Elevator cooperative
23-25 BELL BOULEVARD
QUEENS · BIN 4443760
💬 Discuss this project
1961Year Built
6Stories
D4Building Class
R5Zoning
157,080 sfGross Floor Area
127Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: BAY COUNTRY OWNERS C · 200,000 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 6Under Construction4p · 1 filing · 10 docs
Floor 5Under Construction4p · 1 filing · 10 docs
Floor 4Under Construction4p · 1 filing · 10 docs
Floor 3Under Construction4p · 1 filing · 10 docs
Floor 2Under Construction4p · 1 filing · 10 docs
Floor 1Under Construction7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1209/15/2026
ROCK GROUP NY CORP503/22/2026
BAY COUNTRY OWNER CORP1903/22/2026
BAY COUNRTY OWNERS CORP C103/22/2026
BAY COUNTRY OWNERS/MGRE C103/22/2026
CHARLES H GREENTHAL303/21/2026
MGRE203/21/2026
PHOENIX BRIDGING INC DBA PHOENIX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PENTA WINDMILLER ARCHITECTURE, PC108/10/2026
DASARC301/14/2026
ASIF JAMIL, RA104/13/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor303/21/2026
DENTAL OFFICE BUILDERSGeneral Contractor204/09/2026
S.A.L. ELECTRIC CO INC.Electrical103/22/2026
JMPB DESIGN BUILD CORPGeneral Contractor109/15/2026
RRP PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION5859301/14/2026
Building Lifecycle
All (90)Filed (5)Permit Issued (5)Signed Off (3)Facade (FISP) (15)Violation (24)Inspection (3)Objection (6)Special Inspection (29)
09/14/2026
Permit issued — General Construction
Q01434497-I1-GC
08/24/2026
Objection resolved — Resolved
08/20/2026
Objection raised — Cost
08/10/2026
Filed — Alteration
Interior renovation of existing Lobby and Corridors to replace finishes and some light fixtures. no change in use, occupancy and egress.
Q01434497-I1
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
07/21/2026
Special inspection requirement — Lighting controls
WILLIAM ROSS
07/21/2026
Special inspection requirement — Interior lighting power
WILLIAM ROSS
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
07/21/2026
Special inspection requirement — Final
jifat windmiller
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM ROSS
01/23/2026
Signed off — Alteration
General construction consisting of partitions and finishes along with installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy.
Q01195844-I1
01/23/2026
Signed off — Alteration
General construction consisting of partitions and finishes along with installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy.
Q01195844-S1
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ruchira Madan
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/22/2026
Special inspection requirement — Mechanical Systems
Max Lee
01/22/2026
Special inspection requirement — Final
Ruchira Madan
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Ruchira Madan
01/22/2026
Special inspection requirement — Interior lighting power
Ruchira Madan
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ruchira Madan
01/22/2026
Special inspection requirement — Lighting controls
Ruchira Madan
01/14/2026
Filed — Alteration
General construction consisting of partitions and finishes along with installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy.
Q01195844-P1
01/14/2026
Special inspection requirement — Final
Ruchira Madan
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Ruchira Madan
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/14/2026
Special inspection requirement — Mechanical Systems
Max Lee
01/14/2026
Special inspection requirement — Interior lighting power
Ruchira Madan
01/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ruchira Madan
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ruchira Madan
01/14/2026
Special inspection requirement — Lighting controls
Ruchira Madan
10/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2025
Permit issued — Mechanical Systems
Q01195844-I1-GC-CX
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/02/2025
Permit issued — Plumbing
Q01195844-S1-PL
05/09/2025
Permit issued — Mechanical Systems
Q01195844-I1-GC-CX
05/04/2025
Objection resolved — Addressed
05/04/2025
Objection resolved — Addressed
04/24/2025
Objection raised — Other
04/24/2025
Objection raised — Plumbing
04/17/2025
Filed — Alteration
General construction consisting of partitions and finishes along with installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy.
Q01195844-I1
04/17/2025
Filed — Alteration
General construction consisting of partitions and finishes along with installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy.
Q01195844-S1
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
04/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
09/21/2023
Cycle 9 facade report signed — SAFE
08/23/2023
Cycle 9 facade report submitted
06/26/2023
Cycle 9 facade inspection completed
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/08/2019
Cycle 8 facade report submitted
05/07/2019
Cycle 8 facade report signed — SAFE
03/27/2019
Cycle 8 facade inspection completed
02/26/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00023018-I1
04/16/2018
Permit issued — Sidewalk Shed
Q00023018-I1-SH
04/13/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00023018-I1
04/13/2018
Special inspection requirement — Preliminary
asif jamil
02/27/2018
Special inspection requirement — Final
asif jamil
12/13/2016
Cycle 8 facade report submitted
12/13/2016
Cycle 8 facade report signed — SWARMP
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJMPB DESIGN BUILD CORP09/14/2026
DOB NOWMechanical SystemsSigned-offDENTAL OFFICE BUILDERS06/27/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP06/02/2025
DOB NOWMechanical SystemsSigned-offDENTAL OFFICE BUILDERS05/09/2025
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP04/16/2018
BISOTISSUEDSATO CONSTRUCTION CO.INC03/16/2021
BISOTISSUEDAMSTERDAM RESTORATION LLC06/01/2018
BISOTISSUEDAMSTERDAM RESTORATION LLC04/18/2018
BISOTISSUEDAMERICAN VENTILATION SERV12/23/2015
BISOTISSUEDSATO CONSTRUCTION CO.INC03/02/2012
BISOTISSUEDSATO CONSTRUCTION CO.INC01/30/2012
BISOTISSUEDSATO CONSTRUCTION CO.INC01/12/2012
BISEQISSUEDPHOENIX BRIDGING INC12/09/2011
BISOTISSUEDSATO CONSTRUCTION CO.INC05/24/2011
BISEQISSUEDPHOENIX BRIDGING INC05/17/2011
5 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedNGM ELECTRIC INC—
07/03/2025Permit IssuedELMAC ELECTRIC INC.General Wiring
08/11/2020CompleteS.A.L. ELECTRIC CO INC.—
04/25/2018CompleteOHM PRO ELECTL CONST CORP—
03/06/2018CompleteLINTECH ELECTRIC, INC.—
1 project · most recent 08/10/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/10/2026Permit IssuedJMPB DESIGN BUILD CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
07/21/2026Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
07/21/2026Lighting controlsWILLIAM ROSSenergy_progress
07/21/2026Interior lighting powerWILLIAM ROSSenergy_progress
07/21/2026Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
07/21/2026Energy Code Compliance InspectionsWILLIAM ROSSprogress
07/21/2026Finaljifat windmillerprogress
07/21/2026Tenant Protection Plan ComplianceWILLIAM ROSSspecial
01/22/2026Fire-Resistance Rated ConstructionRuchira Madanprogress
01/22/2026Tenant Protection Plan ComplianceMax Leespecial
01/22/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/22/2026Mechanical SystemsMax Leespecial
01/22/2026FinalRuchira Madanprogress
01/22/2026Energy Code Compliance InspectionsRuchira Madanprogress
01/22/2026Interior lighting powerRuchira Madanenergy_progress
01/22/2026HVAC-R and service water piping design and insulationRuchira Madanenergy_progress
01/22/2026Lighting controlsRuchira Madanenergy_progress
01/14/2026FinalRuchira Madanprogress
01/14/2026Energy Code Compliance InspectionsRuchira Madanprogress
01/14/2026Tenant Protection Plan Compliance—special
01/14/2026Mechanical SystemsMax Leespecial
01/14/2026Interior lighting powerRuchira Madanenergy_progress
01/14/2026HVAC-R and service water piping design and insulationRuchira Madanenergy_progress
01/14/2026Fire-Resistant Penetrations and JointsMax Leespecial
01/14/2026Fire-Resistance Rated ConstructionRuchira Madanprogress
01/14/2026Lighting controlsRuchira Madanenergy_progress
Latest 25 of 29.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026Q00023018-I1Request digital key ↗
08/20/2026Q01195844-I1Request digital key ↗
08/20/2026Q01195844-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION10
03/16/2021440649452Open ↗
06/04/2018421623835Open ↗
04/24/2018421623835Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
08/05/2021440649452Open ↗
07/02/2021440649452Open ↗
01/19/2021440649452Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature19
09/25/2026Q01434497-I1Open ↗
09/25/2026Q01434497-I1Open ↗
09/25/2026Q01434497-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/18/2019421623835Open ↗
04/24/2018421623835Open ↗
03/10/2017440277825Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/25/2026Q01434497-I1Open ↗
09/25/2026Q01434497-I1Open ↗
09/02/2026Q01195844-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026Q00023018-I1Open ↗
08/20/2026Q01195844-S1Open ↗
08/20/2026Q01195844-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/20/2020440649452Open ↗
04/24/2018421623835Open ↗
12/22/2015440277825Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/24/2018421623835Open ↗
05/18/2011420356929Open ↗
03/08/2011420328274Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/18/2011420356929Open ↗
03/08/2011420328274Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/20/2020440649452Open ↗
12/22/2015440277825Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/20/2020440649452Open ↗
12/22/2015440277825Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
04/24/2018421623835Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/16/2021440649452Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/20/2020440649452Open ↗
04/24/2018421623835Open ↗
12/22/2015440277825Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01195844-S1Open ↗
08/20/2026Q01195844-I1Open ↗
08/16/2026Q01434497-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/18/2011420356929Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/08/2011420328274Open ↗
▸Energy Compliance7
▸BISAS-BUILT ENERGY ANALYSIS2
01/14/2021440649452Open ↗
03/10/2017440277825Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/20/2020440649452Open ↗
12/22/2015440277825Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/20/2020440649452Open ↗
12/22/2015440277825Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/10/2017440277825Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/11/2021440649452Open ↗
09/20/2021440649452Open ↗
09/08/2021440649452Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/15/2021440649452Open ↗
04/04/2019421623835Open ↗
03/13/2017440277825Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/10/2017440277825Open ↗
10/05/2012420356929Open ↗
12/12/2011420356929Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/18/2011420356929Open ↗
03/08/2011420328274Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
11/20/2020440649452Open ↗
03/18/2019421623835Open ↗
04/24/2018421623835Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/10/2021440649452Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
04/24/2018421623835Open ↗
05/18/2011420356929Open ↗
03/08/2011420328274Open ↗
▸BISADDITIONAL INFORMATION2
11/10/2021440649452Open ↗
08/05/2021440649452Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/20/2020440649452Open ↗
12/22/2015440277825Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/15/2021440649452Open ↗