Elevator apt, semi-fireproof without stores
23 EAST 124 STREET
MANHATTAN · East Harlem (North) · BIN 1054004
💬 Discuss this project
1930Year Built
7Stories
D1Building Class
C4-4AZoning
21,932 sfGross Floor Area
29Units
Rent Stabilized74 Open Violations 72 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · 4,037 sf lot · 5.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Roof19p · 6 filings · 20 docs
Floor 55p · 2 filings · 15 docs
Floor 4
Floor 32p · 1 filing · 7 docs
Floor 2
Floor 13p · 2 filings · 6 docs
Cellar14p · 2 filings · 20 docs
Site & exterior11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STELLAR MANAGEMENT2707/08/2026
BILLY ENTERPRISES907/08/2026
ECTO RESTORATION INC503/22/2026
ONE TWO FOUR MADISON ASSOC403/21/2026
NEW CINGULAR WIRELESS PCS, LLC303/21/2026
242 EAST 14TH STREET JOINT VENT303/21/2026
124 MADISON ASSOCIATES203/21/2026
MADISON ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ATELIER NY ARCHITECTURE208/09/2023
AZIMUTH ENGINEERING601/25/2022
ARQUITECTURA VARELA110/22/2021
SCHERER DESIGN GROUP110/30/2019
TECTONIC ENGINEERING110/11/2018
HAIDER ENGINEERING, P.E.106/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.803/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OVERLAND CONTRACTING INCGeneral Contractor707/08/2026
BILLY ENTERPRISES INCGeneral Contractor707/08/2026
AK PREMIER CONTRACTINGGeneral Contractor303/21/2026
ECTO RESTORATION INCGeneral Contractor203/21/2026
METROPOLITAN WIRELESS*General Contractor207/08/2026
GO PRO PLUMBING AND HEATINGPlumbing107/08/2026
OLIVER CHRISTOPHERElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATELIER NY ARCHITECTURE2438208/09/2023
JEREMY K MCKEON, P.E.7263601/25/2022
TECTONIC ENGINEERING CONS106110/11/2018
Building Lifecycle
All (123)Filed (13)Permit Issued (13)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (8)Objection (2)Special Inspection (8)
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
B
07/27/2026
Violation issued (HPD, open)
C
07/27/2026
Violation issued (HPD, open)
A
07/12/2026
Violation issued (HPD, open)
A
06/27/2026
Violation issued (HPD, open)
B
06/27/2026
Violation issued (HPD, open)
C
06/27/2026
Violation issued (HPD, open)
B
06/27/2026
Violation issued (HPD, open)
C
06/27/2026
Violation issued (HPD, open)
B
06/24/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01297424-I1
06/03/2026
Violation issued (HPD, open)
B
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, open)
C
04/22/2026
Violation issued (HPD, open)
C
03/16/2026
Violation issued (HPD, open)
B
03/16/2026
Violation issued (HPD, open)
B
03/16/2026
Violation issued (HPD, closed)
A
03/16/2026
Violation issued (HPD, open)
B
03/16/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, closed)
A
03/11/2026
Violation issued (HPD, open)
B
01/13/2026
Violation issued (HPD, closed)
C
01/13/2026
Violation issued (HPD, closed)
B
01/13/2026
Violation issued (HPD, open)
C
01/13/2026
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (HPD, closed)
C
11/01/2025
Violation issued (HPD, open)
B
11/01/2025
Violation issued (HPD, open)
A
11/01/2025
Violation issued (HPD, open)
A
11/01/2025
Violation issued (HPD, closed)
A
11/01/2025
Violation issued (HPD, open)
B
11/01/2025
Violation issued (HPD, open)
B
10/30/2025
Permit issued — Suspended Scaffold
M01297424-I1-SC
10/27/2025
Violation issued (HPD, closed)
C
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, open)
C
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, closed)
A
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, open)
B
10/27/2025
Violation issued (HPD, open)
C
10/23/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01297424-I1
10/21/2025
Violation issued (HPD, open)
A
10/19/2025
Violation issued (HPD, closed)
C
10/19/2025
Violation issued (HPD, open)
A
10/19/2025
Violation issued (HPD, open)
B
10/19/2025
Violation issued (HPD, open)
C
10/19/2025
Violation issued (HPD, open)
B
10/18/2025
Violation issued (HPD, open)
C
10/18/2025
Violation issued (HPD, open)
C
10/16/2025
Violation issued (HPD, open)
C
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM10/30/2025
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC11/14/2023
DOB NOWGeneral ConstructionPermit IssuedAK PREMIER CONTRACTORS09/18/2023
DOB NOWSupported ScaffoldPermit IssuedECTO RESTORATION INC10/25/2021
DOB NOWMechanical SystemsSigned-offOVERLAND CONTRACTING INC09/10/2021
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI09/10/2021
DOB NOWGeneral ConstructionSigned-offOVERLAND CONTRACTING INC09/09/2021
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC03/27/2020
DOB NOWAntennaSigned-offMETROPOLITAN WIRELESS*03/18/2019
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC01/11/2019
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC11/20/2018
DOB NOWAntennaSigned-offMETROPOLITAN WIRELESS*10/22/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC06/07/2018
BISPLISSUEDP.S.I. MECHANICAL08/31/2018
BISOTISSUEDAGO & ALAUDIN GENERAL CON07/16/2018
BISOTISSUEDTITAN CONSTRUCTION SERVIC04/12/2017
BISOTISSUEDTITAN CONSTRUCTION SERVIC03/24/2017
BISEQISSUEDBILLY ENTERPRISES INC01/20/2017
BISOTISSUEDBECHTEL INFRASTRUCTURE AN08/03/2016
BISOTISSUEDAGO & ALAUDIN GENERAL CON05/16/2016
BISOTISSUEDBECHTEL INFRASTRUCTURE AN03/24/2016
BISOTISSUEDAGO & ALAUDIN GENERAL CON10/10/2015
BISMHISSUEDWIRELESS NETWORK GROUP IN10/09/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC07/01/2015
BISOTISSUEDTELCOM ENGINEERING GP INC08/15/2013
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/04/2011
BISOTISSUEDBCI COMMUNICATIONS INC03/24/2009
BISOTISSUEDTHE CABLE MAN, INC12/22/2008
BISOTISSUEDTRI BORO WATERPROOFING IN10/16/2006
BISOTISSUEDGFJ CONSTRUCTION CORP.DBA BU.GRR10/04/2001
BISOTISSUEDSAJID WATERPROOFING CO06/29/2000
BISEQISSUEDJERRICK WATERPROFFING CO INC03/01/2000
BISOTISSUEDCELLULAR TELEPHONE CO DBA AT&T W04/02/1998
1 project · most recent 08/09/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/09/2023Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
3 projects · most recent 10/05/2023
General Wiring
FiledStatusContractorScope
10/05/2023Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
04/26/2023CompleteELMAC ELECTRIC INC.General Wiring
06/06/2018CompleteWCK ELECTRIC CORP.—
1 project · most recent 10/22/2021
Scaffold
FiledStatusContractorScope
10/22/2021Permit IssuedECTO RESTORATION INCScaffold
1 project · most recent 10/23/2025
FiledStatusContractorScope
10/23/2025Signed-offSTRUCTUAL PRESV SYSTEM—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/08/2023Tenant Protection Plan ComplianceAnatole Plotkinspecial
01/21/2022Air barrier - visual inspectionJeremy McKeonenergy_progress
01/21/2022Fire-Resistant Penetrations and JointsJeremy McKeonspecial
12/03/2021Post-installed AnchorsJeremy McKeonspecial
12/03/2021FinalJeremy McKeonprogress
05/13/2021Mechanical SystemsJeremy McKeonspecial
05/13/2021FinalJeremy McKeonprogress
05/30/2018FinalJAFAR HAIDERprogress
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
09/06/2026M00048752-I1Request digital key ↗
09/06/2026M00001121-I1Request digital key ↗
09/03/2026M00522035-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00208590-I1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION19
04/27/2020123464875Open ↗
09/10/2018123464875Open ↗
07/12/2018140783917Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION17
08/31/2018140783917Open ↗
07/12/2018140783917Open ↗
04/20/2017122876842Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications59
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
09/10/2018123464875Open ↗
07/18/2018122876842Open ↗
01/09/2017122719549Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00208590-I1Open ↗
09/03/2026M00522050-P1Open ↗
09/03/2026M00522050-I1Open ↗
Showing 3 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/12/2018140783917Open ↗
01/17/2017140594079Open ↗
05/04/2016140491073Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/12/2018140783917Open ↗
01/17/2017140594079Open ↗
05/04/2016140491073Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/12/2018140783917Open ↗
01/17/2017140594079Open ↗
05/04/2016140491073Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00522035-I1Open ↗
08/31/2026M00048752-I1Open ↗
08/25/2026M00522060-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00916289-S1Open ↗
09/01/2026M00522035-I1Open ↗
08/25/2026M00522060-P1Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA2
04/19/2016122282270Open ↗
07/24/2013121454782Open ↗
▸BISSCHEDULE B - PLUMBING1
07/12/2018140783917Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes7
04/24/2020123464875Open ↗
08/30/2016122876842Open ↗
05/04/2016122719549Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan1
08/15/2026M00208590-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00522050-I1Open ↗
09/03/2026M00522050-P1Open ↗
09/03/2026M00522050-P2Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
07/12/2018140783917Open ↗
05/04/2016140491073Open ↗
05/04/2016122719549Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
11/19/2010120534252Open ↗
06/14/2010120372809Open ↗
06/14/2010120372809Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
04/04/2017122876842Open ↗
04/04/2017122876842Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
09/10/2018123464875Open ↗
07/18/2018122876842Open ↗
01/09/2017122719549Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/18/2018122876842Open ↗
01/09/2017122719549Open ↗
11/01/2016140491073Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/12/2018140783917Open ↗
05/04/2016140491073Open ↗
10/08/2015140413050Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/12/2018140783917Open ↗
10/08/2015140413050Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/25/2013121454782Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00522060-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/12/2018140783917Open ↗
01/17/2017140594079Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/18/2018122876842Open ↗
01/09/2017122719549Open ↗
11/01/2016140491073Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/13/2012121454782Open ↗
11/19/2010120534252Open ↗
06/08/2010120372809Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/09/2017122719549Open ↗
08/17/2016122282270Open ↗
12/26/2012120534252Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT31
04/24/2020123464875Open ↗
09/10/2018123464875Open ↗
07/18/2018122876842Open ↗
Showing 3 of 31 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
07/12/2018140783917Open ↗
05/04/2016140491073Open ↗
10/08/2015140413050Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION6
04/24/2020123464875Open ↗
04/24/2020123464875Open ↗
04/04/2017122876842Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET6
09/10/2018123464875Open ↗
09/29/2016122876842Open ↗
08/30/2016122876842Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/12/2018140783917Open ↗
01/17/2017140594079Open ↗
05/04/2016140491073Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
04/27/2020123464875Open ↗
07/18/2018122876842Open ↗
▸Other Documents11
▸DOB NOWDHCR Document6
09/03/2026M00522060-I1Open ↗
09/03/2026M00522060-P1Open ↗
08/13/2026M00522050-P1Open ↗
Showing 3 of 6 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
01/17/2017140594079Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/04/2017122876842Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/29/2009110475600Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01297424-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00048752-I1Open ↗