← Back
Primarily 2 family with 1 store or office
MACE STREET
STATEN ISLAND · BIN 5175593
💬 Discuss this project
2024Year Built
3Stories
S2Building Class
R1-2Zoning
3,325 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · Owner of record: DAQUILASIGONA LLC · 4,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionCivil
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONELLO ENTERPRISES2707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT407/31/2024
A TECH ENGINEERING NYC, PLLC.204/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS803/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONELLO ENTERPRISES INCGeneral Contractor507/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
DV PLUMBING INCPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738304/25/2024
Building Lifecycle
All (63)Filed (6)Permit Issued (8)Signed Off (4)Inspection (13)Objection (2)Special Inspection (30)
09/03/2024
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-S1
08/26/2024
Signed off — Alteration
S00946635-I1
08/26/2024
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-S3
08/26/2024
Signed off — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-S4
08/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/02/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/31/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-P1
07/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2024
Permit issued — Curb Cut
S00896946-S4-CC
07/10/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-S4
06/13/2024
Permit issued — Mechanical Systems
S00896946-S3-MS
04/25/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-S3
04/22/2024
Special inspection requirement — Mechanical Systems
anthony santoro
04/22/2024
Special inspection requirement — Final
anthony santoro
03/26/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/22/2024
Permit issued — Plumbing
S00946635-I1-PL
03/22/2024
Permit issued — Plumbing
S00946635-I1-EW-SP
03/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/18/2024
Permit issued — Plumbing
S57571734-S1-PL
03/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/01/2024
Permit issued — Plumbing
S00896946-S1-PL
02/23/2024
Filed — Alteration
S00946635-I1
12/29/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/14/2023
Permit issued — Plumbing
S00896946-S1-PL
12/11/2023
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-S1
11/13/2023
Permit issued — Earth Work
S00896946-I1-GC-CX
10/16/2023
Objection resolved — Addressed
10/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/16/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
10/16/2023
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
10/16/2023
Special inspection requirement — Structural Steel - Welding
anthony santoro
08/15/2023
Objection raised — Scope
07/24/2023
Filed — New Building
PROPOSED INSTALLATION OF NEW 9' CURB CUT FOR SEMI-DETACHED MIXED USE BUILDING COMBINED WITH ADJACENT CURB CUT TOTALLING 18'
S00896946-I1
07/24/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
07/24/2023
Special inspection requirement — Masonry
anthony santoro
07/24/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
07/24/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
07/24/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
07/24/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
anthony santoro
07/24/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
07/24/2023
Special inspection requirement — Maintenance information
anthony santoro
07/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
07/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
07/24/2023
Special inspection requirement — Air barrier — testing
anthony santoro
07/24/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
07/24/2023
Special inspection requirement — Lighting controls
anthony santoro
07/24/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
07/24/2023
Special inspection requirement — Exterior lighting power
anthony santoro
07/24/2023
Special inspection requirement — Lighting in dwelling units
anthony santoro
07/24/2023
Special inspection requirement — Lowest Floor Elevation
anthony santoro
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
07/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
07/24/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMONELLO ENTERPRISES INC07/16/2024
DOB NOWMechanical SystemsSigned-offMONELLO ENTERPRISES INC06/13/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/22/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP03/22/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC03/18/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/01/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/14/2023
DOB NOWEarth WorkPermit IssuedMONELLO ENTERPRISES INC11/13/2023
1 project · most recent 07/31/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2024Signed-offMONELLO ENTERPRISES INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Rheem Rheem, RA13NZ36AJ1NA 3 tons · Condensing Unit ×3
Heating
Rheem Rheem , RCFZ3617STANMC 75,000 BTU · Furnace ×3
Ventilation
Aprilaire Aprilaire, Model# 8120X 318 CFM · Erv ×3
1 project · most recent 07/31/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/31/2024Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 02/15/2024
General Wiring
FiledStatusContractorScope
02/15/2024CompleteK-10 ELECTRIC CORPGeneral Wiring
1 project · most recent 07/31/2024
Concrete Masonry Wood
FiledStatusContractorScope
07/31/2024Signed-offMONELLO ENTERPRISES INCConcrete, Masonry, Wood
1 project · most recent 07/31/2024
Earthwork
FiledStatusContractorScope
07/31/2024Signed-offMONELLO ENTERPRISES INCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
08/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2024Pass-Final PL - UndergroundPassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/26/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/22/2024Mechanical Systemsanthony santorospecial
04/22/2024Finalanthony santoroprogress
10/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
10/16/2023Structural Steel - Detailsanthony santorospecial
10/16/2023Structural Steel - High Strength Boltinganthony santorospecial
10/16/2023Structural Steel - Weldinganthony santorospecial
07/24/2023Insulation placement and R valuesanthony santoroenergy_progress
07/24/2023Masonryanthony santorospecial
07/24/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
07/24/2023Concrete - Cast-In-Placeanthony santorospecial
07/24/2023Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
07/24/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
07/24/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)anthony santorospecial
07/24/2023Subgrade Inspectionsanthony santorospecial
07/24/2023Maintenance informationanthony santoroenergy_progress
07/24/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
07/24/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
07/24/2023Air barrier — testing anthony santoroenergy_progress
07/24/2023Fenestration air leakageanthony santoroenergy_progress
07/24/2023Lighting controlsanthony santoroenergy_progress
07/24/2023Ventilation and air distribution systemanthony santoroenergy_progress
07/24/2023Exterior lighting poweranthony santoroenergy_progress
07/24/2023Lighting in dwelling unitsanthony santoroenergy_progress
07/24/2023Lowest Floor Elevationanthony santoroprogress
07/24/2023Energy Code Compliance Inspectionsanthony santoroprogress
Latest 25 of 38.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026S00946635-I1Request digital key ↗
08/21/2026S00896946-P1Request digital key ↗
08/21/2026S00896946-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00896946-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00896946-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00896946-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026S00946635-I1Open ↗
08/13/2026S00896946-P1Open ↗
08/13/2026S00896946-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00896946-I1Open ↗
09/01/2026S00896946-I1Open ↗
09/01/2026S00896946-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S00896946-I1Open ↗
09/01/2026S00896946-I1Open ↗
09/01/2026S00896946-S3Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00896946-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00896946-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00896946-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00896946-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00896946-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00896946-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00896946-I1Open ↗
▸Other Documents7
▸DOB NOWFlood Plan Emergency Temporary Flood Shields2
08/21/2026S00896946-I1Open ↗
08/15/2026S00896946-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00896946-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S00896946-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00896946-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00896946-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00896946-I1Open ↗