← Back
One story - permanent living quarter
230-07 145 AVENUE
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3-1Zoning
1,000 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: DEKEL 26 LLC · 4,000 sf lot · 0.25 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2025$620K—Private party → DEKEL 26 LLC$620/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN401/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor204/09/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519301/06/2026
Building Lifecycle
All (48)Filed (4)Permit Issued (3)Signed Off (3)Inspection (8)Special Inspection (30)
06/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/07/2026
Signed off — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units.
Q01246840-I1
05/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/01/2026
Signed off — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units.
Q01246840-S1
02/19/2026
Signed off — Alteration
Q01268453-I1
02/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
01/26/2026
Special inspection requirement — Metering
Younes Abouyaala
01/26/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
01/26/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
01/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/26/2026
Special inspection requirement — Chimneys and vents
Younes Abouyaala
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/26/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/26/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/26/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
01/26/2026
Special inspection requirement — Final
NAVEEN KUMAR
01/26/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
01/26/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
01/26/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
01/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
01/26/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
01/26/2026
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
01/26/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
01/26/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
01/06/2026
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units.
Q01246840-P1
01/03/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
01/03/2026
Special inspection requirement — Chimneys and vents
Younes Abouyaala
01/03/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/03/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
01/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
01/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/05/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/19/2025
Permit issued — Plumbing
Q01246840-S1-PL
11/16/2025
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units.
Q01246840-S1
11/07/2025
Permit issued — General Construction
Q01246840-I1-GC-CX
08/12/2025
Permit issued — Construction Fence
Q01268453-I1-FN
08/07/2025
Filed — Alteration
Q01268453-I1
07/14/2025
Filed — Alteration CO
Installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the one family dwelling into a two family dwelling units.
Q01246840-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC11/19/2025
DOB NOWGeneral ConstructionPermit Issued26 BONIM11/07/2025
DOB NOWConstruction FenceSigned-off26 BONIM08/12/2025
1 project · most recent 01/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/06/2026Signed-offPLBG P & H INCGas, Storm, Water/Sanitary
1 project · most recent 11/09/2025
General Wiring
FiledStatusContractorScope
11/09/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/07/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/05/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
01/26/2026Maintenance informationYounes Abouyaalaenergy_progress
01/26/2026MeteringYounes Abouyaalaenergy_progress
01/26/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
01/26/2026Permanent certificateYounes Abouyaalaenergy_progress
01/26/2026Subsurface Investigations (Borings/Test Pits)SHAHRIAR QUAYYUMspecial
01/26/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/26/2026Chimneys and ventsYounes Abouyaalaspecial
01/26/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/26/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/26/2026Subgrade InspectionsYounes Abouyaalaspecial
01/26/2026Footing and FoundationYounes Abouyaalaprogress
01/26/2026FinalNAVEEN KUMARprogress
01/26/2026Structural Wood FrameYounes Abouyaalaprogress
01/26/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/26/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
01/26/2026Fenestration air leakageYounes Abouyaalaenergy_progress
01/26/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
01/26/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
01/26/2026Fenestration areasYounes Abouyaalaenergy_progress
01/26/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
01/26/2026Interior lighting powerYounes Abouyaalaenergy_progress
01/26/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
01/03/2026Permanent certificateYounes Abouyaalaenergy_progress
01/03/2026Chimneys and ventsYounes Abouyaalaspecial
01/03/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
Latest 25 of 48.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026Q01268453-I1Request digital key ↗
08/17/2026Q01246840-S1Request digital key ↗
08/17/2026Q01246840-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026Q01246840-I1Open ↗
08/29/2026Q01246840-I1Open ↗
08/29/2026Q01246840-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026Q01246840-I1Open ↗
08/29/2026Q01246840-I1Open ↗
08/26/2026Q01246840-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026Q01268453-I1Open ↗
08/17/2026Q01246840-S1Open ↗
08/17/2026Q01246840-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
08/17/2026Q01246840-S1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026Q01246840-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸DOB NOWPlot Diagram2
08/17/2026Q01246840-I1Open ↗
08/17/2026Q01246840-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01246840-P1Open ↗
08/17/2026Q01246840-I1Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q01246840-I1Open ↗