← Back
Miscellaneous warehouse
230 57 ST
BROOKLYN · BIN 3015581
💬 Discuss this project
1988Year Built
2Stories
E9Building Class
M1-2Zoning
10,000 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Miscellaneous warehouse · 5,017 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Roof2p · 1 filing · 7 docs
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MIDLAND BEACH YARD LLC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.106/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANGZHENGCON103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KJK ELECTRIC INCElectrical103/22/2026
Building Lifecycle
All (29)Filed (1)Violation (2)Objection (5)Special Inspection (21)
11/24/2025
Violation issued (HPD, closed)
I
12/19/2024
Objection raised — Admin
12/18/2024
Objection resolved — Addressed
12/17/2024
Objection resolved — Addressed
07/23/2024
Special inspection requirement — Fenestration areas
07/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
11/28/2023
Violation issued (HPD, closed)
I
06/15/2023
Objection raised — Scope
06/14/2023
Objection raised — Other
06/12/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Application of plumbing/sprinkler works in conjunction with Alt-1 general construction.
B00884582-I1
06/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
06/08/2023
Special inspection requirement — Lighting controls
06/08/2023
Special inspection requirement — Shutoff dampers
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/08/2023
Special inspection requirement — Interior lighting power
06/08/2023
Special inspection requirement — Fenestration air leakage
06/08/2023
Special inspection requirement — Maintenance information
06/08/2023
Special inspection requirement — Insulation placement and R values
06/08/2023
Special inspection requirement — Lighting in dwelling units
06/08/2023
Special inspection requirement — Structural Cold-Formed Steel
06/08/2023
Special inspection requirement — Structural Steel - Details
06/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
06/08/2023
Special inspection requirement — Air barrier - visual inspection
06/02/2023
Special inspection requirement — Mechanical Systems
06/02/2023
Special inspection requirement — Final
06/02/2023
Special inspection requirement — Footing and Foundation
Nothing on file for this building.
1 project · most recent 06/12/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/12/2023——Gas, Storm, Water/Sanitary
1 project · most recent 02/25/2020
FiledStatusContractorScope
02/25/2020CompleteKJK ELECTRIC INC2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/23/2024Fenestration areas—energy_progress
07/23/2024HVAC-R and service water heating system controls—energy_progress
07/23/2024HVAC-R and service water piping design and insulation—energy_progress
07/23/2024HVAC-R and service water heating equipment—energy_progress
06/09/2023Fenestration and door U-factor and product ratings—energy_progress
06/08/2023Lighting controls—energy_progress
06/08/2023Shutoff dampers—energy_progress
06/08/2023Fire-Resistant Penetrations and Joints—special
06/08/2023Interior lighting power—energy_progress
06/08/2023Fenestration air leakage—energy_progress
06/08/2023Maintenance information—energy_progress
06/08/2023Insulation placement and R values—energy_progress
06/08/2023Lighting in dwelling units—energy_progress
06/08/2023Structural Cold-Formed Steel—special
06/08/2023Structural Steel - Details—special
06/08/2023Structural Stability – Alterations of existing buildings—special
06/08/2023Fire-Resistance Rated Construction—progress
06/08/2023Air barrier - visual inspection—energy_progress
06/02/2023Mechanical Systems—special
06/02/2023Final—progress
06/02/2023Footing and Foundation—progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00884582-S1Request digital key ↗
08/27/2026B00884582-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00884582-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00884582-S1Open ↗
08/13/2026B00884582-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00884582-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00884582-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00884582-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00884582-I1Open ↗