMOVE SHOWER AT CELLAR FLOOR AS PER PLAN. REMOVE VIOLATION#35727632N NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01410400-S1
07/10/2026
Filed — Alteration
APPLICATION FILE TO REMOVE & REPLACE EXISTING PLUMBING FIXTURES (W/C & LAV) AT CELLAR FLOOR. REMOVE SHOWER AT CELLAR FLOOR AS PER PLAN. REMOVE VIOLATION#35727632N NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01410400-I1
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Unknown
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/01/2026Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
06/01/2026Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01410400-S1Request digital key ↗
08/16/2026Q01410400-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01410400-S1Open ↗
08/16/2026Q01410400-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01410400-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01410400-S1Open ↗
08/16/2026Q01410400-I1Open ↗