← Back
Home for indigent children, aged, homeless
23 WEST 106 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055652
💬 Discuss this project
1900Year Built
5Stories
N2Building Class
R8Zoning
12,900 sfGross Floor Area
16Units
1 Open Violation ▸
Home for indigent children, aged, homeless · Owner of record: WEST 106TH STREET OWNER 1 LLC · 3,028 sf lot · 4.26 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof23p · 4 filings · 20 docs
Floor 520p · 5 filings · 20 docs
Floor 416p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 225p · 5 filings · 20 docs
Floor 120p · 4 filings · 20 docs
Cellar23p · 4 filings · 20 docs
Basement21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIBERTY ONE CONSTRUCTION, LLC5008/29/2026
WEST 106TH STREET OWNER 1 LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGE E. BERGER & ASSOC.903/18/2026
MILTIADIS LEPTOURGOS, PE1007/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIBERTY ONE CONSTRUCTIONGeneral Contractor1107/08/2026
SAMUEL PALACEElectrical103/21/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE5081903/18/2026
Building Lifecycle
All (111)Filed (19)Permit Issued (7)Signed Off (5)Violation (27)Inspection (11)Objection (12)Special Inspection (30)
03/18/2026
Filed — Alteration CO
Int. Reno, Amend Cof O to increase the occ load & modify Occ Class from Institutional ZUG I-3 to I-1, occ of bldg are no longer under restraint/security & capable of self-preservation & responding to emergency situations w/o physical assistance from staff
M01050419-P6
03/17/2026
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
03/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2026
Violation issued (ECB, closed)
Boilers
02/20/2026
Violation issued (ECB, closed)
Elevators
12/30/2025
Signed off — Alteration
M01240403-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2025
Permit issued — Mechanical Systems
M01240403-I1-MS
07/31/2025
Filed — Alteration
M01240403-I1
05/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/01/2025
Filed — Alteration CO
Int. Reno, Amend Cof O to increase the occ load & modify Occ Class from Institutional ZUG I-3 to I-1, occ of bldg are no longer under restraint/security & capable of self-preservation & responding to emergency situations w/o physical assistance from staff
M01050419-P5
03/25/2025
Filed — Alteration CO
Int. Reno, Amend Cof O to increase the occ load & modify Occ Class from Institutional ZUG I-3 to I-1, occ of bldg are no longer under restraint/security & capable of self-preservation & responding to emergency situations w/o physical assistance from staff
M01050419-P4
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
02/04/2025
Filed — Alteration CO
Int. Reno, Amend Cof O to increase the occ load & modify Occ Class from Institutional ZUG I-3 to I-1, occ of bldg are no longer under restraint/security & capable of self-preservation & responding to emergency situations w/o physical assistance from staff
M01050419-P3
01/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
01/27/2025
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
01/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
01/06/2025
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES & PIPING SYSTEM THROUGHOUT THE 2ND FLOOR THRU 5TH FLOOR SPACES AS PER PLANS. OBTAIN PL PERMIT. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE ALTERATION JOB #: M07999563 (OT/GC) BY GEORGE E. BERGER & ASSOCIATES.
M08042516-I1
12/27/2024
Signed off — Alteration
MODIFY EXISTING SPRINKLER SYSTEM BY RELOCATING, REPLACING OR INSTALLING NEW SPRINKLERS AT BASEMENT, 1ST & 2nd TO 5TH FLOORS AS PER PLANS. OBTAIN SP PERMIT. UTILIZE EXISTING SPRINKLER SYSTEM AS PER DOB ALT-2, BIS # 100148920, APPROVED (3-07-91) & PERMITTED
M08042536-I1
12/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/02/2024
Signed off — Alteration
Replace existing supply grilles/fan coil units (heating/cooling) with new ones to new locations. Install 2 new ERVs at Roof, FA supply & return ducts, all as per plans. Cooling & heating supply systems for the building to remain-to be supplied by exist.
M08042545-I1
12/02/2024
Signed off — Alteration
Renovation of existing non-profit w/sleeping accommodations; remove non-load bearing partitions and install new non-load bearing partitions & finishes; and install new ADA bathrooms. MH & PL filed separately. No change in use, egress or occupancy
M07999563-I1
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
11/27/2024
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES & PIPING SYSTEM THROUGHOUT THE 2ND FLOOR THRU 5TH FLOOR SPACES AS PER PLANS. OBTAIN PL PERMIT. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE ALTERATION JOB #: M07999563 (OT/GC) BY GEORGE E. BERGER & ASSOCIATES.
M08042516-P3
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Mechanical Systems
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Final
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Maintenance information
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Duct leakage testing, insulation and design
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Ventilation and air distribution system
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — Shutoff dampers
Miltiadis Leptourgos
11/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
Miltiadis Leptourgos
11/22/2024
Filed — Alteration
Replace existing supply grilles/fan coil units (heating/cooling) with new ones to new locations. Install 2 new ERVs at Roof, FA supply & return ducts, all as per plans. Cooling & heating supply systems for the building to remain-to be supplied by exist.
M08042545-P3
11/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/04/2024
Filed — Alteration CO
Int. Reno, Amend Cof O to increase the occ load & modify Occ Class from Institutional ZUG I-3 to I-1, occ of bldg are no longer under restraint/security & capable of self-preservation & responding to emergency situations w/o physical assistance from staff
M01050419-P2
09/04/2024
Filed — Alteration
Renovation of existing non-profit w/sleeping accommodations; remove non-load bearing partitions and install new non-load bearing partitions & finishes; and install new ADA bathrooms. MH & PL filed separately. No change in use, egress or occupancy
M07999563-P1
09/04/2024
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
08/14/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/25/2024
Filed — Alteration CO
Int. Reno, Amend Cof O to increase the occ load & modify Occ Class from Institutional ZUG I-3 to I-1, occ of bldg are no longer under restraint/security & capable of self-preservation & responding to emergency situations w/o physical assistance from staff
M01050419-P1
07/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLIBERTY ONE CONSTRUCTION09/17/2025
DOB NOWGeneral ConstructionPermit IssuedLIBERTY ONE CONSTRUCTION06/25/2024
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC04/19/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY ONE CONSTRUCTION04/17/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP03/21/2024
DOB NOWMechanical SystemsSigned-offLIBERTY ONE CONSTRUCTION03/20/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY ONE CONSTRUCTION03/14/2024
BISMHISSUEDTRANE U.S. INC09/28/2012
BISOTISSUEDTEK CONSTRUCITON INC11/14/2000
BISOTISSUEDSIGNATURE CONSTRUCTION10/18/1994
BISFPISSUEDLUND FIRE PORDUCTS05/16/1991
BISSPISSUEDMEDCO PLUMBING INC03/22/1991
BISSDISSUEDMEDCO PLUMBING INC03/22/1991
3 projects · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Permit IssuedDYNAMIC ELEC'L CONTRS INCGeneral Wiring
01/05/2025CompleteLND ELECTRIC LLCGeneral Wiring
12/24/2018CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/14/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
03/17/2026Interior lighting powerMiltiadis Leptourgosenergy_progress
03/17/2026Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/17/2026Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/17/2026Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
03/24/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/24/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/24/2025Interior lighting powerMiltiadis Leptourgosenergy_progress
03/24/2025Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
01/27/2025Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
01/27/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
01/27/2025Interior lighting powerMiltiadis Leptourgosenergy_progress
01/27/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
11/29/2024Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
11/26/2024Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
11/25/2024Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
11/25/2024Mechanical SystemsMiltiadis Leptourgosspecial
11/25/2024FinalMiltiadis Leptourgosprogress
11/25/2024Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
11/25/2024Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
11/25/2024HVAC-R and service water piping design and insulationMiltiadis Leptourgosenergy_progress
11/25/2024Maintenance informationMiltiadis Leptourgosenergy_progress
11/25/2024HVAC-R and service water heating equipmentMiltiadis Leptourgosenergy_progress
11/25/2024Duct leakage testing, insulation and designMiltiadis Leptourgosenergy_progress
11/25/2024Ventilation and air distribution systemMiltiadis Leptourgosenergy_progress
11/25/2024Shutoff dampersMiltiadis Leptourgosenergy_progress
Latest 25 of 53.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/31/2026M07999563-P1Request digital key ↗
08/31/2026M08042536-I1Request digital key ↗
08/31/2026M08042536-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION9
03/26/2025100918839Open ↗
12/17/2024102801327Open ↗
12/05/2024100918839Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/17/2024102801327Open ↗
▸BISWORK PERMIT APPLICATION1
09/28/2012121129135Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026M08042545-P2Open ↗
09/02/2026M08042545-P2Open ↗
08/29/2026M01050419-P4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026M07999563-I1Open ↗
08/31/2026M07999563-P1Open ↗
08/31/2026M08042536-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026M08042545-P2Open ↗
09/02/2026M08042545-P2Open ↗
09/01/2026M08042536-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/28/2012121129135Open ↗
10/29/2010120513319Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/28/2012121129135Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/28/2012121129135Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
11/01/2017120513319Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist7
08/13/2026M01050419-P3Open ↗
08/13/2026M01050419-I1Open ↗
08/13/2026M01050419-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/31/2026M07999563-P1Open ↗
08/31/2026M08042536-I1Open ↗
08/31/2026M08042536-P1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/16/2012121129135Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/29/2010120513319Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/28/2012121129135Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/16/2024102801327Open ↗
12/16/2024102801327Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/07/2025102801327Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
01/07/2025102801327Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/07/2025102801327Open ↗
12/23/2024100148653Open ↗
12/06/2024100148920Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/28/2012121129135Open ↗
10/29/2010120513319Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/21/2017120513319Open ↗
06/28/2012121129135Open ↗
10/29/2010120513319Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
06/28/2012121129135Open ↗
10/29/2010120513319Open ↗
▸BISBOROUGH INTAKE FORM1
11/21/2017120513319Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification7
08/24/2026M01050419-P6Open ↗
08/24/2026M01050419-P5Open ↗
08/24/2026M01050419-P4Open ↗
Showing 3 of 7 on file for this type