← Back
General warehouse
23 MESEROLE AVENUE
BROOKLYN · Greenpoint · BIN 3065252
💬 Discuss this project
1931Year Built
2Stories
E1Building Class
M1-1Zoning
10,500 sfGross Floor Area
1Units
General warehouse · Owner of record: FRANKLIN MESEROLE REALTY CORP · 7,500 sf lot · 1.4 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRANKLIN MESEROLE REALTY CORP503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC104/17/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506104/17/2023
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Inspection (2)Special Inspection (5)
09/13/2024
Signed off — Alteration
INSTALLATION OF NEW HANGER GAS FURNACE FOR EXISTING WAREHOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00860859-I1
06/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/25/2023
Permit issued — Plumbing
B00860859-I1-PL
04/17/2023
Filed — Alteration
INSTALLATION OF NEW HANGER GAS FURNACE FOR EXISTING WAREHOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00860859-I1
04/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/17/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
04/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/25/2023
1 project · most recent 02/15/2018
General Wiring
FiledStatusContractorScope
02/15/2018CompleteRIGHT AWAY ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/17/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
04/17/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
04/17/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
04/17/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
04/17/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026B00860859-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00860859-I1Open ↗
08/29/2026B00860859-I1Open ↗
08/29/2026B00860859-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00860859-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B00860859-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00860859-I1Open ↗