← Back
Two family brick
23-33 CRESCENT STREET
QUEENS · BIN 4018702
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5BZoning
2,600 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,400 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 11/26/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2024——Heating and Air Conditioning Systems
Heat / Cool
Lg ARUN038GSS4 43,000 BTU · Vrf Outdoor ×2
1 job · most recent 04/28/2025
FiledStatusContractorScope
04/28/2025CompleteBROOKYLN SOLARWORKS, LLC—
1 job · most recent 11/26/2024
Wood
FiledStatusContractorScope
11/26/2024——Wood
Building Lifecycle
All (30)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Objection (4)Special Inspection (21)
09/04/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01216330-I1
05/07/2025
Permit issued — Solar
Q01216330-I1-SL
04/30/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01216330-I1
01/16/2025
Special inspection requirement — Masonry
12/30/2024
Special inspection requirement — Ventilation and air distribution system
12/11/2024
Objection raised — Admin
12/11/2024
Objection raised — Inspections
12/11/2024
Objection raised — Energy
12/11/2024
Objection raised — Cost
11/26/2024
Filed — Alteration CO
PROPOSED ALTERATION TO RENOVATE EXISTING CELLAR, FIRST AND SECOND FLOORS OF TWO FAMILY RESIDENCE TO INCLUDE, FRAMING, FINISHES, PLUMBING AND HVAC WORK. CONVERT PORTION OF EXISTING GARAGE INTO ACCESSORY USES AT CELLAR SPACE
Q01126743-I1
10/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/14/2024
Special inspection requirement — Mechanical Systems
10/14/2024
Special inspection requirement — Energy Code Compliance Inspections
10/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
10/14/2024
Special inspection requirement — Structural Wood Frame
10/14/2024
Special inspection requirement — Final
10/14/2024
Special inspection requirement — Fenestration areas
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
10/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
10/14/2024
Special inspection requirement — Maintenance information
10/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
10/14/2024
Special inspection requirement — Fenestration air leakage
10/14/2024
Special inspection requirement — Insulation placement and R values
10/14/2024
Special inspection requirement — Permanent certificate
10/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
10/14/2024
Special inspection requirement — Interior lighting power
10/14/2024
Special inspection requirement — Air barrier - visual inspection
10/14/2024
Special inspection requirement — Heating Systems
12/30/2005
Violation issued (ECB, closed)
Construction
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/24/2024$1.5M—TCF ASTORIA PROPERTIES LLC → Private party$567/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC104/30/2025
FRANK J QUATELA ARCHITECT P.C111/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244104/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC05/07/2025
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/16/2025Masonry—special
12/30/2024Ventilation and air distribution system—energy_progress
10/14/2024Structural Stability – Alterations of existing buildings—special
10/14/2024Mechanical Systems—special
10/14/2024Energy Code Compliance Inspections—progress
10/14/2024Fire-Resistance Rated Construction—progress
10/14/2024Structural Wood Frame—progress
10/14/2024Final—progress
10/14/2024Fenestration areas—energy_progress
10/14/2024Fire-Resistant Penetrations and Joints—special
10/14/2024HVAC-R and service water piping design and insulation—energy_progress
10/14/2024HVAC-R and service water heating equipment—energy_progress
10/14/2024Maintenance information—energy_progress
10/14/2024HVAC-R and service water heating system controls—energy_progress
10/14/2024Fenestration air leakage—energy_progress
10/14/2024Insulation placement and R values—energy_progress
10/14/2024Permanent certificate—energy_progress
10/14/2024Fenestration and door U-factor and product ratings—energy_progress
10/14/2024Interior lighting power—energy_progress
10/14/2024Air barrier - visual inspection—energy_progress
10/14/2024Heating Systems—special
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01126743-I1Request digital key ↗
08/20/2026Q01216330-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01126743-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01126743-I1Open ↗
08/20/2026Q01216330-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01126743-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01216330-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01216330-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/21/2026Q01126743-I1Open ↗