| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/01/2026 | — | — | Air Conditioning Systems | — |
| 04/24/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PEAD-AA42NL 90,000 CFM · Vrf Indoor ×2 PVFY-P18NAMU-E1 400 CFM · Vrf Indoor ×2 PUMY-P60NKMU 124,000 BTU · Vrf Outdoor ×1 PVFY-P30NAMU-E1 750 CFM · Vrf Indoor ×1 |
| 03/11/2021 | Permit Issued | MAJESTIC GC CORP | Air Conditioning Systems, Others | Cooling Mitsubishi Electric PEFY-P18NMHU-E3 670 CFM · Vrf Indoor ×1 PEFY-P30NMAU-E3 600 CFM · Vrf Indoor ×1 PVFY-P18NMAU-E1 585 CFM · Vrf Indoor ×1 PVFY-P30NMAU-E3 875 CFM · Vrf Indoor ×1 PVFY-P30NMHU-E2 875 CFM · Vrf Indoor ×1 Other Mitsubishi Electric PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×2 |
| 11/20/2019 | Permit Issued | ROYAL HVAC SYSTEMS INC | Air Conditioning Systems, Ventilation Systems | Cooling Ventilation Greenheck SQ-80-VG 200 CFM · Exhaust Fan ×5 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | — | — | Water/Sanitary |
| 04/24/2026 | — | — | Water/Sanitary |
| 04/09/2026 | Signed-off | EZ RUNER CONSTRUCTION COR | Water/Sanitary |
| 09/22/2025 | Signed-off | GREGG NY PLUMBING, INC | Water/Sanitary |
| 09/17/2025 | Signed-off | INNOVATIVE HEATING SOLUTI | Water/Sanitary |
| 04/21/2020 | Signed-off | M C M PLBG & HTG, INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2026 | Permit Issued | GOODALL ELECTRIC CORP | General Wiring |
| 05/25/2026 | Permit Issued | A & S MASTER ELEC'L CORP | General Wiring |
| 02/19/2026 | Complete | MUM ELECTRICAL CORP | General Wiring |
| 02/06/2026 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 01/29/2025 | Complete | PETER J. CATANZARO, INC. | General Wiring |
| 08/27/2024 | Complete | ASTER ELECTRIC, INC | — |
| 08/30/2023 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 08/09/2023 | Complete | ELPO ELECTRICAL CONTG INC | General Wiring |
| 05/15/2023 | Complete | WISE ELECTRICAL SVCS INC | General Wiring |
| 04/18/2023 | Complete | POWER SURGE ELECTRIC, INC | General Wiring |
| 07/31/2022 | Permit Issued | CENTRUM ELECTRIC CORP | General Wiring |
| 03/10/2022 | Complete | KINGS ELECTRIC CO., INC. | — |
| 11/01/2021 | Complete | A.C. MORGAN ELECTRIC | General Wiring |
| 10/29/2021 | Permit Issued | GEMINI ELECTRIC CO., INC. | General Wiring |
| 10/19/2021 | Permit Issued | ARSENIO NYC ELECTRICAL IN | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2021 | Permit Issued | MAJESTIC GC CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/08/2023 | Permit Issued | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2025 | Signed-off | GREGG NY PLUMBING, INC | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2025 | Signed-off | KAY WATERPROOFING CORP. | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| AKAM ASSOCIATES | 78 | 09/15/2026 |
| CEPRINE CONSTRUCTION | 4 | 07/08/2026 |
| BOLIVAR APARTMENTS | 148 | 03/22/2026 |
| BELL MARC REALTY | 1 | 03/22/2026 |
| TO OWNER OF 230 CENTRAL P | 2 | 03/22/2026 |
| KINGSWOOD MANAGEMENT | 1 | 03/22/2026 |
| BOLIVIAN APTS CO. | 1 | 03/22/2026 |
| THE CHARLES H GREENTHAL GROUP | 2 | 03/21/2026 |
| C O WALLACK MANAGEMENT | 8 | 03/21/2026 |
| 230 CENTRAL PARK WEST | 4 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MARK GOULD ARCHITECT | 5 | 09/01/2026 |
| A2 ARCHITECT, PC | 6 | 04/24/2026 |
| TABULA ARCHITECTURE STUDIO | 2 | 09/22/2025 |
| KARO ARCHITECTS | 3 | 09/17/2025 |
| GEORGE J. XERAKIAS, PE | 1 | 04/01/2025 |
| RAND ENGINEERING & ARCHITECTURE DPC | 3 | 03/12/2025 |
| ENTHINK ENGINEERS LLC | 1 | 10/12/2023 |
| ASHRAF CORP | 1 | 09/08/2023 |
| D'ANTONIO CONSULTING ENGINEERS | 4 | 08/31/2023 |
| CL ENGINEERING P.C. | 2 | 05/11/2022 |
| JUDITH GERRARD | 1 | 10/12/2021 |
| CES ENGINEERING LLC | 1 | 09/02/2021 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 1 | 08/30/2021 |
| GUERIN GLASS ARCHITECTS | 1 | 08/23/2021 |
| M.ARCH ARCHITECTS | 2 | 07/22/2021 |
| RAND ENGINEERING & ARCHITECTURE, DP | 3 | 05/26/2021 |
| LUKE LICALZI, P.E., P.C. | 2 | 05/03/2021 |
| DEVERE ARCHITECTURE | 1 | 02/08/2021 |
| ROBIN EDWARD BERNSTEIN, ARCHITECT | 1 | 01/29/2021 |
| PACE ENGINEERING P.C. | 4 | 10/15/2020 |
| S.M. BERGER ARCHITECTURE PC | 1 | 08/26/2020 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 2 | 04/21/2020 |
| KZ ENGINEERING, P.C | 1 | 02/09/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 6 | 03/21/2026 |
| ANZALONE ARCHITECTURE | 4 | 03/21/2026 |
| JULIAN A. GOMEZ | 10 | 03/21/2026 |
| 4444 PPPP CORP | 4 | 03/21/2026 |
| J A EXPEDITING | 10 | 03/21/2026 |
| J. CALLAHAN CONSULTING, INC. | 5 | 03/21/2026 |
| MUNICIPAL EXPEDITING | 4 | 03/21/2026 |
| DYNAMIC BUILDING CONSULTANTS | 4 | 03/21/2026 |
| H J BUILDING CONSULTING | 4 | 03/21/2026 |
| NEXUS CONSULTING NYC, INC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| MAJESTIC GC CORP | General Contractor | 10 | 07/08/2026 |
| PAWLEY INTERIOR CONTRACTING | General Contractor | 10 | 03/21/2026 |
| NORMAN PROJECT MGMT LLC | General Contractor | 9 | 03/21/2026 |
| NICE PLUMBING CORP | Plumbing | 6 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 5 | 07/08/2026 |
| DIAMOND ERA CONSTR. INC | General Contractor | 4 | 07/08/2026 |
| BREND RESTORATION LLC | General Contractor | 4 | 07/08/2026 |
| ANTHONY GIOVANNETTI | Electrical | 4 | 03/21/2026 |
| ROYAL HVAC SYSTEMS INC | General Contractor | 3 | 03/21/2026 |
| Z & GJ CONSTRUCTION CORP | General Contractor | 3 | 03/21/2026 |
| NICK VILLANI AND CO., INC | General Contractor | 3 | 03/21/2026 |
| BREAKING SOLUTIONS,INC | General Contractor | 3 | 03/21/2026 |
| K.I.M.CO. REFRIGERATION | General Contractor | 2 | 07/08/2026 |
| VG CONTRACTING INC | General Contractor | 2 | 07/08/2026 |
| PALLADIAN CONSTRUCTION | General Contractor | 2 | 07/08/2026 |
| INNOVATIVE HEATING SOLUTI | Plumbing | 2 | 07/08/2026 |
| M C M PLBG & HTG, INC | Plumbing | 2 | 07/08/2026 |
| GOTHAM LUXURY.GROUP LLC | General Contractor | 2 | 07/08/2026 |
| PRO STAR PLBG,HTG&MECH IN | Plumbing | 2 | 07/08/2026 |
| HAMILTON AIR COMPANY, INC. | General Contractor | 2 | 03/21/2026 |
| AZM HOME IMPROVEMENTS INC | General Contractor | 2 | 03/21/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 1 | 07/08/2026 |
| WAWEL PLBG AND HTG CORP | Plumbing | 1 | 07/08/2026 |
| A.C. MORGAN ELECTRIC | Electrical | 1 | 03/22/2026 |
| WYNNE PLBG & HEATING CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| A2 ARCHITECT, PC | 2504 | 6 | 04/24/2026 |
| MARK GOULD ARCHITECT | 1933 | 4 | 04/09/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 2 | 09/22/2025 |
| KARO ARCHITECTS LLP | 7725 | 3 | 09/17/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 1 | 04/01/2025 |
| ADS SPECIAL INSPECTIONS | 1270 | 1 | 03/19/2025 |
| SYNERGY ENGINEERING | 784 | 1 | 03/12/2025 |
| RAND ENGINEERING & ARCHIT | 266 | 7 | 03/12/2025 |
| D'ANTONIO CONSULTING ENGI | 931 | 4 | 08/31/2023 |
| CL ENGINEERING P.C. | 6781 | 2 | 05/11/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 09/29/2026 |
| DOB NOW | Plumbing | Signed-off | EZ RUNER CONSTRUCTION CORP | 06/03/2026 |
| DOB NOW | General Construction | Permit Issued | J & N DESIGN GROUP CORP | 05/22/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | KAY WATERPROOFING CORP. | 04/15/2026 |
| DOB NOW | Plumbing | Signed-off | GREGG NY PLUMBING, INC | 12/15/2025 |
| DOB NOW | General Construction | Signed-off | AZM HOME IMPROVEMENTS | 12/08/2025 |
| DOB NOW | Plumbing | Signed-off | MITIE PLUMBING & HTG CORP | 11/18/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 09/02/2025 |
| DOB NOW | Plumbing | Signed-off | MITIE PLUMBING & HTG CORP | 08/22/2025 |
| DOB NOW | General Construction | Signed-off | NICK VILLANI AND CO., INC | 08/20/2025 |
| DOB NOW | General Construction | Permit Issued | KAY WATERPROOFING CORP | 07/31/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | KAY WATERPROOFING CORP. | 04/15/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 10/07/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 09/05/2024 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 10/12/2023 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 09/08/2023 |
| DOB NOW | Plumbing | Signed-off | PRO STAR PLBG,HTG&MECH IN | 08/29/2023 |
| DOB NOW | General Construction | Signed-off | PAWLEY INTERIOR CONTRACTI | 06/14/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | MAJESTIC GC CORP | 05/23/2023 |
| DOB NOW | General Construction | Signed-off | PAWLEY INTERIOR CONTRACTI | 05/16/2023 |
| DOB NOW | General Construction | Signed-off | PAWLEY INTERIOR CONTRACTI | 01/31/2023 |
| DOB NOW | Plumbing | Signed-off | INNOVATION PLUMBING LLC | 08/17/2022 |
| DOB NOW | Plumbing | Signed-off | HI-TECH PLUMBING & HEATIN | 08/05/2022 |
| DOB NOW | Plumbing | Signed-off | WAWEL PLBG AND HTG CORP | 07/18/2022 |
| DOB NOW | General Construction | Signed-off | EMEK RENOVATION CORP | 06/16/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | MAJESTIC GC CORP | 06/13/2022 |
| DOB NOW | General Construction | Signed-off | GOTHAM LUXURY.GROUP LLC | 06/09/2022 |
| DOB NOW | Structural | Signed-off | GOTHAM LUXURY.GROUP LLC | 06/09/2022 |
| DOB NOW | Mechanical Systems | Signed-off | DIAMOND ERA CONSTR | 03/15/2022 |
| DOB NOW | Plumbing | Signed-off | M C M PLBG & HTG, INC | 01/31/2022 |
| DOB NOW | Plumbing | Signed-off | PRO STAR PLBG,HTG&MECH IN | 01/27/2022 |
| DOB NOW | Mechanical Systems | Signed-off | K.I.M.CO. REFRIGERATION | 01/24/2022 |
| DOB NOW | General Construction | Signed-off | PAWLEY INTERIOR CONTRACTI | 01/19/2022 |
| DOB NOW | Mechanical Systems | Signed-off | PAWLEY INTERIOR CONTRACTI | 01/13/2022 |
| DOB NOW | Plumbing | Signed-off | PROTO P & H SERVICES CORP | 01/13/2022 |
| DOB NOW | Plumbing | Signed-off | RUGOVA GROUP LLC | 12/10/2021 |
| DOB NOW | General Construction | Signed-off | NORMAN PROJECT MGMT LLC | 11/26/2021 |
| DOB NOW | Plumbing | Signed-off | NICE PLUMBING CORP | 11/23/2021 |
| DOB NOW | Plumbing | Signed-off | NICE PLUMBING CORP | 11/16/2021 |
| DOB NOW | Mechanical Systems | Signed-off | DIAMOND ERA CONSTR | 11/08/2021 |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/12/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/31/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/09/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/09/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/03/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 08/31/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/18/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/24/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/12/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/10/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/03/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/31/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/02/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/19/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/29/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/29/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/23/2021 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/17/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/23/2026 | Energy Code Compliance Inspections | — | progress |
| 07/23/2026 | Lighting in dwelling units | — | energy_progress |
| 07/23/2026 | Fenestration air leakage | — | energy_progress |
| 07/23/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 07/23/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 07/23/2026 | Mechanical Systems | — | special |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/23/2026 | Final | — | progress |
| 07/23/2026 | Fire-Resistance Rated Construction | — | progress |
| 04/13/2026 | Lighting in dwelling units | Ann Macklin | energy_progress |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | Ann Macklin | special |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | Ann Macklin | special |
| 04/13/2026 | Energy Code Compliance Inspections | Ann Macklin | progress |
| 04/10/2026 | Final | Ann Macklin | progress |
| 04/09/2026 | Fire-Resistant Penetrations and Joints | Mark Gould | special |
| 03/04/2026 | Lighting in dwelling units | Mark Gould | energy_progress |
| 03/04/2026 | Final | Mark Gould | progress |
| 03/04/2026 | Energy Code Compliance Inspections | Mark Gould | progress |
| 03/04/2026 | Fire-Resistant Penetrations and Joints | Mark Gould | special |
| 09/18/2025 | Final | Anke Roggenbuck | progress |
| 09/18/2025 | Tenant Protection Plan Compliance | NISCHAL ARJUNE | special |
| 09/18/2025 | Fire-Resistant Penetrations and Joints | Anke Roggenbuck | special |
| 09/16/2025 | Final | Anke Roggenbuck | progress |
| 09/16/2025 | Fire-Resistant Penetrations and Joints | Anke Roggenbuck | special |
| 09/16/2025 | Tenant Protection Plan Compliance | — | special |