1966Year Built
12Stories
G1Building Class
C5-PZoning
54,420 sfGross Floor Area
1Units
LL97 Covered7 Active Violations 5 unresolved · 2 paperwork only 4 old, status unconfirmed ▸FISP: UNSAFE
All parking garages · Owner of record: LFG Enterprises · 4,267 sf lot · 12.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsSP Plus2 filings
RoofSP Plus, Sprint1p · 2 filings · 6 docs
Site & exteriorJerrick Associates, INC.Under Construction4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Spplus2109/13/2026
Jerrick Associates1609/01/2026
1 Plaza Street Owners303/21/2026
LFG Enterprises103/22/2026
Kinney System103/21/2026
1225 Company103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ospino Engineering209/22/2026
KMB Design Group208/20/2026
Volume Space Consulting104/13/2026
Odc Associates204/06/2026
Grant104/06/2022
James H. Fahey108/17/2020
Dooling & Company Architects102/13/2020
Asif Jamil, RA102/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Sharon Rader103/21/2026
Construction Permit Services303/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold1309/01/2026
Rock Group NYScaffold407/08/2026
Multi TelecomGeneral Contractor303/21/2026
Platinum Services NYScaffold303/21/2026
Infrastructure Repair ServiceGeneral Contractor304/09/2026
Steel SystemsScaffold208/21/2026
GS Construction GroupGeneral Contractor209/24/2026
Telcom Engineering GPGeneral Contractor203/21/2026
Watch Hill Wireless SoluGeneral Contractor107/08/2026
Nivek Electrical ContractingElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB Design Group513208/20/2026
O&S Associates2753204/06/2026
Grant Engineering Consulting3512104/06/2022
Structural Consulting Services1919108/17/2020
Building Lifecycle
All (144)Filed (11)Permit Issued (24)Signed Off (2)Facade (FISP) (15)Violation (60)Inspection (2)Objection (15)Special Inspection (15)
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/29/2026
Objection raised — Other
09/25/2026
Objection raised — Energy
09/25/2026
Objection raised — Scope
09/25/2026
Objection raised — Scope
09/25/2026
Objection raised — Zoning
09/25/2026
Objection raised — Fire_Protection
09/25/2026
Objection raised — Inspections
09/23/2026
Permit issued — Supported Scaffold
M01372620-S2-SF
09/23/2026
Permit issued — General Construction
M01372620-I1-ST
09/22/2026
Filed — Alteration
Herewith filing for repairs to the exterior facade of this existing building. No change to use, egress, or occupancy.
M01372620-S2
09/09/2026
Permit issued — Structural
M01372620-I1-GC
08/31/2026
Permit issued — Sidewalk Shed
M00314495-I1-SH
08/20/2026
Filed — Alteration
Install new gas piping from cellar to floors 1-12 to roof as per plans. No change in use, egress, or occupancy.
M01438179-S1
08/20/2026
Filed — Alteration
Install new gas piping from cellar to floors 1-12 to roof as per plans. No change in use, egress, or occupancy.
M01438179-I1
08/20/2026
Permit issued — Sidewalk Shed
M01385999-I1-SH
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ekata Shah
07/29/2026
Special inspection requirement — Final
Ekata Shah
07/29/2026
Special inspection requirement — Mechanical Systems
Ekata Shah
07/27/2026
Permit issued — Suspended Scaffold
M01372620-S1-SC
07/24/2026
Filed — Alteration
Herewith filing for repairs to the exterior facade of this existing building. No change to use, egress, or occupancy.
M01372620-S1
05/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/27/2026
Permit issued — Sidewalk Shed
M00314495-I1-SH
05/22/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/14/2026
Permit issued — Sidewalk Shed
M01385999-I1-SH
04/13/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01385999-I1
04/13/2026
Objection raised — Scope
04/13/2026
Objection raised — Energy
04/06/2026
Filed — Alteration
Herewith filing for repairs to the exterior facade of this existing building. No change to use, egress, or occupancy.
M01372620-I1
03/23/2026
Special inspection requirement — Structural Steel - Details
TIMOTHY WEBB
03/23/2026
Special inspection requirement — Concrete - Cast-In-Place
TIMOTHY WEBB
03/23/2026
Special inspection requirement — Masonry
TIMOTHY WEBB
03/23/2026
Special inspection requirement — Structural Steel - Welding
TIMOTHY WEBB
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY WEBB
03/16/2026
Special inspection requirement — Final
Prabhu Perumalsamy
02/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/26/2026
Permit issued — Sidewalk Shed
M00314495-I1-SH
01/05/2026
Signed off — Alteration
Filing for repairs to garage. No change to use, egress or occupancy.
M00964201-I1
11/19/2025
Cycle 10 facade report submitted
11/19/2025
Cycle 10 facade report signed — UNSAFE
11/12/2025
Cycle 10 facade inspection completed
09/22/2025
Permit issued — General Construction
M00964201-I1-GC-CX
02/11/2025
Permit issued — Sidewalk Shed
M00314495-I1-SH
09/25/2024
Permit issued — General Construction
M00964201-I1-GC-CX
08/05/2024
Filed — Alteration
Filing for repairs to garage. No change to use, egress or occupancy.
M00964201-I1
06/17/2024
Cycle 9 facade report submitted
06/17/2024
Cycle 9 facade report signed — UNSAFE
06/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2024
Cycle 9 facade inspection completed
03/25/2024
Violation issued (ECB, open)
Construction
03/07/2024
Permit issued — Sidewalk Shed
M00314495-I1-SH
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2023
Special inspection requirement — Structural Steel - Details
SUCHITH JAYASENA
11/21/2023
Special inspection requirement — Concrete - Cast-In-Place
SUCHITH JAYASENA
11/21/2023
Special inspection requirement — Sprayed fire-resistant materials
SUCHITH JAYASENA
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedGS Construction Group09/23/2026
DOB NOWGeneral ConstructionPermit IssuedGS Construction Group09/23/2026
DOB NOWStructuralPermit IssuedGS Construction Group09/09/2026
DOB NOWSidewalk ShedPermit IssuedJerrick Associates08/31/2026
DOB NOWSidewalk ShedPermit IssuedSteel Systems08/20/2026
DOB NOWSuspended ScaffoldPermit IssuedGS Construction Group07/27/2026
DOB NOWSidewalk ShedPermit IssuedJerrick Associates05/27/2026
DOB NOWSidewalk ShedPermit IssuedSteel Systems04/14/2026
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction02/26/2026
DOB NOWGeneral ConstructionSigned-offInfrastructure Repair Services09/22/2025
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction02/11/2025
DOB NOWGeneral ConstructionSigned-offInfrastructure Repair Services09/25/2024
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction03/07/2024
DOB NOWAntennaPermit IssuedA&A Infrastructure06/05/2023
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction03/10/2023
DOB NOWAntennaSigned-offWatch Hill Wireless Solu04/18/2022
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction03/16/2022
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/27/2021
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction03/17/2021
DOB NOWSidewalk ShedPermit IssuedRock Group NY09/30/2020
DOB NOWAntennaPermit IssuedLined Up Construction08/20/2020
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction03/19/2020
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction02/14/2020
DOB NOWSidewalk ShedPermit IssuedRock Group NY02/12/2020
BISOTISSUEDLCS Restoration04/09/2024
BISOTISSUEDLCS Restoration03/29/2022
BISOTISSUEDLCS Restoration03/17/2021
BISOTISSUEDLCS Restoration03/30/2020
BISOTISSUEDLCS Restoration03/12/2020
BISOTISSUEDYoun Design08/05/2016
BISOTISSUEDSquan Construction Services10/31/2014
BISOTISSUEDTelcom Engineering GP08/14/2014
BISOTISSUEDLeone Construction08/13/2014
BISOTISSUEDTelcom Engineering GP10/09/2013
BISOTISSUEDTrinity Technologies03/13/2013
BISOTISSUEDOdyssia Global Commercial10/03/2012
BISOTISSUEDGar Services09/29/2008
BISPLISSUEDFpiffer Plumbing & Heating & Sprinkler03/03/2008
BISOTISSUEDGar Services09/14/2005
BISOTISSUEDOdyssia Global Commercial03/15/2004
+ 9 more permits on file
1 project · most recent 08/20/2026
Generators
FiledStatusContractorScope
08/20/2026——Generators
1 project · most recent 08/20/2026
Gas
FiledStatusContractorScope
08/20/2026——Gas
3 projects · most recent 04/13/2026
FiledStatusContractorScope
04/13/2026Permit IssuedHigh Quality Electric of NYC—
02/13/2020Permit IssuedBorowide Elect'l Contractors—
01/22/2020Permit IssuedIlluminous Electric—
1 project · most recent 09/22/2026
Steel
FiledStatusContractorScope
09/22/2026Permit IssuedGS Construction GroupSteel
1 project · most recent 09/22/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/22/2026Permit IssuedGS Construction GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/29/2026Fire-Resistant Penetrations and JointsEkata Shahspecial
07/29/2026FinalEkata Shahprogress
07/29/2026Mechanical SystemsEkata Shahspecial
03/23/2026Structural Steel - DetailsTIMOTHY WEBBspecial
03/23/2026Concrete - Cast-In-PlaceTIMOTHY WEBBspecial
03/23/2026MasonryTIMOTHY WEBBspecial
03/23/2026Structural Steel - WeldingTIMOTHY WEBBspecial
03/23/2026Structural Stability – Alterations of existing buildingsTIMOTHY WEBBspecial
03/16/2026FinalPrabhu Perumalsamyprogress
11/21/2023Structural Steel - DetailsSUCHITH JAYASENAspecial
11/21/2023Concrete - Cast-In-PlaceSUCHITH JAYASENAspecial
11/21/2023Sprayed fire-resistant materialsSUCHITH JAYASENAspecial
11/21/2023Structural Steel - WeldingSUCHITH JAYASENAspecial
11/16/2023Structural Stability – Alterations of existing buildingsSUCHITH JAYASENAspecial
11/16/2023FinalSUCHITH JAYASENAprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SP PlusParking / TransportationCellar, Floors 1–12, Roof
Project M01438179 Alteration · Plan Examiner Review · 08/20/2026
Project M00370492 Alteration · Permit Entire · 08/17/2020
SprintTelecom siteRoof
Project M00631352 Alteration · LOC Issued · 04/06/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
09/02/2026M00631352-I1Request digital key ↗
08/26/2026M00964201-I1Request digital key ↗
08/21/2026M01438179-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00314495-I1Request digital key ↗
08/15/2026M00301711-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00370492-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION14
12/17/2025140865927Open ↗
10/21/2019140865927Open ↗
05/06/2019122732141Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
04/06/2020140865927Open ↗
03/12/2020140865927Open ↗
08/10/2016122854367Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/12/2020140865927Open ↗
03/05/2020140865927Open ↗
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/23/2017121790099Open ↗
05/23/2017122075565Open ↗
03/04/2015122106210Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/27/2026M01372620-S2Open ↗
09/05/2026M00301711-I1Open ↗
09/04/2026M00370492-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01438179-I1Open ↗
08/31/2026M00964201-I1Open ↗
08/28/2026M01438179-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01438179-I1Open ↗
08/31/2026M00964201-I1Open ↗
08/26/2026M01372620-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/10/2016122854367Open ↗
09/26/2008110279225Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/10/2016122854367Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2019140865927Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/26/2008110279225Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/06/2016122732141Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/21/2019140865927Open ↗
03/22/2017122075565Open ↗
04/06/2016122732141Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/04/2026M00370492-I1Open ↗
09/02/2026M00631352-I1Open ↗
08/18/2026M01372620-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/26/2008110279225Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026M00964201-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/14/2019122732141Open ↗
05/23/2017121790099Open ↗
05/23/2017122075565Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/23/2017121790099Open ↗
05/23/2017122075565Open ↗
03/04/2015122106210Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/04/2026140865927Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2026140865927Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/05/2020140865927Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/04/2026140865927Open ↗
10/21/2019140865927Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/05/2026140865927Open ↗
▸BISMASONRY1
03/05/2026140865927Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/23/2017121790099Open ↗
05/23/2017122075565Open ↗
03/04/2015122106210Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/26/2012121387230Open ↗
09/26/2008110279225Open ↗
▸BISFINAL1
03/04/2026140865927Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
01/27/2026140865927Open ↗
10/21/2019140865927Open ↗
05/23/2017121790099Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET6
08/10/2016122854367Open ↗
04/06/2016122732141Open ↗
09/05/2014122106210Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
05/06/2019122732141Open ↗
03/14/2019122732141Open ↗
▸BISADDITIONAL INFORMATION2
02/16/2026140865927Open ↗
11/13/2019140865927Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/21/2019140865927Open ↗
09/26/2008110279225Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/18/2026M01372620-S1Open ↗
▸DOB NOWCalculations1
08/18/2026M01372620-S1Open ↗