← Back
One family attached or semi-detached
23 MIAMI COURT
BROOKLYN · Prospect Lefferts Gardens-Wingate · BIN 3429529
💬 Discuss this project
1930Year Built
2Stories
A5Building Class
R6Zoning
1,024 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,158 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 16 docs
Floor 14p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2020$757K—Private party → Private party$739/sf building
07/21/2014$429K—Private party → Private party$419/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAL IRIS SHEMESH ,ARCHITECT101/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROGO BUILDERS INCGeneral Contractor707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129101/11/2023
Building Lifecycle
All (23)Filed (1)Permit Issued (3)Signed Off (1)Objection (4)Special Inspection (14)
08/29/2023
Signed off — Alteration
Proposed elaragement of existing attached garage. No change in occupancy use or egress.
B08054085-I1
08/29/2023
Permit issued — General Construction
B08054085-I1-FO
08/28/2023
Permit issued — Structural
B08054085-I1-ST
04/29/2023
Permit issued — Structural
B08054085-I1-GC
03/01/2023
Objection raised — Other
03/01/2023
Objection resolved — Addressed
01/24/2023
Objection raised — Other
01/24/2023
Objection resolved — Addressed
01/11/2023
Filed — Alteration
Proposed elaragement of existing attached garage. No change in occupancy use or egress.
B08054085-I1
01/04/2023
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
01/04/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
01/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
01/04/2023
Special inspection requirement — Masonry
NANIK MASSAND
01/04/2023
Special inspection requirement — Structural Cold-Formed Steel
NANIK MASSAND
01/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
01/04/2023
Special inspection requirement — Structural Steel - Details
NANIK MASSAND
01/04/2023
Special inspection requirement — Structural Steel - High Strength Bolting
NANIK MASSAND
01/04/2023
Special inspection requirement — Structural Steel - Welding
NANIK MASSAND
01/04/2023
Special inspection requirement — Underpinning
NANIK MASSAND
01/04/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
01/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
12/13/2022
Special inspection requirement — Final
Kevin McCray
12/13/2022
Special inspection requirement — Footing and Foundation
NANIK MASSAND
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROGO BUILDERS INC08/29/2023
DOB NOWStructuralSigned-offROGO BUILDERS INC08/28/2023
DOB NOWStructuralSigned-offROGO BUILDERS INC04/29/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/04/2023Concrete - Cast-In-PlaceNANIK MASSANDspecial
01/04/2023Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
01/04/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
01/04/2023MasonryNANIK MASSANDspecial
01/04/2023Structural Cold-Formed SteelNANIK MASSANDspecial
01/04/2023Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
01/04/2023Structural Steel - DetailsNANIK MASSANDspecial
01/04/2023Structural Steel - High Strength BoltingNANIK MASSANDspecial
01/04/2023Structural Steel - WeldingNANIK MASSANDspecial
01/04/2023UnderpinningNANIK MASSANDspecial
01/04/2023Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
01/04/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
12/13/2022FinalKevin McCrayprogress
12/13/2022Footing and FoundationNANIK MASSANDprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B08054085-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B08054085-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B08054085-I1Open ↗
08/25/2026B08054085-I1Open ↗
08/25/2026B08054085-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B08054085-I1Open ↗
08/25/2026B08054085-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B08054085-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B08054085-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08054085-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B08054085-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B08054085-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B08054085-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B08054085-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B08054085-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B08054085-I1Open ↗