← Back
STATEN ISLAND
23 CUNARD AVENUE
STATEN ISLAND · BIN 5175171
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralCivil
Floor 29p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Basement9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OVER DEVELOPMENT3907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI910/31/2025
ISLAND ENGINEERING ASSOCIATES206/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS603/21/2026
JAMES V MORRI, RA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DOOR TO DOOR REALTY LLCGeneral Contractor907/08/2026
OVER DEVELOPEMENT LTDGeneral Contractor207/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264510/31/2025
Building Lifecycle
All (68)Filed (11)Permit Issued (12)Signed Off (5)Inspection (14)Special Inspection (26)
11/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Lighting controls
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Metering
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Lighting in dwelling units
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
11/06/2025
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
10/31/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-P6
10/28/2025
Signed off — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN.
S00768117-I1
10/15/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-S1
08/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-P5
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-S4
07/16/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-S2
07/16/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-P4
07/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/02/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-P2
06/02/2025
Filed — Alteration
FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN.
S00768117-P1
06/02/2025
Special inspection requirement — Sprinkler Systems
WILLIAM DURDEN, P.E.
06/02/2025
Special inspection requirement — Sprinkler Systems
WILLIAM DURDEN, P.E.
05/23/2025
Permit issued — Curb Cut
S00547807-S4-CC
05/22/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-S4
05/21/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S00547807-S2
05/21/2025
Permit issued — Curb Cut
S00547807-S2-CC
05/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2025
Signed off — Alteration
8 FOOT CONSTRUCTION FENCE FOR SUBDIVSION OF LOTS 254 & 253
S00709228-I1
01/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/24/2024
Permit issued — Construction Fence
S00709228-I1-FN
10/24/2024
Permit issued — Earth Work
S00547807-I1-GC-CX
09/25/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/16/2024
Permit issued — Plumbing
S73459573-S1-PL
06/21/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/13/2024
Permit issued — Sprinklers
S00768117-I1-EW-SP
06/12/2024
Permit issued — Plumbing
S00768117-I1-PL
06/05/2024
Permit issued — Plumbing
S00547807-S1-PL
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDOOR TO DOOR REALTY05/23/2025
DOB NOWCurb CutSigned-offDOOR TO DOOR REALTY05/21/2025
DOB NOWConstruction FenceSigned-offDOOR TO DOOR REALTY10/24/2024
DOB NOWEarth WorkPermit IssuedDOOR TO DOOR REALTY10/24/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/16/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP06/13/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/12/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/05/2024
DOB NOWStructuralPermit IssuedDOOR TO DOOR REALTY09/07/2023
DOB NOWFoundationPermit IssuedDOOR TO DOOR REALTY01/25/2023
DOB NOWGeneral ConstructionPermit IssuedOVER DEVELOPEMENT LTD06/28/2022
DOB NOWConstruction FenceSigned-offOVER DEVELOPEMENT LTD04/07/2022
1 project · most recent 10/31/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/31/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 10/31/2025
Steel Concrete Wood
FiledStatusContractorScope
10/31/2025Signed-offDOOR TO DOOR REALTY LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/25/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/21/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/06/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
11/06/2025Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
11/06/2025Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
11/06/2025Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
11/06/2025Subgrade InspectionsWILLIAM DURDEN, P.E.special
11/06/2025Structural Steel - DetailsWILLIAM DURDEN, P.E.special
11/06/2025Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
11/06/2025Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
11/06/2025Footing and FoundationWILLIAM DURDEN, P.E.progress
11/06/2025Structural Wood FrameWILLIAM DURDEN, P.E.progress
11/06/2025FinalWILLIAM DURDEN, P.E.progress
11/06/2025Permanent certificateWILLIAM DURDEN, P.E.energy_progress
11/06/2025Lighting controlsWILLIAM DURDEN, P.E.energy_progress
11/06/2025Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
11/06/2025HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
11/06/2025Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
11/06/2025Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
11/06/2025Maintenance informationWILLIAM DURDEN, P.E.energy_progress
11/06/2025MeteringWILLIAM DURDEN, P.E.energy_progress
11/06/2025Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
11/06/2025Lighting in dwelling unitsWILLIAM DURDEN, P.E.energy_progress
11/06/2025Fenestration areasWILLIAM DURDEN, P.E.energy_progress
11/06/2025Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
11/06/2025Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
06/02/2025Sprinkler SystemsWILLIAM DURDEN, P.E.special
Latest 25 of 26.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026S00709228-I1Request digital key ↗
08/24/2026S00768117-I1Request digital key ↗
08/24/2026S00768117-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00547807-P2Open ↗
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00547807-P2Open ↗
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S00547807-I1Open ↗
08/13/2026S00547807-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00547807-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026S00768117-P1Open ↗
08/24/2026S00768117-I1Open ↗
08/19/2026S00547807-P6Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026S00768117-I1Open ↗
08/30/2026S00547807-I1Open ↗
08/30/2026S00547807-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026S00547807-I1Open ↗
08/30/2026S00547807-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-P2Open ↗
08/13/2026S00547807-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00547807-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-I1Open ↗
08/13/2026S00547807-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00547807-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00547807-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00547807-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00547807-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00547807-S1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-P2Open ↗
08/13/2026S00547807-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00547807-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00547807-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial3
08/13/2026S00547807-P2Open ↗
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00547807-P6Open ↗
08/13/2026S00547807-I1Open ↗
08/13/2026S00547807-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00547807-I1Open ↗