← Back
Two family converted from one family
23-52 98 STREET
QUEENS · East Elmhurst · BIN 4023839
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3XZoning
2,329 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 3,880 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 7 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MRW ASSOCIATES2107/08/2026
BUILDRITE CONTRACTING103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/01/2020$725K—Private party → Private party$311/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI111/04/2024
ARCHITECTURAL CONCEPT508/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1003/21/2026
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDRITE CONTRACTING INCGeneral Contractor407/08/2026
SAI JI PLUMBING, INCPlumbing207/08/2026
NY SOLAR ELECTRICAL LLCElectrical103/22/2026
NYSS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841111/04/2024
ARCHITECTURAL CONCEPT3642308/24/2022
Building Lifecycle
All (45)Filed (5)Permit Issued (5)Signed Off (3)Violation (1)Objection (8)Special Inspection (23)
12/11/2024
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01135731-I1
11/06/2024
Permit issued — Solar
Q01135731-I1-SL
11/04/2024
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01135731-I1
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
10/31/2024
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
10/31/2024
Special inspection requirement — Final
ROBERT MASONE
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
08/31/2023
Signed off — Alteration
Install temporary construction fence during construction as per drawings.
Q00408800-I1
08/22/2023
Signed off — Alteration
REPLACE EXISTING PLUMBING FIXTURES AND INSTALL ADDITIONAL PLUMBING FIXTURES AS PER DRAWINGS.
Q00374900-I1
08/29/2022
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
08/29/2022
Special inspection requirement — HVAC insulation and sealing
MUZAFFAR JAMAL
08/29/2022
Special inspection requirement — Electrical energy consumption
MUZAFFAR JAMAL
08/29/2022
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
08/29/2022
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
08/24/2022
Filed — Alteration
REPLACE EXISTING PLUMBING FIXTURES AND INSTALL ADDITIONAL PLUMBING FIXTURES AS PER DRAWINGS.
Q00374900-P2
06/30/2022
Special inspection requirement — HVAC insulation and sealing
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
06/30/2022
Special inspection requirement — Electrical energy consumption
MUZAFFAR JAMAL
06/09/2022
Permit issued — Plumbing
Q00374900-I1-PL
11/19/2021
Permit issued — Construction Fence
Q00408800-I1-FN
04/13/2021
Filed — Alteration
REPLACE EXISTING PLUMBING FIXTURES AND INSTALL ADDITIONAL PLUMBING FIXTURES AS PER DRAWINGS.
Q00374900-P1
04/13/2021
Special inspection requirement — HVAC insulation and sealing
MUZAFFAR JAMAL
04/13/2021
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
04/13/2021
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
04/13/2021
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
04/13/2021
Special inspection requirement — Electrical energy consumption
MUZAFFAR JAMAL
04/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
03/04/2021
Permit issued — Plumbing
Q00374900-I1-PL
01/19/2021
Violation issued (ECB, closed)
Construction
11/25/2020
Objection raised — Scope
11/25/2020
Objection resolved — Addressed
11/25/2020
Objection raised — Other
11/25/2020
Objection resolved — Addressed
11/25/2020
Objection raised — Inspections
11/25/2020
Objection resolved — Addressed
11/25/2020
Objection raised — Inspections
11/25/2020
Objection resolved — Addressed
11/20/2020
Filed — Alteration
REPLACE EXISTING PLUMBING FIXTURES AND INSTALL ADDITIONAL PLUMBING FIXTURES AS PER DRAWINGS.
Q00374900-I1
11/09/2020
Permit issued — Construction Fence
Q00408800-I1-FN
10/09/2020
Filed — Alteration
Install temporary construction fence during construction as per drawings.
Q00408800-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC11/06/2024
DOB NOWPlumbingSigned-offSAI JI PLUMBING, INC06/09/2022
DOB NOWConstruction FenceSigned-offBUILDRITE CONTRACTING INC11/19/2021
DOB NOWPlumbingSigned-offSAI JI PLUMBING, INC03/04/2021
DOB NOWConstruction FenceSigned-offBUILDRITE CONTRACTING INC11/09/2020
BIS—ISSUEDBUILDRITE CONTRACTING INC03/31/2022
BIS—ISSUEDBUILDRITE CONTRACTING INC03/18/2021
BIS—ISSUEDBUILDRITE CONTRACTING INC03/18/2021
BIS—ISSUEDBUILDRITE CONTRACTING INC12/30/2020
BIS—ISSUEDBUILDRITE CONTRACTING INC12/17/2020
2 projects · most recent 10/31/2024
General Wiring
FiledStatusContractorScope
10/31/2024CompleteNY SOLAR ELECTRICAL LLC—
03/21/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
10/31/2024Fire-Resistant Penetrations and JointsROBERT MASONEspecial
10/31/2024Air barrier - visual inspectionROBERT MASONEenergy_progress
10/31/2024FinalROBERT MASONEprogress
10/31/2024Energy Code Compliance InspectionsROBERT MASONEprogress
10/31/2024Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
08/29/2022HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
08/29/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
08/29/2022HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
08/29/2022Electrical energy consumptionMUZAFFAR JAMALenergy_progress
08/29/2022Maintenance informationMUZAFFAR JAMALenergy_progress
08/29/2022HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
06/30/2022HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
06/30/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
06/30/2022Maintenance informationMUZAFFAR JAMALenergy_progress
06/30/2022HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
06/30/2022HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
06/30/2022Electrical energy consumptionMUZAFFAR JAMALenergy_progress
04/13/2021HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
04/13/2021Maintenance informationMUZAFFAR JAMALenergy_progress
04/13/2021HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
04/13/2021HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
04/13/2021Electrical energy consumptionMUZAFFAR JAMALenergy_progress
04/13/2021Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026Q00374900-P2Request digital key ↗
08/15/2026Q00374900-I1Request digital key ↗
08/15/2026Q00374900-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/29/2026Q00408800-P1Request digital key ↗
08/29/2026Q00408800-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026Q01135731-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
10/02/2023440611615Open ↗
09/08/2023440611615Open ↗
01/21/2022440611615Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION4
01/07/2021440611615Open ↗
01/07/2021440611615Open ↗
01/07/2021440611615Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/22/2022440611615Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
08/07/2023440611615Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/27/2020440611615Open ↗
▸BISZONING DIAGRAM1
10/29/2020440611615Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026Q01135731-I1Open ↗
09/01/2026Q01135731-I1Open ↗
09/01/2026Q00374900-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026Q00408800-I1Open ↗
08/29/2026Q00408800-P1Open ↗
08/21/2026Q01135731-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01135731-I1Open ↗
09/01/2026Q00374900-I1Open ↗
08/24/2026Q00374900-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/09/2020440611615Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/27/2020440611615Open ↗
▸Trade Schedules & Equipment3
▸BISHEATING SYSTEMS1
07/14/2023440611615Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/22/2023440611615Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/22/2023440611615Open ↗
▸Safety & Tenant Protection7
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
01/07/2021440611615Open ↗
12/23/2020440611615Open ↗
▸BISSTREET TREES SITE PLAN1
08/07/2023440611615Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
07/14/2023440611615Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/07/2021440611615Open ↗
▸BISSTREET TREE CHECKLIST1
10/27/2020440611615Open ↗
▸BISSTREET TREE SIGNOFF1
08/07/2023440611615Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01135731-I1Open ↗
08/13/2026Q00374900-P2Open ↗
08/13/2026Q00374900-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/09/2020440611615Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/27/2020440611615Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/22/2023440611615Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/22/2023440611615Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/22/2023440611615Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/22/2023440611615Open ↗
▸BISFENESTRATION AREAS1
03/22/2023440611615Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/27/2020440611615Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/22/2023440611615Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/22/2023440611615Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/14/2023440611615Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/22/2023440611615Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/07/2021440611615Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00374900-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/23/2020440611615Open ↗
10/27/2020440611615Open ↗
10/27/2020440611615Open ↗
Showing 3 of 4 on file for this type
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
07/14/2023440611615Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/14/2023440611615Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/14/2023440611615Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/14/2023440611615Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/14/2023440611615Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/14/2023440611615Open ↗
▸BISMASONRY1
07/14/2023440611615Open ↗
▸BISSOIL REPORT1
10/09/2020440611615Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/27/2020440611615Open ↗
▸BISMECHANICAL SYSTEMS1
07/14/2023440611615Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
02/08/2024440611615Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/09/2020440611615Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
10/09/2020440611615Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01135731-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/09/2020440611615Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/22/2023440611615Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
10/04/2023440611615Open ↗
05/17/2023440611615Open ↗
03/15/2022440611615Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
01/07/2021440611615Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/09/2020440611615Open ↗
▸Other Documents6
▸BISSHUTOFF DAMPERS1
03/22/2023440611615Open ↗
▸BISWOOD - METAL-PLATE-CONNECTED TRUSSES1
07/14/2023440611615Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/09/2020440611615Open ↗
▸BISMAINTENANCE INFORMATION1
03/22/2023440611615Open ↗
▸BISVIOLATIONS SEARCH1
08/07/2023440611615Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/22/2023440611615Open ↗