← Back
Two family brick
230-50 EDGEWOOD AVENUE
💬 Discuss this project
1955Year Built
2Stories
B1Building Class
R3-1Zoning
2,300 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 4,887 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/26/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/26/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
03/20/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.1 KW
Q01340174-I1
12/31/2025
Permit issued — Solar
Q01340174-I1-SL
12/26/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 10 modules, 4.1 KW
Q01340174-I1
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/26/2025
Special inspection requirement — Final
Mina Makar
12/26/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
01/06/2012
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/31/2025
1 project · most recent 12/26/2025
FiledStatusContractorScope
12/26/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/26/2025Fire-Resistant Penetrations and JointsMina Makarspecial
12/26/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
12/26/2025Energy Code Compliance InspectionsMina Makarprogress
12/26/2025FinalMina Makarprogress
12/26/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01340174-I1Open ↗
08/23/2026Q01340174-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01340174-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01340174-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01340174-I1Open ↗