← Back
BuildNYC
One family attached or semi-detached
23 MIAMI COURT
BROOKLYN · BIN 3106709
💬 Discuss this project
1930Year Built
2Stories
A5Building Class
R6Zoning
1,024 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 1,158 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed garage wall layout and roof framing1p · 1 filing · 16 docs
Floor 2Boiler and domestic water and gas piping replacement10p · 2 filings · 20 docs
Floor 1Boiler and domestic water and gas piping replacement17p · 3 filings · 20 docs
CellarBoiler and domestic water and gas piping replacement10p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2020$757K—Private party → Private party$739/sf building
07/21/2014$429K—Private party → Private party$419/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company202/10/2025
Tal Iris Shemesh, Architect201/11/2023
Robert Siqeca PE102/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XYZ Code Consulting303/21/2026
New York & Company403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rogo BuildersGeneral Contractor707/08/2026
P.H. WorksPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. International Engineering3129101/11/2023
Building Lifecycle
02/28/2025
Signed off — Alteration
REPLACE BOILER AND DOMESTIC WATER AND GAS FIXTURES. REPLACE WATER AND GAS PIPING. CAP/REMOVE GAS RANGE ON 1ST FLOOR.
B00993786-I1
02/11/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
02/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offP.H. Works02/12/2024
1 project · most recent 02/21/2022
Steel
FiledStatusContractorScope
02/21/2022——Steel
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
02/11/2025Maintenance informationLOUIS ARENAenergy_progress
02/11/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/11/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
02/11/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/29/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
01/29/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/29/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/29/2025Maintenance informationLOUIS ARENAenergy_progress
01/04/2023Structural Cold-Formed SteelNANIK MASSANDspecial
01/04/2023MasonryNANIK MASSANDspecial
01/04/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
01/04/2023Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
01/04/2023Concrete - Cast-In-PlaceNANIK MASSANDspecial
01/04/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
01/04/2023Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
01/04/2023Structural Steel - WeldingNANIK MASSANDspecial
01/04/2023UnderpinningNANIK MASSANDspecial
01/04/2023Structural Steel - High Strength BoltingNANIK MASSANDspecial
01/04/2023Structural Steel - DetailsNANIK MASSANDspecial
01/04/2023Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
12/13/2022Footing and FoundationNANIK MASSANDprogress
12/13/2022FinalKevin McCrayprogress
12/29/2021Structural Steel - Welding—special
12/29/2021Structural Steel - High Strength Bolting—special
12/29/2021Structural Steel - Details—special
Latest 25 of 40.
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account