← Back
Predominantly retail with other uses
23 CLEVELAND PLACE
MANHATTAN · SoHo-Little Italy-Hudson Square · BIN 1084760
💬 Discuss this project
1900Year Built
3Stories
K4Building Class
C6-2Zoning
3,000 sfGross Floor Area
1Units
Rent Stabilized21 Open Violations 13 unresolved · 8 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: KENMARE SQUARE 23 LLC · 2,561 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 6 docs
Floor 1
Cellar9p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASA GROUP1104/09/2026
SKY HIGH GROUP1003/22/2026
KENMARE SQUARE 23 LLC1203/22/2026
KENMARE SANARE 23 LLC103/22/2026
SPRING SCEFFELDING LLC103/22/2026
VENMARE SQUARE LLC103/22/2026
KENMARE SQUARE LLC503/22/2026
SKYLIGHTS GROUP LLC103/22/2026
23 CLEVELAND PLACE503/22/2026
OWNER OF 23 CLEVELAND PL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC110/30/2025
PRAMODRAY SHAH, P.E.310/20/2025
DAVID TURNER ARCHITECT PC203/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TASHEED BUILDING CONSULTANTS103/21/2026
CASA GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL DISCENZAElectrical203/21/2026
SKY HIGH GROUP, LLCGeneral Contractor203/21/2026
DISCENZA, MICHAELElectrical203/21/2026
ETHOS PLUMBING CORPPlumbing107/08/2026
T & T ELECTRICAL CORP.Electrical103/22/2026
THEODORE THEODOROPOULOSElectrical103/21/2026
EMCON GROUP INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032110/30/2025
SHAHRISH SHUVO ENGINEERIN8524310/20/2025
Building Lifecycle
All (80)Filed (6)Permit Issued (3)Violation (52)Inspection (2)Objection (10)Special Inspection (7)
12/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2025
Filed — Alteration
FILING FOR COMMERCIAL HOOD INSTALLATION AND RELATED DUCTS TO ROOF AT THE EXISTING COMMERCIAL AT 1ST FLOOR SPACE
M01300784-I1
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/30/2025
Special inspection requirement — Final
Shahrish Shuvo
10/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Permit issued — Plumbing
M01256356-I1-PL
10/20/2025
Filed — Alteration
FIT OUT OF GROUND FLOOR COMMERCIAL SPACE
M01247637-P1
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/15/2025
Special inspection requirement — Final
Shahrish Shuvo
09/11/2025
Permit issued — General Construction
M01247637-I1-GC
07/23/2025
Filed — Alteration
FIT OUT OF GROUND FLOOR COMMERCIAL SPACE
M01247637-I1
07/21/2025
Filed — Alteration
FIT OUT OF GROUND FLOOR COMMERCIAL SPACE
M01256356-I1
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
06/21/2024
Violation issued (FDNY_ORDER, closed)
04/20/2023
Permit issued — General Construction
M00828805-I1-GC
03/21/2023
Filed — Alteration
M00846150-I1
02/21/2023
Objection raised — Other
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Other
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Fire_Protection
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Accessibility
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Structural
02/21/2023
Objection resolved — Addressed
02/15/2023
Filed — Alteration
Modifications to second floor bathroom and kitchen
M00828805-I1
11/02/2022
Violation issued (HPD, closed)
I
07/27/2022
Violation issued (ECB, closed)
Construction
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
10/24/2016
Violation issued (HPD, closed)
I
05/18/2015
Violation issued (ECB, closed)
Construction
05/18/2015
Violation issued (ECB, closed)
Unknown
11/09/2014
Violation issued (ECB, closed)
Construction
11/09/2014
Violation issued (ECB, open)
Unknown
11/09/2014
Violation issued (ECB, closed)
Construction
03/31/2014
Violation issued (ECB, closed)
Construction
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/2013
Violation issued (ECB, open)
Construction
11/25/2013
Violation issued (ECB, open)
Construction
11/01/2013
Violation issued (ECB, closed)
Signs
11/01/2013
Violation issued (ECB, closed)
Signs
11/01/2013
Violation issued (ECB, closed)
Signs
11/01/2013
Violation issued (ECB, closed)
Signs
10/11/2013
Violation issued (ECB, closed)
Construction
09/10/2013
Violation issued (ECB, closed)
Signs
05/09/2012
Violation issued (ECB, closed)
Construction
08/11/2008
Violation issued (ECB, closed)
Construction
08/08/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2008
Violation issued (DOB, closed)
V%-DOB VIOLATION
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2007
Violation issued (ECB, closed)
Public Assembly
09/21/2007
Violation issued (ECB, open)
Construction
08/24/2007
Violation issued (ECB, open)
Construction
08/24/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP10/21/2025
DOB NOWGeneral ConstructionPermit IssuedEMCON GROUP INC09/11/2025
DOB NOWGeneral ConstructionPermit IssuedSKY HIGH GROUP, LLC04/20/2023
BISEQISSUEDSPRING SCAFFOLDING LLC12/01/2015
BISEQISSUEDSPRING SCAFFOLDING LLC12/01/2015
BISEQISSUEDSPRING SCAFFOLDING LLC01/05/2015
BISEQISSUEDSPRING SCAFFOLDING LLC01/02/2015
BISOTISSUEDSKY HIGH GROUP, LLC04/18/2014
BISEQISSUEDSPRING SCAFFOLDING LLC03/28/2014
BISEQISSUEDSPRING SCAFFOLDING LLC03/27/2014
BISOTISSUEDSKY HIGH GROUP, LLC08/09/2012
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.03/28/2012
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.02/07/2012
BISEQISSUEDPERIMETER BRIDGE & SCAFFO03/21/2011
BISEQISSUEDPERIMETER BRIDGE & SCAFFO04/13/2010
BISEQISSUEDPERIMETER BRIDGE & SCAFFO04/06/2009
BIS—ISSUEDSKY HIGH GROUP, LLC01/29/2009
BISOTISSUEDSKY HIGH GROUP, LLC11/26/2008
BISOTISSUEDSKY HIGH GROUP, LLC08/21/2008
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD05/01/2008
BISOTISSUEDSKY HIGH GROUP, LLC07/02/2007
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD06/26/2007
BISOTISSUEDAMERICAN C CONST INC12/04/2002
BISFPISSUEDALLIED FIRE CONTROL06/29/1999
BISPLISSUEDR.E.P. CONSTRUCTION CORP03/24/1999
BISEQISSUEDSALVATORE CALCAGNO CONST.,INC.03/11/1999
BISMHISSUEDSALVATORE CALCAGNO CONST.,INC.03/11/1999
BISPLISSUEDRICHMOND PLG & HTG01/28/1998
BISOTISSUEDSALVATORE CALCAGNO CONST01/08/1998
BISMHISSUEDCONSTUCTION INNOVATION CORP04/24/1996
1 project · most recent 10/30/2025
Ventilation Systems
FiledStatusContractorScope
10/30/2025——Ventilation Systems
1 project · most recent 07/21/2025
Water/Sanitary
FiledStatusContractorScope
07/21/2025Signed-offETHOS PLUMBING CORPWater/Sanitary
2 projects · most recent 09/26/2025
General Wiring
FiledStatusContractorScope
09/26/2025CompleteT & T ELECTRICAL CORP.General Wiring
09/13/2022Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/30/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/30/2025Tenant Protection Plan Compliance—special
10/30/2025FinalShahrish Shuvoprogress
10/15/2025Tenant Protection Plan Compliance—special
10/15/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/15/2025FinalShahrish Shuvoprogress
07/17/2025Tenant Protection Plan ComplianceShahrish Shuvospecial
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026M00846150-I1Request digital key ↗
08/22/2026M01256356-I1Request digital key ↗
08/21/2026M01247637-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION14
01/05/2016140177608Open ↗
12/28/2015140177591Open ↗
01/14/2015140177608Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
03/26/2014140177591Open ↗
03/26/2014140177608Open ↗
10/24/2013121819951Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/06/2017140177591Open ↗
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
05/24/2017140177608Open ↗
04/22/2014121819951Open ↗
10/24/2013121819951Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026M01300784-I1Open ↗
08/13/2026M01247637-I1Open ↗
08/13/2026M00846150-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01247637-I1Open ↗
08/27/2026M01247637-P1Open ↗
08/24/2026M01256356-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/21/2011120636794Open ↗
04/29/2008110142907Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/21/2011120636794Open ↗
04/30/2008110142907Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/26/2014140177591Open ↗
03/26/2014140177608Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/26/2014140177591Open ↗
03/26/2014140177608Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/26/2014140177591Open ↗
03/26/2014140177608Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M01247637-I1Open ↗
08/27/2026M01247637-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026M01300784-I1Open ↗
08/13/2026M01247637-P1Open ↗
08/13/2026M01256356-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/21/2011120636794Open ↗
04/29/2008110142907Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/26/2014140177608Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/16/2008110202593Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/18/2012121071213Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/04/2012121071213Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/26/2014140177591Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/26/2014140177608Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS4
05/14/2012121071213Open ↗
03/21/2011120636794Open ↗
06/16/2008110202593Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER3
12/28/2015140177591Open ↗
01/12/2015140177591Open ↗
02/09/2012120636794Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/06/2017140177591Open ↗
05/24/2017140177608Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/03/2012120636794Open ↗
▸BISSUPERSEDING LETTER1
02/09/2012120636794Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/29/2008110142907Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/24/2013121819951Open ↗
05/14/2012121071213Open ↗
08/21/2008110202593Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
10/24/2013121819951Open ↗
05/14/2012121071213Open ↗
03/21/2011120636794Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/26/2014140177591Open ↗
03/26/2014140177608Open ↗
▸BISADDITIONAL INFORMATION1
11/08/2012121071213Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/26/2014140177591Open ↗
03/26/2014140177608Open ↗