Elevator apt, fireproof with stores
23-33 ASTORIA BOULEVARD
QUEENS · BIN 4019064
💬 Discuss this project
2022Year Built
7Stories
D6Building Class
R6AZoning
21,946 sfGross Floor Area
30Units
18 Open Violations ▸
Elevator apt, fireproof with stores · Owner of record: ASTO CREST HOLDING LLC · 7,890 sf lot · 2.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof3p · 5 filings · 20 docs
Bulkhead4p · 3 filings · 20 docs
Floor 72p · 4 filings · 20 docs
Floor 63p · 3 filings · 20 docs
Floor 51p · 2 filings · 20 docs
Floor 43p · 4 filings · 20 docs
Floor 31p · 2 filings · 20 docs
Floor 24p · 5 filings · 20 docs
Floor 11p · 2 filings · 20 docs
Cellar5p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILSON GARDENS407/08/2026
ASTOCREST HOLDING803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2019$2.4M—Private party → ASTO CREST HOLDING LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSELOW & ASSOCIATES, LLC101/11/2024
JOSELOW AND ASSOCIATES711/28/2023
HCN DESIGN308/10/2023
PAUL PERDEK, PROF. ENG. PLLC605/24/2023
WEXLER ASSOCIATES506/21/2022
SOUTH BAY ENGINEERING PLLC103/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES1203/21/2026
HCN DESIGN1303/21/2026
EXPEDITE DEM203/21/2026
HTX BUILDING CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HP BUILDING MANAGEMENT INGeneral Contractor607/08/2026
HYPER STRUCTURE CORPGeneral Contractor507/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor207/08/2026
WATER DYNAMIC P & H CORPPlumbing207/08/2026
ANESIS SERVICES CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811301/11/2024
Building Lifecycle
All (155)Filed (23)Permit Issued (12)Signed Off (10)Violation (44)Inspection (10)Objection (26)Special Inspection (30)
04/18/2024
Signed off — Alteration
(1) 12' curb cut with splays to access parking at rear yard.
Q00916895-I1
03/26/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/12/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/29/2024
Permit issued — Curb Cut
Q00916895-I1-CC
01/26/2024
Signed off — Alteration
respectfully admistrative transfer all the SP filed under job # Q00560723 to this job , SD work type was filed mistakely under job #Q00560723, and system will not allow to WD the SD work type , we need to refile the SP in oder to WD job Q00560723
Q00987817-I1
01/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/19/2024
Signed off — Alteration
NEW BUILDING MECHANICAL SYSYTEM AT CELLAR, 001 TO 007 IN CONJUNCTION WITH NB 440660633
Q00560702-I1
01/19/2024
Signed off — Alteration
NEW BUILDING PLUMBING AT CELLAR, FLOORS 001 TO 007, ROOF IN CONJUNCTION WITH NB 440660633
Q00560718-I1
01/18/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/12/2024
Permit issued — Sprinklers
Q00987817-I1-EW-SP
01/11/2024
Filed — Alteration
respectfully admistrative transfer all the SP filed under job # Q00560723 to this job , SD work type was filed mistakely under job #Q00560723, and system will not allow to WD the SD work type , we need to refile the SP in oder to WD job Q00560723
Q00987817-I1
01/09/2024
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
12/15/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
12/15/2023
Special inspection requirement — Permanent certificate
ALDO BRAVO
12/15/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
12/11/2023
Signed off — Alteration
Q00334643-I1
11/28/2023
Filed — Alteration
NEW BUILDING PLUMBING AT CELLAR, FLOORS 001 TO 007, ROOF IN CONJUNCTION WITH NB 440660633
Q00560718-P3
11/28/2023
Signed off — Alteration
TO ERECT TEMPORARY CONSTRUCTION FENCE ALONG PROPERTY LINE AS PER PLANS & NYC 2014 CHAPTHER 33
Q00506202-I1
11/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
11/20/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
11/20/2023
Special inspection requirement — Permanent certificate
ALDO BRAVO
11/14/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
11/14/2023
Special inspection requirement — Standpipe Systems
ALDO BRAVO
11/14/2023
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
10/30/2023
Filed — Alteration
NEW BUILDING PLUMBING AT CELLAR, FLOORS 001 TO 007, ROOF IN CONJUNCTION WITH NB 440660633
Q00560718-P2
10/30/2023
Filed — Alteration
NEW BUILDING SPRINKLERS/STANDPIPE FILED IN CONJUNCTION WITH NB 440660633 MIXED USED BUILDING 7 STORIES +CELLAR
Q00560723-P1
10/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
10/27/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
10/27/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
10/27/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
10/27/2023
Special inspection requirement — Permanent certificate
ALDO BRAVO
10/26/2023
Signed off — Alteration
Q00560677-I1
10/12/2023
Signed off — Alteration
EARTHWORK/SOE AND FOUNDATION FILED IN CONJUNCTION WITH NB 440660633
Q00560606-I1
10/06/2023
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
10/06/2023
Special inspection requirement — Exterior lighting power
ALDO BRAVO
10/06/2023
Special inspection requirement — Interior lighting power
ALDO BRAVO
10/06/2023
Special inspection requirement — Shutoff dampers
ALDO BRAVO
10/06/2023
Special inspection requirement — Mechanical Systems
ALDO BRAVO
10/06/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
10/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
ALDO BRAVO
10/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
ALDO BRAVO
10/06/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
10/06/2023
Special inspection requirement — Ventilation and air distribution system
ALDO BRAVO
10/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
09/29/2023
Permit issued — Mechanical Systems
Q00560702-I1-MS
09/22/2023
Signed off — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00874397-I1
09/22/2023
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q08035641-I1
09/11/2023
Violation issued (ECB, closed)
Construction
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection resolved — Addressed
08/17/2023
Objection raised — Inspections
08/17/2023
Objection raised — Structural
08/14/2023
Permit issued — Structural
Q00560677-I1-ST
08/10/2023
Filed — Alteration
(1) 12' curb cut with splays to access parking at rear yard.
Q00916895-I1
05/24/2023
Filed — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00874397-P1
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offANGELINE PENA-LEVI01/29/2024
DOB NOWSprinklersSigned-offTHOMAS FAY01/12/2024
DOB NOWMechanical SystemsSigned-offANGELINE PENA-LEVI09/29/2023
DOB NOWStructuralSigned-offANGELINE PENA-LEVI08/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offLAKHI GENERAL CONTRACTOR05/16/2023
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP03/20/2023
DOB NOWConstruction FenceSigned-offANGELINE PENA-LEVI11/15/2022
DOB NOWSupported ScaffoldSigned-offLAKHI GENERAL CONTRACTOR11/09/2022
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP02/15/2022
DOB NOWFoundationSigned-offHYPER STRUCTURE CORP12/03/2021
DOB NOWConstruction FenceSigned-offHYPER STRUCTURE CORP11/24/2021
DOB NOWConstruction FenceSigned-offHYPER STRUCTURE CORP05/20/2020
BIS—ISSUEDHP BUILDING MANAGEMENT IN01/20/2023
BIS—ISSUEDHP BUILDING MANAGEMENT IN11/10/2022
BIS—ISSUEDHYPER STRUCTURE CORP05/13/2022
BIS—ISSUEDHYPER STRUCTURE CORP12/17/2021
BIS—ISSUEDHYPER STRUCTURE CORP06/10/2020
BISEQISSUEDHYPER STRUCTURE CORP06/10/2020
BISPLISSUEDTHE PLUMBING COMPANY INC10/20/2011
BIS—ISSUEDJAFF REVELATION INC05/28/2009
BISOTISSUEDJAFF REVELATION INC05/15/2009
BISOTISSUEDARAMCO CONSTRUCTION INC04/22/2005
1 project · most recent 10/30/2023
FiledStatusContractorScope
10/30/2023——1 heads, 1 outlets
5 projects · most recent 12/18/2023
General Wiring
FiledStatusContractorScope
12/18/2023CompleteKENNETH FISK ELECTRIC CORGeneral Wiring
10/29/2023CompleteRONART ELECTRIC COGeneral Wiring
03/15/2023CompleteRONART ELECTRIC COGeneral Wiring
10/03/2022CompleteKWONG MING ELECTRIC INC—
01/24/2022CompleteRONART ELECTRIC COGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
02/12/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
01/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/20/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/06/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
01/09/2024Sprinkler SystemsALDO BRAVOspecial
12/15/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
12/15/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
12/15/2023Energy Code Compliance InspectionsALDO BRAVOprogress
12/15/2023Maintenance informationALDO BRAVOenergy_progress
12/15/2023Permanent certificateALDO BRAVOenergy_progress
11/20/2023Maintenance informationALDO BRAVOenergy_progress
11/20/2023Permanent certificateALDO BRAVOenergy_progress
11/20/2023Energy Code Compliance InspectionsALDO BRAVOprogress
11/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
11/20/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
11/14/2023Standpipe SystemsALDO BRAVOspecial
11/14/2023Energy Code Compliance InspectionsALDO BRAVOprogress
11/14/2023Sprinkler SystemsALDO BRAVOspecial
10/27/2023Energy Code Compliance InspectionsALDO BRAVOprogress
10/27/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
10/27/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
10/27/2023Maintenance informationALDO BRAVOenergy_progress
10/27/2023Permanent certificateALDO BRAVOenergy_progress
10/06/2023Mechanical SystemsALDO BRAVOspecial
10/06/2023HVAC-R and service water heating system controlsALDO BRAVOenergy_progress
10/06/2023HVAC-R and service water heating equipmentALDO BRAVOenergy_progress
10/06/2023Ventilation and air distribution systemALDO BRAVOenergy_progress
10/06/2023Energy Code Compliance InspectionsALDO BRAVOprogress
10/06/2023FinalALDO BRAVOprogress
Latest 25 of 87.
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch22
08/27/2026Q00506202-I1Request digital key ↗
08/27/2026Q00560723-P1Request digital key ↗
08/27/2026Q00560702-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00334643-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
12/06/2024440660633Open ↗
01/17/2024440660633Open ↗
09/22/2023440660633Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION6
12/15/2022440660633Open ↗
04/04/2022440660633Open ↗
06/18/2020421793321Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/10/2023440660633Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/26/2024440686330Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/01/2021440660633Open ↗
▸Seals & Professional Certifications90
▸DOB NOWProgress Inspector Seal & Signature35
09/25/2026Q00560606-I1Open ↗
09/25/2026Q00560606-I1Open ↗
09/25/2026Q00560606-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/25/2026Q00560606-I1Open ↗
09/25/2026Q00560606-I1Open ↗
09/25/2026Q00560606-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/28/2026Q00334643-I1Open ↗
08/27/2026Q00560723-I1Open ↗
08/27/2026Q00560723-P1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/17/2020421793321Open ↗
06/18/2020421793321Open ↗
11/28/2008410197683Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/07/2021440686330Open ↗
03/01/2021440660633Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
10/07/2021440686330Open ↗
03/01/2021440660633Open ↗
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/29/2024440660633Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/1
01/30/2024440660633Open ↗
▸BISELECTRIC CUT-OFF1
06/18/2020421793321Open ↗
▸BISSEWER CUT-OFF1
06/18/2020421793321Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/29/2024440660633Open ↗
▸BISSPRINKLER SYSTEMS1
01/29/2024440660633Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE SIGNOFF2
12/04/2024440660633Open ↗
04/26/2024440686330Open ↗
▸BISSTREET TREES SITE PLAN2
04/26/2024440686330Open ↗
10/06/2021440660633Open ↗
▸BISSTREET TREE CHECKLIST2
09/14/2023440686330Open ↗
10/06/2021440660633Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/29/2024440660633Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/18/2020421793321Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/18/2020421793321Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/05/2009410197683Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
12/02/2021440660633Open ↗
12/02/2021440660633Open ↗
11/24/2021440660633Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00560718-I1Open ↗
08/13/2026Q00560702-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/29/2024440660633Open ↗
▸BISINTERIOR LIGHTING POWER1
01/29/2024440660633Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/29/2024440660633Open ↗
▸BISFENESTRATION AREAS1
01/29/2024440660633Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/18/2022440660633Open ↗
03/18/2022440660633Open ↗
11/24/2021440660633Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/13/2024440660633Open ↗
11/24/2021440660633Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
12/04/2024440660633Open ↗
12/02/2021440660633Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
12/07/2021440660633Open ↗
12/02/2021440660633Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/29/2024440660633Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/31/2024440660633Open ↗
▸BISBPP: FIELD INSPECTION1
04/26/2024440686330Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/29/2024440660633Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/29/2024440660633Open ↗
▸BISMASONRY1
01/29/2024440660633Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/29/2024440660633Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE6
01/17/2024440660633Open ↗
09/22/2023440660633Open ↗
11/12/2021440660633Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER1
12/15/2022440660633Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/18/2020421793321Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
12/15/2022440660633Open ↗
11/24/2021440660633Open ↗
06/18/2020421793321Open ↗
▸BISCOST AFFIDAVIT1
11/28/2008410197683Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION11
01/30/2024440660633Open ↗
10/03/2023440660633Open ↗
09/14/2023440686330Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET2
02/20/2020421793321Open ↗
11/28/2008410197683Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/07/2021440686330Open ↗
03/01/2021440660633Open ↗
▸BISBOROUGH INTAKE FORM2
12/15/2022440660633Open ↗
11/17/2020421793321Open ↗
▸Other Documents14
▸BISPlot Diagram1
03/05/2009410197683Open ↗
▸BISBPP81
05/09/2024440686330Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
09/14/2023440686330Open ↗
▸BISSHUTOFF DAMPERS1
01/29/2024440660633Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/01/2021440660633Open ↗
▸BISLOWEST FLOOR ELEVATION1
01/29/2024440660633Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
04/26/2024440686330Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/14/2023440686330Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
01/29/2024440660633Open ↗
▸BISUNDERPINNING (2014)1
01/29/2024440660633Open ↗
▸BISVESTIBULES1
01/29/2024440660633Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/29/2024440660633Open ↗
▸BISMAINTENANCE INFORMATION1
01/29/2024440660633Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00560606-I1Open ↗