← Back
Office with commercial, 7-19 stories
23-25 31 STREET
QUEENS · BIN 4017180
💬 Discuss this project
2012Year Built
8Stories
O6Building Class
C4-3Zoning
75,191 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Office with commercial, 7-19 stories · Owner of record: PALI REALTY, LLC · 9,002 sf lot · 8.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 72p · 1 filing · 4 docs
Floor 6
Floor 5
Floor 4
Floor 33p · 2 filings · 14 docs
Floor 2
Floor 11p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMPORIOS2307/08/2026
PALI REALTY13203/22/2026
CRANES EXPRESS INC103/22/2026
E & C RESTORATION INC103/22/2026
BL PAIN MANAGEMENT503/21/2026
UNIVERSITY ORTHOPEDICS OF NY LLC503/21/2026
ROWAY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
J A EXPEDITING403/21/2026
GERALD J. CALIENDO R.A., P.C.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAN GOGH PAINTERS LLCGeneral Contractor407/08/2026
ADI CONTRACTING LLCGeneral Contractor207/08/2026
VILLAGE P & H NY INCPlumbing207/08/2026
UNITECH DESIGNScaffold207/08/2026
BYPASS MECHANICALGeneral Contractor103/21/2026
BELIC ZDENKOGeneral Contractor103/21/2026
KET ELECTRIC LLCElectrical103/22/2026
PLUMBING WORKS CORPFire Protection107/08/2026
ATMOS ELECTRIC SVCE CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DIVERSIFIED DESIGN ASSOCI3403206/14/2023
HRF SERVICES CORP5616303/02/2023
Building Lifecycle
All (88)Filed (10)Permit Issued (9)Signed Off (9)Violation (42)Inspection (8)Special Inspection (10)
12/16/2025
Signed off — Alteration
MINOR INTERIOR ALTERATIONS TO AN EXISTING MEDICAL OFFICE
Q01262858-S1
12/16/2025
Filed — Alteration
MINOR INTERIOR ALTERATIONS TO AN EXISTING MEDICAL OFFICE
Q01262858-S2
12/16/2025
Signed off — Alteration
MINOR INTERIOR ALTERATIONS TO AN EXISTING MEDICAL OFFICE
Q01262858-I1
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/08/2025
Permit issued — Plumbing
Q01262858-S1-PL
10/07/2025
Filed — Alteration
MINOR INTERIOR ALTERATIONS TO AN EXISTING MEDICAL OFFICE
Q01262858-S1
10/03/2025
Special inspection requirement — Lighting controls
John McGuire
10/03/2025
Special inspection requirement — Mechanical Systems
10/03/2025
Special inspection requirement — Final
John McGuire
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
John McGuire
10/03/2025
Special inspection requirement — Interior lighting power
John McGuire
09/19/2025
Permit issued — General Construction
Q01262858-I1-GC
08/19/2025
Filed — Alteration
MINOR INTERIOR ALTERATIONS TO AN EXISTING MEDICAL OFFICE
Q01262858-I1
08/04/2025
Signed off — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED, NON FLASHING ACCESSORY BUSINESS SIGN. WORDING "LOGO" "ALMA BANK"
Q01232475-I1
07/30/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
07/29/2025
Special inspection requirement — Final
John McGuire
06/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED, NON FLASHING ACCESSORY BUSINESS SIGN. WORDING "LOGO" "ALMA BANK"
Q01232475-I1
06/05/2025
Permit issued — Sign
Q01232475-I1-SG
05/16/2025
Signed off — Alteration
Q00884857-I1
05/16/2025
Signed off — Alteration
Q00884858-I1
01/08/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2024
Violation issued (ECB, closed)
Construction
10/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/27/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/19/2024
Permit issued — Plumbing
Q00884858-I1-PL
05/09/2024
Signed off — Alteration
Minor relocation of Sprinkler Heads to accommodate new ceiling arrangement. No change to use, occupancy, or egress associated with this application.
Q00836897-I1
08/11/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/13/2023
Signed off — Alteration
Q00836118-I1
06/29/2023
Signed off — Alteration
Q00824932-I1
06/29/2023
Permit issued — General Construction
Q00884857-I1-GC
06/28/2023
Permit issued — Mechanical Systems
Q00836118-I1-MS
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2023
Filed — Alteration
Q00884857-I1
06/14/2023
Filed — Alteration
Q00884858-I1
06/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI COELLO
06/04/2023
Special inspection requirement — Final
GIOVANNI COELLO
03/17/2023
Permit issued — Sprinklers
Q00836897-I1-EW-SP
03/07/2023
Permit issued — General Construction
Q00824932-I1-GC
03/02/2023
Filed — Alteration
Minor relocation of Sprinkler Heads to accommodate new ceiling arrangement. No change to use, occupancy, or egress associated with this application.
Q00836897-I1
03/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/01/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
02/28/2023
Filed — Alteration
Q00836118-I1
02/07/2023
Filed — Alteration
Q00824932-I1
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/08/2018
Signed off — Alteration
INSTALL ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN. WORDING: HARPELL'S DITMARS (LOGO IN THE MIDDLE) PHARMACY & Natural Market dept within
Q00014395-I1
02/08/2018
Filed — Alteration
INSTALL ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN. WORDING: HARPELL'S DITMARS (LOGO IN THE MIDDLE) PHARMACY & Natural Market dept within
Q00014395-I1
02/08/2018
Permit issued — Sign
Q00014395-I1-SG
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2017
Violation issued (ECB, closed)
Unknown
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC10/08/2025
DOB NOWGeneral ConstructionSigned-offADI CONTRACTING LLC09/19/2025
DOB NOWSignSigned-offUNITECH DESIGN INC06/05/2025
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC09/19/2024
DOB NOWGeneral ConstructionSigned-offADI CONTRACTING LLC06/29/2023
DOB NOWMechanical SystemsSigned-offVAN GOGH PAINTERS LLC06/28/2023
DOB NOWSprinklersSigned-offBLUEWATER P&H, INC03/17/2023
DOB NOWGeneral ConstructionSigned-offVAN GOGH PAINTERS LLC03/07/2023
DOB NOWSignSigned-offUNITECH DESIGN INC02/08/2018
BISMHISSUEDOMNI BUILD INC10/21/2021
BISOTISSUEDOMNI BUILD INC10/01/2019
BISSPISSUEDROM PIPING & HEATING INC06/11/2019
BISOTISSUEDOMNI BUILD INC04/12/2019
BISPLISSUEDFLINT MECHANICAL CORP12/27/2018
BISPLISSUEDFLINT MECHANICAL CORP10/30/2018
BISOTISSUEDLOCATI DELEVLOPMENT INC10/15/2018
BISOTISSUEDLOCATI DELEVLOPMENT INC09/27/2018
BISOTISSUEDALIGN INTERIORS CORP07/02/2018
BISOTISSUEDTALISEN CONSTRUCTION CORP05/14/2018
BISMHISSUEDTALISEN CONSTRUCTION CORP05/14/2018
BISPLISSUEDFLINT MECHANICAL CORP04/16/2018
BISSPISSUEDFLINT MECHANICAL CORP04/16/2018
BISMHISSUEDLOCATI DELEVLOPMENT INC04/12/2018
BISOTISSUEDLOCATI DELEVLOPMENT INC04/02/2018
BISSPISSUEDNYCO PLBG & HTG CORP03/09/2018
BISPLISSUEDWILLIAM C. GERAKARIS P&H02/23/2018
BISOTISSUEDTALISEN CONSTRUCTION CORP02/22/2018
BISMHISSUEDTALISEN CONSTRUCTION CORP02/22/2018
BISOTISSUEDLOCATI DELEVLOPMENT INC01/30/2018
BISOTISSUEDLOCATI DELEVLOPMENT INC01/26/2018
BISMHISSUEDLOCATI DELEVLOPMENT INC01/24/2018
BISSPISSUEDSIRINA FIRE PROT CORP12/13/2017
BISPLISSUEDGARMAD PLBG & HTG INC11/08/2017
BISOTISSUEDALIGN INTERIORS CORP10/31/2017
BIS—ISSUEDGOING SIGN & SVCNG CO,INC10/10/2017
BISOTISSUEDTNT INDUSTRIES INC09/08/2017
BISMHISSUEDTNT INDUSTRIES INC09/08/2017
BISSPISSUEDGO PRO FIRE PROTECTION C04/13/2017
BISPLISSUEDCENTRIFUGAL MECHANICAL CO04/13/2017
BISMHISSUEDLOCATI DELEVLOPMENT INC04/07/2017
+ 19 more permits on file
1 project · most recent 12/16/2025
Water/Sanitary
FiledStatusContractorScope
12/16/2025Signed-offVILLAGE P & H NY INCWater/Sanitary
16 projects · most recent 10/02/2025
General Wiring
FiledStatusContractorScope
10/02/2025CompleteDOUBLE "R" ELEC'L CONTR'GGeneral Wiring
06/05/2025CompleteATMOS ELECTRIC SVCE CORP—
03/13/2023CompleteKET ELECTRIC LLCGeneral Wiring
09/10/2019CompleteLAZER ELECTRICAL CORP.General Wiring
06/11/2019CompleteLAZER ELECTRICAL CORP.General Wiring
04/28/2019CompleteI.D.K. ELECTRIC CO., INC.General Wiring
01/11/2019CompleteCSI ELEC'L & MECHANICAL IGeneral Wiring
10/08/2018CompleteLAZER ELECTRICAL CORP.General Wiring
10/03/2018CompleteLAZER ELECTRICAL CORP.General Wiring
10/03/2018CompleteLAZER ELECTRICAL CORP.General Wiring
08/20/2018CompleteLAZER ELECTRICAL CORP.General Wiring
08/12/2018CompleteLAZER ELECTRICAL CORP.General Wiring
08/12/2018CompleteLAZER ELECTRICAL CORP.General Wiring
02/09/2018CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
02/07/2018CompleteLAZER ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Pass-Final Sign Permit InspectionPassView ↗
10/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/03/2025Lighting controlsJohn McGuireenergy_progress
10/03/2025Mechanical Systems—special
10/03/2025FinalJohn McGuireprogress
10/03/2025Energy Code Compliance InspectionsJohn McGuireprogress
10/03/2025Interior lighting powerJohn McGuireenergy_progress
07/29/2025FinalJohn McGuireprogress
06/04/2023Fire-Resistant Penetrations and JointsGIOVANNI COELLOspecial
06/04/2023FinalGIOVANNI COELLOprogress
03/02/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/01/2023Sprinkler SystemsFAHAD FATEHspecial
▾Documents — 1,021 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026Q00014395-I1Request digital key ↗
08/25/2026Q00824932-I1Request digital key ↗
08/25/2026Q00836118-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits190
▸BISPLAN / WORK APPROVAL APPLICATION107
06/09/2025440365089Open ↗
05/17/2024421247662Open ↗
10/12/2022421664318Open ↗
Showing 3 of 107 on file for this type
▸BISWORK PERMIT APPLICATION78
10/21/2021440541745Open ↗
06/13/2019421952239Open ↗
06/11/2019440541745Open ↗
Showing 3 of 78 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
04/08/2019440387699Open ↗
Showing 1 of 3 on file for this type
▸BISIntent to Revoke Approval/Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZoning Diagram (ZD1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISVERIFY TAX LOT1
11/19/2021420229194Open ↗
▸Seals & Professional Certifications165
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
08/10/2019421615675Open ↗
07/29/2019421615675Open ↗
05/06/2019421586457Open ↗
Showing 3 of 91 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
05/31/2019440541745Open ↗
Showing 1 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/29/2026Q00014395-I1Open ↗
08/25/2026Q00824932-I1Open ↗
08/25/2026Q00836118-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
05/31/2019440541745Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
05/31/2019440541745Open ↗
Showing 1 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00884857-I1Open ↗
08/23/2026Q00836897-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026Q00884857-I1Open ↗
08/30/2026Q01262858-I1Open ↗
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
04/05/2019421952239Open ↗
03/26/2019421952239Open ↗
Showing 2 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING7
05/31/2019440541745Open ↗
Showing 1 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
12/05/2019421404938Open ↗
05/22/2019421546802Open ↗
Showing 2 of 5 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
12/17/2018421531765Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISWATER METER PERMIT : DEP-METER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/17/2018421531765Open ↗
Showing 1 of 2 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection12
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos39
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED8
05/31/2019440541745Open ↗
Showing 1 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION6
11/11/2021421952239Open ↗
11/08/2021440541745Open ↗
10/21/2020440224268Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00884858-I1Open ↗
08/24/2026Q00884857-I1Open ↗
08/18/2026Q01262858-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/29/2026Q00014395-I1Open ↗
08/13/2026Q00884858-I1Open ↗
08/13/2026Q00836118-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/29/2026Q00014395-I1Open ↗
08/13/2026Q00824932-I1Open ↗
08/13/2026Q00836118-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance103
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS43
08/10/2019421615675Open ↗
04/18/2019421952239Open ↗
04/08/2019440387699Open ↗
Showing 3 of 43 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY23
08/05/2022421664318Open ↗
07/25/2022421664318Open ↗
07/25/2022421683805Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
11/11/2021421952239Open ↗
08/10/2019421615675Open ↗
04/10/2019421606140Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)11
10/05/2023440224268Open ↗
10/05/2023440365089Open ↗
10/05/2023421583815Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
05/31/2019440541745Open ↗
Showing 1 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
10/05/2023440224268Open ↗
10/05/2023440365089Open ↗
10/05/2023421583815Open ↗
▸BISLIGHTING CONTROLS2
10/05/2023440224268Open ↗
10/05/2023440365089Open ↗
▸BISINTERIOR LIGHTING POWER2
10/05/2023440224268Open ↗
10/05/2023440365089Open ↗
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY24
08/05/2022421664318Open ↗
07/25/2022421664318Open ↗
07/25/2022421683805Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
10/05/2023440224268Open ↗
10/05/2023440365089Open ↗
10/05/2023421583815Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs174
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST71
10/16/2024421664318Open ↗
08/01/2022421683805Open ↗
02/18/2022420229194Open ↗
Showing 3 of 71 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION71
10/14/2020420229194Open ↗
07/21/2020420229194Open ↗
07/20/2020420229194Open ↗
Showing 3 of 71 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
03/24/2022420229194Open ↗
11/16/2021420229194Open ↗
10/21/2021420229194Open ↗
Showing 3 of 11 on file for this type
▸Cost, Insurance & Ownership78
▸BISCOST AFFIDAVIT59
09/17/2024440365089Open ↗
02/10/2020421404938Open ↗
08/10/2019421615675Open ↗
Showing 3 of 59 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW311
10/05/2023440224268Open ↗
10/05/2023440365089Open ↗
10/05/2023421583815Open ↗
Showing 3 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms110
▸BISADDITIONAL INFORMATION48
10/12/2022421664318Open ↗
08/04/2022421664318Open ↗
02/22/2022420229194Open ↗
Showing 3 of 48 on file for this type
▸BISEFILING COVER SHEET42
04/05/2019421952239Open ↗
Showing 1 of 42 on file for this type
▸BISBOROUGH INTAKE FORM11
03/24/2022420229194Open ↗
04/08/2019421586457Open ↗
Showing 2 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
05/31/2019440541745Open ↗
Showing 1 of 9 on file for this type
▸Other Documents5
▸BISPLOT DIAGRAM2
10/14/2020420229194Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
10/16/2024421664318Open ↗
08/04/2022421664318Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01259007-I1Open ↗