← Back
Walk-up apt, over six families with stores
23 MONROE STREET
MANHATTAN · BIN 1003294
💬 Discuss this project
1915Year Built
5Stories
C7Building Class
R7-2Zoning
9,575 sfGross Floor Area
20Units
Rent Stabilized22 Open Violations 20 unresolved · 2 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 23 MONROE STREET INC. · 2,537 sf lot · 3.77 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
23 MONROE ST403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC512/30/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEMAR MECHANICAL INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746512/30/2024
Building Lifecycle
All (97)Filed (5)Permit Issued (3)Signed Off (3)Violation (60)Inspection (4)Special Inspection (22)
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, closed)
A
03/05/2025
Violation issued (HPD, open)
B
03/05/2025
Violation issued (HPD, closed)
C
03/05/2025
Violation issued (HPD, open)
B
02/20/2025
Signed off — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-S1
02/20/2025
Signed off — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-I1
01/30/2025
Signed off — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-S2
01/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/02/2025
Permit issued — Boiler Equipment
M00989042-S2-BE
12/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/31/2024
Special inspection requirement — Maintenance information
Stephen Shishko
12/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
12/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/31/2024
Special inspection requirement — Maintenance information
Stephen Shishko
12/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/30/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-S2
12/30/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-P2
12/30/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-P1
12/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
12/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/20/2024
Special inspection requirement — Maintenance information
Stephen Shishko
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/20/2024
Special inspection requirement — Maintenance information
Stephen Shishko
12/19/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/01/2024
Violation issued (HPD, closed)
A
02/14/2024
Violation issued (HPD, closed)
C
02/14/2024
Violation issued (HPD, open)
A
02/14/2024
Violation issued (HPD, closed)
C
01/23/2024
Permit issued — Plumbing
M00989042-S1-PL
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
B
01/23/2024
Violation issued (HPD, closed)
B
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, open)
C
01/23/2024
Violation issued (HPD, closed)
C
01/23/2024
Violation issued (HPD, closed)
B
01/23/2024
Violation issued (HPD, closed)
B
01/23/2024
Violation issued (HPD, open)
C
01/19/2024
Permit issued — Boiler Equipment
M00989042-I1-BE
01/16/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-S1
01/16/2024
Filed — Alteration
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00989042-I1
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
C
01/16/2024
Violation issued (HPD, closed)
C
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC01/02/2025
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC01/23/2024
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC01/19/2024
BISBLISSUEDMPS PLUMBING & HEATING INC06/14/2017
BISPLISSUEDMPS PLUMBING & HEATING INC06/14/2017
BISPLISSUEDPRONTO PLMB. & HTNG CORP11/23/1992
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/19/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/31/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/31/2024Maintenance informationStephen Shishkoenergy_progress
12/31/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/31/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
12/31/2024Tenant Protection Plan ComplianceStephen Shishkospecial
12/31/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/31/2024Maintenance informationStephen Shishkoenergy_progress
12/31/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/31/2024Tenant Protection Plan ComplianceStephen Shishkospecial
12/30/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/30/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
12/30/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/20/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/20/2024Tenant Protection Plan ComplianceStephen Shishkospecial
12/20/2024Maintenance informationStephen Shishkoenergy_progress
12/20/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/20/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
12/20/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/20/2024Tenant Protection Plan ComplianceStephen Shishkospecial
12/20/2024Tenant Protection Plan ComplianceStephen Shishkospecial
12/20/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/20/2024Maintenance informationStephen Shishkoenergy_progress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026M00989042-P2Request digital key ↗
08/28/2026M00989042-P1Request digital key ↗
08/28/2026M00989042-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION7
12/04/2023123077384Open ↗
04/23/2018123077384Open ↗
04/17/2018123077384Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M00989042-S2Open ↗
09/23/2026M00989042-S2Open ↗
09/23/2026M00989042-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026M00989042-P2Open ↗
08/28/2026M00989042-P1Open ↗
08/28/2026M00989042-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M00989042-I1Open ↗
09/23/2026M00989042-S2Open ↗
08/26/2026M00989042-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/07/2017123077384Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/07/2017123077384Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/07/2017123077384Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/07/2017123077384Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/07/2017123077384Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026M00989042-P2Open ↗
08/28/2026M00989042-P1Open ↗
08/28/2026M00989042-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/07/2017123077384Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00989042-I1Open ↗
08/13/2026M00989042-S1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/07/2017123077384Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/07/2017123077384Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM4
04/17/2018123077384Open ↗
04/10/2018123077384Open ↗
11/28/2017123077384Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
06/07/2017123077384Open ↗
▸BISADDITIONAL INFORMATION1
04/25/2018123077384Open ↗