← Back
Predominantly retail with other uses
230 7 AVENUE
MANHATTAN · BIN 1014154
💬 Discuss this project
1920Year Built
4Stories
K4Building Class
C6-3XZoning
5,710 sfGross Floor Area
4Units
15 Open Violations ▸
Predominantly retail with other uses · Owner of record: 230 7TH AVENUE LLC · 1,573 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 7 docs
Floor 22p · 1 filing · 10 docs
Floor 15p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
230 7TH AVENUE3507/08/2026
PRESPECTIVE GENERAL CONSTRUCTION IN303/22/2026
230 7TH LLC C/O A. UZZU103/22/2026
230 7TH AVENUE LLC 1103/22/2026
W BROTHERS REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC701/26/2023
JUSTIN GEORGES ARCHITECT104/04/2022
CLIP ARCHITECTS203/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FREDD & H CONSTRUCION CORGeneral Contractor303/21/2026
PERSPECTIVE GENERAL CONSTGeneral Contractor303/21/2026
JZ CONSTRUCTION GROUP INCGeneral Contractor207/08/2026
GO PRO PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREAT WALL CONSULTANT P.E5633801/26/2023
MSM ENGINEERING SERVICES,8449101/26/2023
Building Lifecycle
All (77)Filed (10)Permit Issued (5)Signed Off (1)Violation (35)Inspection (6)Special Inspection (20)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/02/2023
Permit issued — Mechanical Systems
M00810683-I1-MS
01/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
01/29/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/26/2023
Filed — Alteration
M00724941-P1
01/26/2023
Filed — Alteration
File plumbing work at 1st floor in conjunction with DOB Now Construction #M00724941. Install commercial cooking equipment & plumbing fixtures at the existing kitchen of Eating & Dinking Establishment. No change in use, egress, or occupancy.
M00724953-P3
01/26/2023
Filed — Alteration
Propose mechanical work to install commercial cooking system for existing commercial kitchen of eating and drinking establishment in conjunction with DOB Now plumbing #M00724953 as per plan. No change in use, egress, or occupancy.
M00810683-I1
01/24/2023
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
01/24/2023
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
01/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
01/24/2023
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
01/24/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/10/2023
Special inspection requirement — Lighting in dwelling units
MOHAMED MAHMOUD
01/10/2023
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
01/10/2023
Special inspection requirement — Final
MOHAMED MAHMOUD
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
01/10/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
08/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/05/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2022
Filed — Alteration
File plumbing work at 1st floor in conjunction with DOB Now Construction #M00724941. Install commercial cooking equipment & plumbing fixtures at the existing kitchen of Eating & Dinking Establishment. No change in use, egress, or occupancy.
M00724953-P2
08/04/2022
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
08/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
07/06/2022
Signed off — Alteration
ADDRESS ECB VIOLATIONS #35489543K, 35586004X, 35586003Y, 35546617M, 35546618Y, 35546616K, 35489544M, & 35489542Z. PROPOSE ILLEGAL PARTITION ON THE 2ND FL AND RESTORE IT BACK TO LEGAL CONDITION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00634932-I1
07/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/06/2022
Filed — Alteration
File plumbing work at 1st floor in conjunction with DOB Now Construction #M00724941. Install commercial cooking equipment & plumbing fixtures at the existing kitchen of Eating & Dinking Establishment. No change in use, egress, or occupancy.
M00724953-P1
06/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
06/06/2022
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
06/03/2022
Permit issued — Plumbing
M00724953-I1-PL
05/26/2022
Permit issued — General Construction
M00724941-I1-GC
05/03/2022
Filed — Alteration
File plumbing work at 1st floor in conjunction with DOB Now Construction #M00724941. Install commercial cooking equipment & plumbing fixtures at the existing kitchen of Eating & Dinking Establishment. No change in use, egress, or occupancy.
M00724953-I1
05/03/2022
Filed — Alteration
M00724941-I1
04/18/2022
Permit issued — Sidewalk Shed
M00707507-I1-SH
04/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jaeyoung Jang
04/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
04/04/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00707507-I1
03/30/2022
Filed — Alteration
ADDRESS ECB VIOLATIONS #35489543K, 35586004X, 35586003Y, 35546617M, 35546618Y, 35546616K, 35489544M, & 35489542Z. PROPOSE ILLEGAL PARTITION ON THE 2ND FL AND RESTORE IT BACK TO LEGAL CONDITION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00634932-P1
03/28/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/14/2022
Permit issued — General Construction
M00634932-I1-GC
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2021
Filed — Alteration
ADDRESS ECB VIOLATIONS #35489543K, 35586004X, 35586003Y, 35546617M, 35546618Y, 35546616K, 35489544M, & 35489542Z. PROPOSE ILLEGAL PARTITION ON THE 2ND FL AND RESTORE IT BACK TO LEGAL CONDITION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00634932-I1
11/13/2021
Violation issued (ECB, closed)
Construction
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/2021
Violation issued (ECB, closed)
Construction
07/28/2021
Violation issued (ECB, closed)
Zoning
07/28/2021
Violation issued (ECB, closed)
Construction
06/07/2021
Violation issued (ECB, closed)
Construction
06/07/2021
Violation issued (ECB, closed)
Construction
06/07/2021
Violation issued (ECB, closed)
Construction
06/07/2021
Violation issued (ECB, closed)
Construction
02/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJZ CONSTRUCTION GROUP INC02/02/2023
DOB NOWPlumbingSigned-offGO PRO PLUMBING AND HEATI06/03/2022
DOB NOWGeneral ConstructionPermit IssuedFREDD & H CONSTRUCION COR05/26/2022
DOB NOWSidewalk ShedPermit IssuedPERSPECTIVE GENERAL CONST04/18/2022
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC03/14/2022
BISPLISSUEDALL DAY PLUMBING & HEATING12/19/2016
BISPLISSUEDALL DAY PLUMBING & HEATING04/15/2015
BISPLISSUEDALL DAY PLUMBING & HEATING12/06/2013
BISOTISSUEDC & Q CONSTRUCTION INC10/31/2013
BISFSISSUEDWEATHER FUEL OIL CO.12/06/1991
1 project · most recent 01/26/2023
Ventilation Systems
FiledStatusContractorScope
01/26/2023Permit IssuedJZ CONSTRUCTION GROUP INCVentilation Systems
1 project · most recent 01/26/2023
Gas Water/Sanitary
FiledStatusContractorScope
01/26/2023Signed-offGO PRO PLUMBING AND HEATIGas, Water/Sanitary
1 project · most recent 04/04/2022
Sidewalk Shed
FiledStatusContractorScope
04/04/2022Permit IssuedPERSPECTIVE GENERAL CONSTSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/28/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/29/2023Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
01/29/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/24/2023Maintenance informationMOHAMED MAHMOUDenergy_progress
01/24/2023Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
01/24/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
01/24/2023Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
01/24/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/24/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/10/2023Lighting in dwelling unitsMOHAMED MAHMOUDenergy_progress
01/10/2023Mechanical SystemsMOHAMED MAHMOUDspecial
01/10/2023FinalMOHAMED MAHMOUDprogress
01/10/2023Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
01/10/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/10/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
08/04/2022Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
08/04/2022Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
06/06/2022Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
06/06/2022Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
04/11/2022Fire-Resistance Rated ConstructionJaeyoung Jangprogress
04/11/2022Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/03/2026M00634932-P1Request digital key ↗
09/03/2026M00634932-I1Request digital key ↗
09/02/2026M00707507-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION11
11/12/2015121808259Open ↗
09/10/2015121808259Open ↗
09/30/2014121808259Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION5
12/28/2016121808259Open ↗
04/28/2015121808259Open ↗
12/16/2013121808259Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00634932-I1Open ↗
09/03/2026M00634932-P1Open ↗
09/02/2026M00724953-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/29/2026M00634932-I1Open ↗
08/29/2026M00810683-I1Open ↗
08/29/2026M00810683-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/29/2026M00634932-I1Open ↗
08/29/2026M00810683-I1Open ↗
08/28/2026M00724953-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/31/2014121808259Open ↗
10/15/2013121808259Open ↗
10/15/2013121808259Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/08/2014121808259Open ↗
10/15/2013121808259Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/15/2013121808259Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/12/2015121808259Open ↗
09/10/2015121808259Open ↗
09/30/2014121808259Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING2
02/20/2014121808259Open ↗
10/15/2013121808259Open ↗
▸BISEQUIPMENT USE PERMITS1
12/17/2014121808259Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
12/17/2014121808259Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/12/2014121808259Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00634932-I1Open ↗
09/03/2026M00634932-P1Open ↗
09/02/2026M00724953-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026M00810683-I1Open ↗
08/13/2026M00724941-I1Open ↗
08/13/2026M00724953-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2013121808259Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026M00634932-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/31/2014121808259Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/31/2014121808259Open ↗
10/15/2013121808259Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION5
01/19/2017121808259Open ↗
05/06/2014121808259Open ↗
02/20/2014121808259Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
10/15/2013121808259Open ↗