Three families
23-46 COLLEGE POINT BOULEVARD
QUEENS · College Point · BIN 4617206
💬 Discuss this project
2022Year Built
—Stories
C0Building Class
R5BZoning
3,122 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 14519 PROPERTY LLC · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Floor 368p · 1 filing · 20 docs
Floor 270p · 1 filing · 20 docs
Floor 170p · 1 filing · 20 docs
Cellar69p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
14519 PROPERTY LLC103/22/2026
DYNASTY CONTRACTING103/22/2026
DYNASTY CONSTRUCTING LLC203/22/2026
BWT CONSTRUCTION203/22/2026
GOLDENTIME CONTRACTING IN103/22/2026
BILLY ENTERPRISES203/21/2026
AA23 PROPERTY1503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2024$1.5M—— → —$480/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC607/08/2024
HAIDER ENGINEERING, P.E.311/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1203/21/2026
HAIDER ENGINEERING, P.E.303/21/2026
HAIDER ENGINEERING P E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN TIME CONTRACTING IGeneral Contractor1503/22/2026
BILLY ENTERPRISES INCGeneral Contractor1307/08/2026
RRP PLUMBING CORPPlumbing407/08/2026
SIMING MEIElectrical103/21/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129607/08/2024
TRIANGLE INSPECTION & TES7495207/05/2023
Building Lifecycle
All (80)Filed (9)Permit Issued (11)Signed Off (4)Violation (8)Inspection (8)Objection (10)Special Inspection (30)
12/06/2024
Signed off — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00609284-I1
12/03/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00074266-I1
12/03/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00074254-I1
07/08/2024
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00609284-P4
07/08/2024
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
07/08/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
07/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/08/2024
Special inspection requirement — Heating Systems
MEHDI GHAZI
07/08/2024
Special inspection requirement — Masonry
MEHDI GHAZI
07/08/2024
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
07/08/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
07/08/2024
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
07/08/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
07/08/2024
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
07/08/2024
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
07/08/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/08/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/08/2024
Special inspection requirement — Final
MEHDI GHAZI
07/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
07/08/2024
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
07/08/2024
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
07/08/2024
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
07/08/2024
Special inspection requirement — Maintenance information
MEHDI GHAZI
07/08/2024
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
07/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
07/08/2024
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
07/08/2024
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
07/08/2024
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
07/08/2024
Special inspection requirement — Fenestration areas
MEHDI GHAZI
07/08/2024
Special inspection requirement — Metering
MEHDI GHAZI
07/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/08/2024
Special inspection requirement — Permanent certificate
MEHDI GHAZI
07/08/2024
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
04/23/2024
Signed off — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00609284-S1
04/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2024
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00609284-P3
03/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/26/2024
Permit issued — Sprinklers
Q00609284-S1-EW-SP
02/22/2024
Permit issued — Sprinklers
Q00609284-S1-PL
09/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2023
Permit issued — General Construction
Q00609284-I1-GC-CX
08/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/05/2023
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00609284-P2
05/30/2023
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNIT. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00609284-P1
05/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2023
Violation issued (ECB, closed)
Construction
01/26/2023
Permit issued — Sprinklers
Q00609284-S1-PL
12/02/2022
Violation issued (ECB, closed)
Construction
08/17/2022
Permit issued — Structural
Q00609284-I1-GC-CX
07/20/2022
Objection raised — Structural
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection raised — Inspections
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection raised — Structural
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection raised — Structural
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.02/26/2024
DOB NOWSprinklersSigned-offRRP PLUMBING CORP02/22/2024
DOB NOWGeneral ConstructionPermit IssuedGOLDEN TIME CONTRACTING I08/11/2023
DOB NOWSprinklersSigned-offRRP PLUMBING CORP01/26/2023
DOB NOWStructuralPermit IssuedGOLDEN TIME CONTRACTING I08/17/2022
DOB NOWEarth WorkPermit IssuedGOLDEN TIME CONTRACTING I06/17/2022
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC01/14/2019
DOB NOWSupported ScaffoldSigned-offBILLY ENTERPRISES INC10/03/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC10/03/2018
DOB NOWSupported ScaffoldSigned-offBILLY ENTERPRISES INC08/31/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC08/31/2018
BISEQISSUEDPRECISE CONTRACTING AND08/31/2021
BIS—ISSUEDPRECISE CONTRACTING AND08/06/2021
BIS—ISSUEDPRECISE CONTRACTING AND08/26/2020
BISEQISSUEDPRECISE CONTRACTING AND08/26/2020
BIS—ISSUEDPRECISE CONTRACTING AND08/26/2020
BIS—ISSUEDBWT CONSTRUCTION CORP02/03/2020
BIS—ISSUEDBWT CONSTRUCTION CORP02/03/2020
BISEQISSUEDBWT CONSTRUCTION CORP01/28/2020
BIS—ISSUEDBWT CONSTRUCTION CORP02/27/2019
BISEQISSUEDBWT CONSTRUCTION CORP02/19/2019
BIS—ISSUEDMELCON GENERAL CONTRCTORS02/14/2019
BISEQISSUEDMELCON GENERAL CONTRCTORS02/14/2019
BIS—ISSUEDDYNASTY CONTRACTING LLC09/05/2018
BISEQISSUEDDYNASTY CONTRACTING LLC04/12/2018
BIS—ISSUEDDYNASTY CONTRACTING LLC04/12/2018
BISEQISSUEDRICHMOND CONSTRUCTION INC02/01/2018
BIS—ISSUEDRICHMOND CONSTRUCTION INC02/01/2018
1 project · most recent 07/08/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2024Permit IssuedGOLDEN TIME CONTRACTING IHeating Systems
Heating
Williamson GWA-70 70,000 BTU · Boiler ×8
1 project · most recent 07/08/2024
Sprinkler System
FiledStatusContractorScope
07/08/2024Signed-offRRP PLUMBING CORPSprinkler System
1 project · most recent 07/08/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/08/2024Signed-offRRP PLUMBING CORPGas, Storm, Water/Sanitary
2 projects · most recent 08/11/2020
General Wiring
FiledStatusContractorScope
08/11/2020CompleteKJK ELECTRIC INCGeneral Wiring
08/30/2018CompleteWCK ELECTRIC CORP.—
1 project · most recent 07/08/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
07/08/2024Signed-offRRP PLUMBING CORPSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
07/08/2024Chimneys and ventsMEHDI GHAZIspecial
07/08/2024Concrete - Cast-In-PlaceMEHDI GHAZIspecial
07/08/2024Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
07/08/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/08/2024Heating SystemsMEHDI GHAZIspecial
07/08/2024MasonryMEHDI GHAZIspecial
07/08/2024Mechanical SystemsMEHDI GHAZIspecial
07/08/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
07/08/2024Structural Steel - DetailsMEHDI GHAZIspecial
07/08/2024Structural Steel - High Strength BoltingMEHDI GHAZIspecial
07/08/2024Structural Steel - WeldingMEHDI GHAZIspecial
07/08/2024Subgrade InspectionsMEHDI GHAZIspecial
07/08/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/08/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/08/2024FinalMEHDI GHAZIprogress
07/08/2024Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
07/08/2024Footing and FoundationMEHDI GHAZIprogress
07/08/2024Structural Wood FrameMEHDI GHAZIprogress
07/08/2024Air barrier — testing MEHDI GHAZIenergy_progress
07/08/2024Maintenance informationMEHDI GHAZIenergy_progress
07/08/2024Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
07/08/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/08/2024Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
07/08/2024Air barrier - visual inspectionMEHDI GHAZIenergy_progress
07/08/2024Insulation placement and R valuesMEHDI GHAZIenergy_progress
Latest 25 of 86.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026Q00074266-I1Request digital key ↗
08/28/2026Q00074254-I1Request digital key ↗
08/28/2026Q00074254-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION16
06/07/2021440667716Open ↗
11/04/2020421302361Open ↗
11/04/2020421302361Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
08/26/2024421302361Open ↗
06/04/2024421302361Open ↗
08/13/2021440667716Open ↗
Showing 3 of 12 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
06/07/2021440667716Open ↗
▸Zoning, Tax Lot & Property Records22
▸DOB NOWRestrictive Declaration/Easement 16
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-P1Open ↗
08/24/2026Q00609284-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026Q00609284-I1Open ↗
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/24/2026Q00609284-P1Open ↗
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-I1Open ↗
Showing 3 of 4 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
05/15/2017421302361Open ↗
05/15/2017421302361Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
05/12/2017421302361Open ↗
06/09/2016421302361Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/09/2016421302361Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/12/2017421302361Open ↗
▸BISZONING DIAGRAM1
05/24/2017421302361Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00609284-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026Q00609284-P2Open ↗
09/02/2026Q00609284-P2Open ↗
09/01/2026Q00609284-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026Q00609284-P2Open ↗
09/02/2026Q00609284-P2Open ↗
09/01/2026Q00609284-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00074266-I1Open ↗
08/28/2026Q00074254-P1Open ↗
08/28/2026Q00074254-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/25/2020421302361Open ↗
11/12/2019421302361Open ↗
08/07/2018421302361Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/07/2021440667716Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-I1Open ↗
08/24/2026Q00609284-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/06/2017421302361Open ↗
06/21/2017421302361Open ↗
05/09/2017421302361Open ↗
▸BISSCHEDULE B - PLUMBING1
07/29/2020421302361Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/24/2026Q00609284-P1Open ↗
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
06/09/2016421302361Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/02/2018421302361Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/04/2021440667716Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00609284-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00609284-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00609284-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/12/2019421302361Open ↗
11/12/2019421302361Open ↗
02/02/2018421302361Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00609284-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/27/2021440667716Open ↗
10/27/2021440667716Open ↗
09/22/2021440667716Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT4
08/24/2026Q00609284-P1Open ↗
08/24/2026Q00609284-I1Open ↗
08/24/2026Q00609284-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/07/2018421302361Open ↗
02/02/2018421302361Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/07/2018421302361Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/02/2018421302361Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/12/2017421302361Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00609284-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00609284-I1Open ↗
▸Approvals, Objections & Sign-offs16
▸BISLETTERS - SUPPORTING DOCUMENTATION8
08/26/2024421302361Open ↗
06/04/2024421302361Open ↗
11/01/2021440667716Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER4
06/04/2021440667716Open ↗
11/04/2020421302361Open ↗
02/21/2019421302361Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/01/2021440667716Open ↗
06/07/2021440667716Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/09/2016421302361Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
05/02/2017421302361Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE7
06/07/2021440667716Open ↗
11/04/2020421302361Open ↗
02/13/2020421302361Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT2
10/27/2021440667716Open ↗
03/05/2021440667716Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
05/15/2017421302361Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
04/16/2018421302361Open ↗
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM5
11/04/2020421302361Open ↗
11/04/2020421302361Open ↗
11/12/2019421302361Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
09/22/2021440667716Open ↗
05/12/2017421302361Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/07/2021440667716Open ↗
▸BISEFILING COVER SHEET1
06/09/2016421302361Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/24/2026Q00609284-P1Open ↗
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026Q00609284-I1Open ↗
08/24/2026Q00609284-P1Open ↗
08/24/2026Q00609284-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q00609284-I1Open ↗
08/24/2026Q00609284-P3Open ↗
08/24/2026Q00609284-P1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/16/2018421302361Open ↗
▸BISPLOT DIAGRAM1
06/09/2016421302361Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/28/2026Q00074266-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00609284-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00609284-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00609284-I1Open ↗