DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB01/17/2020VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB08/20/2016STOP ALL WORK EXCEPT MAKE SITE SAFE CONTACT BKLYN BOROUGH COMMISSIONER 718 802-3676
DOB06/19/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB05/07/2015PERMIT HOLDER FAIL TO PROVIDE ACCESS AND/OR EXPOSE WORK ON ACTIVE SITEAT TIME OF INSPECTION OF 4STY BUILDING UNDER CONSTRUCTION.CONSTRUCTIONFENCE LOCKED FROM INSIDE AND OBSERVED UNKNOWN MADE ADJUSTING LOCK FROMNothing owed — awaiting certificate of correction
ECB03/28/2013FAILURE TO MAINTAIN/INSTITUTE SAFETY EQUIPMENT MEASURES - NO HANDRAILS. NOTED: BLDG ERECTED TO 4 STYS UNDER JOB #320398887-NB W/NO HANDRAILSTO CELLAR, 3RD FLR TO ROOF ON ACTIVE CONSTRUCTION SITE. ALSO NOTED ADJNothing owed — awaiting certificate of correction