← Back
BuildNYC
Church, synagogue, chapel
Academy of the City Middle School
23-40 ASTORIA BOULEVARD · BIN 4439576
💬 Discuss this project
1924Year Built
5Stories
M1Building Class
R6AZoning
77,510 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only 2 likely answered ▸FDNY Report ↗
Church, synagogue, chapel · 77,800 sf lot · 1 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAcademy of the City31p · 6 filings · 12 docs
Floor 3Academy of the City26p · 5 filings · 12 docs
Floor 2Academy of the City29p · 5 filings · 12 docs
Floor 1Academy of the City, City Charter School29p · 7 filings · 12 docs
CellarAcademy of the City26p · 4 filings · 12 docs
BasementAcademy of the City2p · 2 filings · 12 docs
Sub-BasementAcademy of the City25p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset2807/08/2026
Roman Catholic Church Our1303/21/2026
Victoria Consulting Development303/21/2026
Academy of the Charter Shcool, Friends of Academy of the City203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MG Engineering811/18/2020
KSS Architects107/07/2020
Silman111/04/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 21472003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gannon ContractingGeneral Contractor407/08/2026
A.T. Elect'l ConstructionElectrical203/22/2026
Full Capacity FireFire Protection207/08/2026
Par Plumbing CoPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254811/18/2020
Building Lifecycle
All (68)Filed (10)Permit Issued (7)Signed Off (6)Violation (10)Objection (14)Special Inspection (21)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/11/2021
Violation issued (FDNY_NOV, closed)
01/19/2021
Signed off — Alteration
filing herewith structural work associated with interior renovations as per plans. no change in use, egress, or occupancy.
Q00255830-I1
12/10/2020
Signed off — Alteration
FILING HERWITH PAA FOR REVISED SP LAYOUT AND HEAD COUNT AS PER AS BUILT CONDITIONS. PLEASE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
Q00338925-I1
12/03/2020
Signed off — Alteration
filing herewith plumbing interior work in conjunction with interior renovation of existing school as per plans. no change in use, egress, or occupancy.
Q00238141-I1
12/02/2020
Signed off — Alteration
Q00245981-I1
11/25/2020
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
11/25/2020
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
11/18/2020
Filed — Alteration
FILING HERWITH PAA FOR REVISED SP LAYOUT AND HEAD COUNT AS PER AS BUILT CONDITIONS. PLEASE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
Q00338925-P3
11/17/2020
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
11/17/2020
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
10/28/2020
Signed off — Alteration
FILING HEREWITH PLUMBING FIXTURES REMOVAL ASSOCIATED WITH CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00222648-I1
10/13/2020
Filed — Alteration
FILING HERWITH PAA FOR REVISED SP LAYOUT AND HEAD COUNT AS PER AS BUILT CONDITIONS. PLEASE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
Q00338925-P2
10/08/2020
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
10/08/2020
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
08/04/2020
Filed — Alteration
FILING HERWITH PAA FOR REVISED SP LAYOUT AND HEAD COUNT AS PER AS BUILT CONDITIONS. PLEASE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
Q00338925-P1
07/30/2020
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
07/30/2020
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
07/21/2020
Signed off — Alteration
FILING HEREWITH MECHANICAL REMOVALS ASSOCIATED WITH INTERIOR WORK. AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q00222625-I1
07/07/2020
Filed — No Work
Q00363969-I1
06/03/2020
Permit issued — Sprinklers
Q00338925-I1-EW-SD
06/03/2020
Permit issued — Standpipe
Q00338925-I1-EW-SP
05/22/2020
Filed — Alteration
FILING HERWITH PAA FOR REVISED SP LAYOUT AND HEAD COUNT AS PER AS BUILT CONDITIONS. PLEASE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
Q00338925-I1
05/07/2020
Permit issued — Mechanical Systems
Q00245981-I1-MS
04/22/2020
Permit issued — Structural
Q00255830-I1-ST
02/26/2020
Permit issued — Plumbing
Q00238141-I1-PL
11/26/2019
Objection resolved — Addressed
11/25/2019
Objection resolved — Addressed
11/25/2019
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
11/25/2019
Special inspection requirement — HVAC insulation and sealing
MAURICIO ANDRADE
11/25/2019
Special inspection requirement — HVAC and service water heating equipment
MAURICIO ANDRADE
11/25/2019
Special inspection requirement — HVAC and service water heating system controls
MAURICIO ANDRADE
11/22/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
11/15/2019
Objection resolved — Addressed
11/15/2019
Objection resolved — Addressed
11/15/2019
Objection resolved — Addressed
11/15/2019
Objection resolved — Addressed
11/13/2019
Objection resolved — Addressed
11/07/2019
Permit issued — Mechanical Systems
Q00222625-I1-MS
11/06/2019
Objection raised — Admin
11/06/2019
Objection raised — Admin
11/06/2019
Objection raised — Admin
11/06/2019
Objection raised — Admin
11/04/2019
Filed — Alteration
filing herewith structural work associated with interior renovations as per plans. no change in use, egress, or occupancy.
Q00255830-I1
10/30/2019
Objection raised — Other
10/30/2019
Objection raised — Inspections
10/30/2019
Objection raised — Inspections
10/30/2019
Special inspection requirement — Concrete - Cast-In-Place
MAURICIO ANDRADE
10/30/2019
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
10/30/2019
Special inspection requirement — Structural Steel - Details
MAURICIO ANDRADE
10/30/2019
Special inspection requirement — Structural Steel - High Strength Bolting
MAURICIO ANDRADE
10/30/2019
Special inspection requirement — Structural Steel - Welding
MAURICIO ANDRADE
10/30/2019
Special inspection requirement — Final
MAURICIO ANDRADE
10/24/2019
Filed — Alteration
filing herewith plumbing interior work in conjunction with interior renovation of existing school as per plans. no change in use, egress, or occupancy.
Q00238141-I1
10/24/2019
Filed — Alteration
Q00245981-I1
10/09/2019
Permit issued — Plumbing
Q00222648-I1-PL
10/01/2019
Filed — Alteration
FILING HEREWITH PLUMBING FIXTURES REMOVAL ASSOCIATED WITH CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00222648-I1
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offFull Capacity Fire06/03/2020
DOB NOWSprinklersSigned-offFull Capacity Fire06/03/2020
DOB NOWMechanical SystemsSigned-offGannon Contracting05/07/2020
DOB NOWStructuralSigned-offGannon Contracting04/22/2020
DOB NOWPlumbingSigned-offPar Plumbing Co02/26/2020
DOB NOWMechanical SystemsSigned-offGannon Contracting11/07/2019
DOB NOWPlumbingSigned-offPar Plumbing Co10/09/2019
BIS—ISSUEDGannon Contracting06/09/2020
BIS—ISSUEDGannon Contracting06/09/2020
BISOTISSUEDGannon Contracting02/20/2020
BISOTISSUEDGannon Contracting02/14/2020
BISOTISSUEDGannon Contracting01/23/2020
BISOTISSUEDGannon Contracting10/02/2019
BISBLISSUEDBondee Enterprises07/21/2017
BISOTISSUEDBondee Enterprises07/19/2017
BISBLISSUEDBondee Enterprises07/03/2017
BISPLISSUEDBondee Enterprises07/03/2017
BISEQISSUEDPhoenix Sutton STR08/13/2013
BISEQISSUEDVictoria Consulting & Development08/12/2013
BISOTISSUEDVictoria Consulting & Development08/12/2013
BISOTISSUEDVictoria Consulting & Development07/02/2013
BISEQISSUEDVictoria Consulting & Development04/16/2013
BISEQISSUEDPhoenix Sutton STR03/15/2013
BISEQISSUEDVictoria Consulting & Development08/10/2011
BISEQISSUEDVictoria Consulting & Development07/11/2011
BISOTISSUEDVictoria Restoration05/14/2003
3 projects · most recent 01/14/2021
General Wiring
FiledStatusContractorScope
01/14/2021CompleteA.T. Elect'l ConstructionGeneral Wiring
06/10/2020CompleteJam Electrical—
02/28/2020CompleteA.T. Elect'l ConstructionGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/25/2020Standpipe SystemsMAURICIO ANDRADEspecial
11/25/2020Sprinkler SystemsMAURICIO ANDRADEspecial
11/17/2020Sprinkler SystemsMAURICIO ANDRADEspecial
11/17/2020Standpipe SystemsMAURICIO ANDRADEspecial
10/08/2020Sprinkler SystemsMAURICIO ANDRADEspecial
10/08/2020Standpipe SystemsMAURICIO ANDRADEspecial
07/30/2020Sprinkler SystemsMAURICIO ANDRADEspecial
07/30/2020Standpipe SystemsMAURICIO ANDRADEspecial
11/25/2019Post-installed AnchorsMAURICIO ANDRADEspecial
11/25/2019HVAC insulation and sealing MAURICIO ANDRADEenergy_progress
11/25/2019HVAC and service water heating equipment MAURICIO ANDRADEenergy_progress
11/25/2019HVAC and service water heating system controls MAURICIO ANDRADEenergy_progress
11/22/2019Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/30/2019Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
10/30/2019Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
10/30/2019Structural Steel - DetailsMAURICIO ANDRADEspecial
10/30/2019Structural Steel - High Strength BoltingMAURICIO ANDRADEspecial
10/30/2019Structural Steel - WeldingMAURICIO ANDRADEspecial
10/30/2019FinalMAURICIO ANDRADEprogress
09/05/2019Mechanical SystemsMAURICIO ANDRADEspecial
09/05/2019FinalMAURICIO ANDRADEprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
City Charter SchoolEducationFloor 1
Project Q00363969 No Work · PA Certificate of Operation Issued · 07/07/2020
Academy of the CityEducationCellar, Sub-basement, Floors 1–3, Roof
Project Q00338925 Alteration · LOC Issued · 05/22/2020
Project Q00255830 Alteration · LOC Issued · 11/04/2019
Project Q00238141 Alteration · LOC Issued · 10/24/2019
Project Q00245981 Alteration · LOC Issued · 10/24/2019
Project Q00222625 Alteration · LOC Issued · 10/01/2019
Project Q00222648 Alteration · LOC Issued · 10/01/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 229 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch - Standpipe4
08/28/2026Q00338925-I1Request digital key ↗
08/15/2026Q00338925-P1Request digital key ↗
08/15/2026Q00338925-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/28/2026Q00338925-I1Request digital key ↗
08/15/2026Q00338925-P1Request digital key ↗
08/15/2026Q00338925-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00222625-I1Request digital key ↗
08/28/2026Q00245981-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00222648-I1Request digital key ↗
08/15/2026Q00238141-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026Q00363969-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026Q00255830-I1Request digital key ↗
▸Applications & Permits39
▸BISWORK PERMIT APPLICATION19
06/09/2020420666540Open ↗
06/09/2020420666540Open ↗
06/09/2020420666540Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION19
10/20/2021420666540Open ↗
02/18/2021420833879Open ↗
02/11/2021420833879Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/15/2020420666540Open ↗
▸Seals & Professional Certifications56
▸DOB NOWSpecial Inspector Seal & Signature16
08/29/2026Q00338925-I1Open ↗
08/29/2026Q00338925-I1Open ↗
08/28/2026Q00338925-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
05/13/2020420666540Open ↗
05/13/2020420666540Open ↗
01/30/2020421908430Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00222648-I1Open ↗
08/28/2026Q00222625-I1Open ↗
08/28/2026Q00245981-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
09/17/2019421915636Open ↗
07/07/2017421489534Open ↗
07/03/2013420864201Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026Q00238141-I1Open ↗
08/27/2026Q00238141-I1Open ↗
08/27/2026Q00238141-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
07/03/2013420864201Open ↗
04/18/2013420833879Open ↗
03/19/2013420823390Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/17/2019421915636Open ↗
07/07/2017421489534Open ↗
▸Trade Schedules & Equipment6
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
03/28/2019421489534Open ↗
03/28/2019421489534Open ↗
03/28/2019421489534Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/07/2017421489534Open ↗
07/07/2017421489534Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/07/2017421489534Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
04/16/2020420666540Open ↗
02/12/2020420666540Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/28/2026Q00222648-I1Open ↗
08/28/2026Q00222625-I1Open ↗
08/28/2026Q00245981-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
01/30/2020421908430Open ↗
10/03/2019421915636Open ↗
07/09/2013420864201Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/13/2020420666540Open ↗
07/07/2017421489534Open ↗
04/18/2013420833879Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/14/2011420458061Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
07/03/2013420864201Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/29/2020421908430Open ↗
09/17/2019421915636Open ↗
03/19/2019421489534Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/17/2020420666540Open ↗
07/22/2020421915636Open ↗
▸BISTR8: Energy Code Progress Inspections2
06/03/2014420864201Open ↗
07/03/2013420864201Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/19/2019421489534Open ↗
06/03/2014420864201Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/17/2020421908430Open ↗
04/16/2020420666540Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/22/2020421915636Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/17/2020421908430Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00245981-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/12/2021420458061Open ↗
12/21/2020420666540Open ↗
12/15/2020401630197Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/17/2020420666540Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/17/2020420666540Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/17/2020420666540Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/17/2020420666540Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/21/2020420666540Open ↗
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/28/2026Q00222648-I1Open ↗
08/28/2026Q00222625-I1Open ↗
08/28/2026Q00245981-I1Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
03/12/2021420833879Open ↗
01/12/2021420458061Open ↗
12/24/2020420666540Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
10/20/2021420666540Open ↗
11/13/2020420666540Open ↗
07/23/2020420666540Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/13/2020420666540Open ↗
10/24/2019421908430Open ↗
09/17/2019421915636Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/07/2017421489534Open ↗
07/03/2013420864201Open ↗
04/18/2013420833879Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
07/22/2020421915636Open ↗
▸BISSHED LETTER1
08/17/2013420823390Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT9
12/15/2020401630197Open ↗
11/13/2020421908430Open ↗
04/27/2020420666540Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/21/2020420666540Open ↗
07/22/2020421915636Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/09/2020420666540Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
04/01/2020420666540Open ↗
12/19/2019420666540Open ↗
10/24/2019421908430Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
11/17/2020420666540Open ↗
10/13/2020420666540Open ↗
07/30/2020420666540Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet2
07/03/2013420864201Open ↗
04/18/2013420833879Open ↗
▸BISBOROUGH INTAKE FORM1
05/15/2020420666540Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
02/12/2020420666540Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/12/2020420666540Open ↗
▸DOB NOWAdditional Documents (Photos)1
08/13/2026Q00363969-I1Open ↗