Health center, child center, clinic
New York Eye & Ear Outpatient Center
230 2ND AVENUE · Gramercy · BIN 1020387
💬 Discuss this project
1923Year Built
3Stories
I5Building Class
C1-6AZoning
10,703 sfGross Floor Area
0Units
0 Active Violations
Health center, child center, clinic · 3,994 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTransgender Center, Mount Sinai Health System66p · 9 filings · 20 docs
Floor 3Transgender Center, Mount Sinai Health System62p · 7 filings · 20 docs
Floor 2Mount Sinai Health System, Transgender Center53p · 7 filings · 20 docs
Floor 1Transgender Center, Mount Sinai Health System77p · 9 filings · 20 docs
CellarTransgender Center69p · 5 filings · 20 docs
BasementMount Sinai Health System, Transgender Center6p · 6 filings · 20 docs
Sub-BasementMount Sinai Health System, Transgender Center5p · 3 filings · 13 docs
Site & exteriorMount Sinai Health System12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Nyee1107/08/2026
Chase Manhattan Bank403/21/2026
Chemical Bank403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GKG Architect504/14/2025
Loring Consulting Engineers2011/25/2024
M C Structural Engineering111/21/2023
KN3 Engineering108/25/2023
Urban Integrations306/21/2023
Architectural Preservation Studio106/24/2021
JC. Professionals108/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants2803/21/2026
Green Light Expediting203/21/2026
United Safety Consultants303/21/2026
Codegreen203/21/2026
AE Design Solution203/21/2026
Outsourceconsultants Company1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2007/08/2026
Unity Construction ServicesGeneral Contractor1207/08/2026
B & A Restoration Contractingspecialty_contractor507/08/2026
George Breslaw PlumbingPlumbing207/08/2026
Rockmor Electric EnterprisesElectrical203/21/2026
Ideal Interiors GroupGeneral Contractor203/21/2026
Aggressive Fire ProtectionFire Protection207/08/2026
Capital Contracting P&HPlumbing207/08/2026
J T & T Air Conditioningspecialty_contractor107/08/2026
Caputek Electrical ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection28271011/25/2024
Alan Margolin & Associates423208/25/2023
Milrose Consultants2003208/25/2023
Atlantic Engineeringlabor1381711/09/2021
J C Professionals1431108/22/2019
Building Lifecycle
All (140)Filed (32)Permit Issued (27)Signed Off (14)Violation (25)Inspection (10)Objection (2)Special Inspection (30)
04/16/2025
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
04/14/2025
Filed — Alteration CO
herewith filing for revisions to schedule A/ JSO only no change to plans.
M00945979-P3
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
04/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
JONAR MADRIAGA
04/14/2025
Special inspection requirement — Interior lighting power
JONAR MADRIAGA
01/31/2025
Permit issued — General Construction
M00945979-I1-GC
01/09/2025
Signed off — Alteration
Mechanical modifications including the installation of air conditioning units and related ducts and piping as indicated on the plans filed herewith. No change in use, egress or occupancy.
M00945901-I1
12/09/2024
Signed off — Alteration
FILING HEREWITH FOR MODIFICATIONS OF EXISTING SPRINKLER SYSTEM FOR NEW LAYOUT.
M00945922-I1
12/09/2024
Signed off — Alteration
Sprinkler modifications including the installation of a temporary sprinkler loop as per plans. . No change to use, occupancy or egress.
M08040776-I1
12/02/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2024
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
11/25/2024
Filed — Alteration
FILING HEREWITH FOR MODIFICATIONS OF EXISTING SPRINKLER SYSTEM FOR NEW LAYOUT.
M00945922-P2
11/19/2024
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
11/14/2024
Filed — Alteration
Sprinkler modifications including the installation of a temporary sprinkler loop as per plans. . No change to use, occupancy or egress.
M08040776-P1
11/11/2024
Signed off — Alteration
pipe scaffolding installed per plans, no change in use, egress or occupancy
M00415805-I1
11/11/2024
Signed off — Alteration
Sidewalk shed installed per plans, no change in use, egress or occupancy
M00397904-I1
10/17/2024
Signed off — Alteration
STRUCTURAL MODIFICATIONS INCLUDING INSTALLATION OF NEW STEEL BEAMS FOR NEW FLOOR OPENING AT THE 3RD FLOOR AND TO SUPPORT NEW MECHANICAL UNITS AT THE ROOF FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00956272-I1
10/03/2024
Signed off — Alteration
FILED HEREWITH PLUMBING MODIFICATIONS INCLUDING INSTALLATION OF NEW PLUMBING FIXTURES AND ASSOCIATED PIPING.
M00945909-I1
09/18/2024
Filed — Alteration
FILING HEREWITH FOR MODIFICATIONS OF EXISTING SPRINKLER SYSTEM FOR NEW LAYOUT.
M00945922-P1
09/18/2024
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
08/28/2024
Filed — Alteration
Mechanical modifications including the installation of air conditioning units and related ducts and piping as indicated on the plans filed herewith. No change in use, egress or occupancy.
M00945901-P2
08/28/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Heating Systems
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Final
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
08/28/2024
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
08/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
08/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
08/27/2024
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
08/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
08/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
08/27/2024
Special inspection requirement — Ventilation and air distribution system
JONAR MADRIAGA
08/27/2024
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
08/27/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
08/27/2024
Special inspection requirement — Final
JONAR MADRIAGA
08/15/2024
Filed — Alteration
Mechanical modifications including the installation of air conditioning units and related ducts and piping as indicated on the plans filed herewith. No change in use, egress or occupancy.
M00945901-P1
07/31/2024
Filed — Alteration CO
herewith filing for revisions to schedule A/ JSO only no change to plans.
M00945979-P2
07/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2024
Filed — Alteration CO
herewith filing for revisions to schedule A/ JSO only no change to plans.
M00945979-P1
07/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2024
Filed — Alteration
FILED HEREWITH PLUMBING MODIFICATIONS INCLUDING INSTALLATION OF NEW PLUMBING FIXTURES AND ASSOCIATED PIPING.
M00945909-P2
05/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2024
Signed off — Alteration
Interior removals of plumbing fixtures and related piping as per plans . No changes in occupancy, use or egress.
M08039832-I1
04/15/2024
Signed off — Alteration
M08039816-I1
04/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/05/2024
Signed off — Alteration
Interior demolition of partial floor including partitions, finishes and plumbing fixtures including Interior renovations as per plans. No changes in occupancy, use or egress.
M08039730-I1
02/23/2024
Permit issued — Supported Scaffold
M00415805-I1-SF
02/23/2024
Permit issued — Sidewalk Shed
M00397904-I1-SH
02/21/2024
Permit issued — General Construction
M00945979-I1-GC
02/16/2024
Permit issued — Sprinklers
M00945922-I1-EW-SP
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUnity Construction Services01/31/2025
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/23/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/23/2024
DOB NOWGeneral ConstructionPermit IssuedUnity Construction Services02/21/2024
DOB NOWSprinklersSigned-offAggressive Fire Protection02/16/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H01/16/2024
DOB NOWStructuralSigned-offUnity Construction Services01/12/2024
DOB NOWMechanical SystemsSigned-offUnity Construction Services01/12/2024
DOB NOWStructuralSigned-offB & A Restoration Contracting10/12/2023
DOB NOWPlumbingSigned-offCapital Contracting P&H10/06/2023
DOB NOWSprinklersSigned-offAggressive Fire Protection09/20/2023
DOB NOWGeneral ConstructionSigned-offUnity Construction Services09/19/2023
DOB NOWMechanical SystemsSigned-offUnity Construction Services09/19/2023
DOB NOWGeneral ConstructionSigned-offB & A Restoration Contracting04/07/2023
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/24/2023
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/24/2023
DOB NOWGeneral ConstructionSigned-offB & A Restoration Contracting08/25/2022
DOB NOWPlumbingSigned-offGeorge Breslaw Plumbing07/28/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/25/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/25/2022
DOB NOWMechanical SystemsSigned-offIdeal Interiors Group05/14/2021
DOB NOWPlumbingSigned-offGeorge Breslaw Plumbing04/29/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/08/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/01/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding10/27/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding09/14/2020
DOB NOWMechanical SystemsSigned-offJTT Air Conditioning09/23/2019
BISOTISSUEDIdeal Interiors Group03/12/2021
BISOTISSUEDIdeal Interiors Group12/10/2020
BISPLISSUEDPlumbing P & H02/23/2015
BISOTISSUEDPolones Construction02/17/2015
BISEQISSUEDRock Scaffolding07/15/2013
BISEQISSUEDRock Scaffolding07/15/2013
BISPLISSUEDR.J.C. Mechanical05/15/2012
BISMHISSUEDEmpire General Contracting04/20/2012
BISOTISSUEDEmpire General Contracting04/20/2012
BISSPISSUEDDevo Fire Protection06/19/2009
BISPLISSUEDR.J.C. Mechanical06/04/2009
BISMHISSUEDEmpire General Contracting06/02/2009
BISOTISSUEDEmpire General Contracting06/02/2009
+ 18 more permits on file
4 projects · most recent 02/24/2025
General Wiring
FiledStatusContractorScope
02/24/2025CompleteRockmor Electric EnterprisesGeneral Wiring
01/29/2024CompleteCaputek Electrical Services—
03/24/2021CompleteCorzo Electl SystemsGeneral Wiring
09/10/2020CompleteTop Shelf Electric—
1 project · most recent 08/25/2023
FiledStatusContractorScope
08/25/2023Signed-offB & A Restoration Contracting1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
04/16/2025Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
04/16/2025Interior lighting powerJONAR MADRIAGAenergy_progress
04/16/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
04/14/2025Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
04/14/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
04/14/2025Interior lighting powerJONAR MADRIAGAenergy_progress
11/26/2024Sprinkler SystemsJONAR MADRIAGAspecial
11/19/2024Sprinkler SystemsJONAR MADRIAGAspecial
09/18/2024Sprinkler SystemsJONAR MADRIAGAspecial
08/28/2024Shutoff dampersJONAR MADRIAGAenergy_progress
08/28/2024Maintenance informationJONAR MADRIAGAenergy_progress
08/28/2024Energy Code Compliance InspectionsJONAR MADRIAGAprogress
08/28/2024Duct leakage testing, insulation and designJONAR MADRIAGAenergy_progress
08/28/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
08/28/2024FinalJONAR MADRIAGAprogress
08/28/2024Mechanical SystemsJONAR MADRIAGAspecial
08/28/2024Heating SystemsJONAR MADRIAGAspecial
08/28/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
08/28/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
08/28/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
08/28/2024Ventilation and air distribution systemJONAR MADRIAGAenergy_progress
08/27/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
08/27/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
08/27/2024Heating SystemsJONAR MADRIAGAspecial
08/27/2024Mechanical SystemsJONAR MADRIAGAspecial
Latest 25 of 94.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Transgender CenterMedical / HealthcareCellar, Sub-basement, Floors 1–3, Roof
Project M00945979 Alteration CO · Permit Entire · 01/25/2024
Project M08039730 Alteration · LOC Issued · 08/08/2023
Project M00406271 Alteration · LOC Issued · 11/12/2020
Project M00407762 Alteration · LOC Issued · 11/12/2020
Mount Sinai Health SystemMedical / HealthcareSub-basement, Floors 1–3, Roof
Project M08039816 Alteration · LOC Issued · 08/14/2023
Project M08039832 Alteration · LOC Issued · 08/14/2023
Project M00544472 Alteration · Permit Entire · 06/24/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 413 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch21
08/29/2026M08039730-I1Request digital key ↗
08/29/2026M08039816-I1Request digital key ↗
08/29/2026M08039832-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/03/2026M00406271-I1Request digital key ↗
09/03/2026M00406271-P5Request digital key ↗
09/03/2026M00406271-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00212108-I1Request digital key ↗
09/03/2026M00407762-I1Request digital key ↗
08/15/2026M00407762-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00415805-I1Request digital key ↗
09/04/2026M00415805-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00397904-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION34
05/13/2025100758912Open ↗
04/28/2025122252490Open ↗
04/24/2025140994100Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION11
03/12/2021140995877Open ↗
12/10/2020140969557Open ↗
03/05/2015122252490Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/18/2025120029646Open ↗
▸Seals & Professional Certifications155
▸DOB NOWProgress Inspector Seal & Signature62
09/24/2026M00406271-P3Open ↗
09/23/2026M00945909-P2Open ↗
09/23/2026M00945909-P2Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/05/2026M00212108-I1Open ↗
09/04/2026M00415805-P1Open ↗
09/04/2026M00415805-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/24/2026M00406271-P3Open ↗
09/02/2026M00544472-S1Open ↗
09/02/2026M00544472-S1Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
05/13/2021140969557Open ↗
05/13/2021140969557Open ↗
05/13/2021140969557Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/19/2016120930868Open ↗
01/30/2015122252490Open ↗
07/25/2013121713501Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/04/2021140995877Open ↗
10/23/2020140969557Open ↗
01/30/2015122252490Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/25/2013121713501Open ↗
07/25/2013121713495Open ↗
12/27/2011120930868Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/04/2021140995877Open ↗
10/23/2020140969557Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/04/2021140995877Open ↗
10/23/2020140969557Open ↗
▸Trade Schedules & Equipment20
▸BISSELF-CERT PLUMBING NOTICE8
06/30/2015122252490Open ↗
03/30/2015122252490Open ↗
05/31/2012120930868Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
03/18/2025104648017Open ↗
04/25/2013120930047Open ↗
01/02/2013120930047Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/28/2016120930868Open ↗
04/28/2016120930868Open ↗
04/28/2016120930868Open ↗
▸BISSCHEDULE B - PLUMBING2
12/27/2011120930868Open ↗
05/01/2009120027265Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
11/17/2009120027265Open ↗
▸BISEQUIPMENT USE PERMITS1
05/12/2016120930868Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/30/2015122252490Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026M00945979-P1Open ↗
08/13/2026M00945979-P3Open ↗
08/13/2026M00945979-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
03/12/2021140995877Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
02/11/2021140969557Open ↗
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form11
08/29/2026M08039730-I1Open ↗
08/29/2026M08039816-I1Open ↗
08/29/2026M08039832-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00212108-I1Open ↗
09/03/2026M00406271-P4Open ↗
09/03/2026M00406271-P5Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
12/30/2011120930047Open ↗
12/27/2011120930868Open ↗
05/06/2009120029646Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/12/2021140995877Open ↗
01/30/2015122252490Open ↗
07/25/2013121713495Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/17/2020140969557Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/25/2013121713495Open ↗
▸Energy Compliance15
▸BISAS-BUILT ENERGY ANALYSIS4
11/21/2022140995877Open ↗
11/18/2022140995877Open ↗
05/14/2021140969557Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/12/2016120930868Open ↗
05/12/2016120930868Open ↗
05/12/2016120930868Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/04/2021140995877Open ↗
10/23/2020140969557Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/27/2011120930868Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/03/2023140995877Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/23/2020140969557Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY17
10/03/2023140995877Open ↗
10/03/2023140995877Open ↗
11/21/2022140995877Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs40
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
09/03/2026M00406271-P5Open ↗
09/03/2026M00406271-I1Open ↗
09/03/2026M00406271-P1Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/13/2025100758912Open ↗
03/18/2025120029646Open ↗
10/18/2023140995877Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
07/25/2013121713501Open ↗
07/25/2013121713495Open ↗
12/30/2011120930047Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT17
10/12/2023140995877Open ↗
11/18/2022140995877Open ↗
05/14/2021140969557Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/06/2025120027265Open ↗
03/06/2025120029646Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET12
02/02/2015122252506Open ↗
01/30/2015122252490Open ↗
01/30/2015122252490Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION10
05/13/2021140969557Open ↗
05/10/2021140969557Open ↗
02/12/2021140969557Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/04/2021140995877Open ↗
10/23/2020140969557Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification4
08/28/2026M00945979-P2Open ↗
08/28/2026M00945979-P3Open ↗
08/28/2026M00945979-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/18/2023140995877Open ↗
02/02/2015122252506Open ↗
01/28/2015122252490Open ↗
▸BISSupporting Document: Fee Exempt2
05/10/2021140969557Open ↗
02/11/2021140969557Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
01/04/2021140995877Open ↗