230-05 EDGEWOOD AVENUE
💬 Discuss this project
1935Year Built
1.5Stories
A2Building Class
R3-1Zoning
1,263 sfGross Floor Area
1Units
One story - permanent living quarter · 2,833 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof1p · 1 filing · 9 docs
Attic2p · 1 filing · 9 docs
Floor 13p · 2 filings · 18 docs
Cellar2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HTA GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2023$638K—Private party → Private party$505/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC109/24/2025
JAHMAL SABAHA PE CONSULTING ENGR110/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING203/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272109/24/2025
Building Lifecycle
All (23)Filed (2)Permit Issued (2)Inspection (1)Objection (10)Special Inspection (8)
10/02/2025
Permit issued — Solar
Q01291156-I1-SL
09/24/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01291156-I1
09/22/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/22/2025
Special inspection requirement — Final
Walid Abdulla
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/30/2024
Permit issued — General Construction
Q00944933-I1-GC
04/16/2024
Objection resolved — Addressed
04/04/2024
Objection raised — Other
03/19/2024
Objection resolved — Addressed
11/03/2023
Objection resolved — Addressed
11/03/2023
Objection resolved — Addressed
11/03/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Zoning
10/27/2023
Objection raised — Zoning
10/27/2023
Objection raised — Zoning
10/27/2023
Objection raised — Other
10/16/2023
Filed — Alteration CO
Application filed to supersede Job# 402022351 expired by limitations. Merging existing lot 21 & 22 into one zoning lot and then subdivide intoproposed tentative tax lot 21 & 121. See attached form RP 604 and Site Survey. No work to be done.
Q00944933-I1
10/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
10/12/2023
Special inspection requirement — Metering
Rajasekhar Sakhamuri
10/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/02/2025
DOB NOWGeneral ConstructionPermit IssuedHOPE HOME IMPROVEMENT INC07/30/2024
1 project · most recent 09/24/2025
FiledStatusContractorScope
09/24/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 09/24/2025
FiledStatusContractorScope
09/24/2025Signed-offSUNRUN INSTALLATION SVC8 panels, 3.28 kw, 168.19 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/22/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
09/22/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/22/2025Energy Code Compliance InspectionsWalid Abdullaprogress
09/22/2025FinalWalid Abdullaprogress
09/22/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/12/2023Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
10/12/2023MeteringRajasekhar Sakhamurienergy_progress
10/08/2023Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00944933-I1Request digital key ↗
08/18/2026Q01291156-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/27/2024402022351Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00944933-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00944933-I1Open ↗
08/29/2026Q00944933-I1Open ↗
08/29/2026Q00944933-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01291156-I1Open ↗
08/13/2026Q00944933-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01291156-I1Open ↗
08/23/2026Q01291156-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00944933-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01291156-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01291156-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00944933-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00944933-I1Open ↗