← Back
BuildNYC
Office with apartments (no commercial)
230 EAST 144TH STREET
BRONX · Mott Haven-Port Morris · BIN 2000996
💬 Discuss this project
1931Year Built
3Stories
O8Building Class
M1-4/R6AZoning
5,415 sfGross Floor Area
4Units
1 Active Violation ▸
Office with apartments (no commercial) · Owner of record: F.M.T.C. Realty · 2,125 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofReplacement rooftop HVAC unit installation7p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
F.M.T.C. Realty603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering203/06/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nulite Fuel Oil CoGeneral Contractor203/21/2026
Nulite Fuel Oil CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808203/06/2023
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (2)Violation (3)Inspection (1)Special Inspection (4)
04/18/2023
Signed off — Alteration
X00822982-I1
04/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2023
Signed off — Alteration
INSTALL REPLACEMENT ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00822972-I1
03/08/2023
Permit issued — Plumbing
X00822982-I1-PL
03/08/2023
Permit issued — Mechanical Systems
X00822972-I1-MS
03/06/2023
Filed — Alteration
X00822982-I1
03/06/2023
Filed — Alteration
INSTALL REPLACEMENT ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00822972-I1
03/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
02/02/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
02/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
02/02/2023
Special inspection requirement — Final
Joseph Bazini
11/18/2014
Violation issued (HPD, open)
B
06/17/1983
Violation issued (HPD, closed)
A
05/07/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNulite Fuel Oil Co03/08/2023
DOB NOWMechanical SystemsSigned-offNulite Fuel Oil Co03/08/2023
BISPLISSUEDProgram Unlimited Plumbing & Heating09/27/2002
BISPLISSUEDProgram Unlimited Plumbing & Heating09/27/2002
BISPLISSUEDProgram Unlimited PLMG & Heating09/12/2002
BIS—ISSUEDN.I.S.E. General Restoring Building08/26/2002
BISMHISSUEDN.I.S.E. General Restoring Building08/06/2002
BISOTISSUEDF.M.T.C. Realty11/14/2000
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/06/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
02/02/2023Mechanical SystemsJoseph Bazinispecial
02/02/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
02/02/2023FinalJoseph Baziniprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026X00822982-I1Request digital key ↗
08/23/2026X00822972-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026X00822982-I1Open ↗
08/13/2026X00822972-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026X00822972-I1Open ↗
08/22/2026X00822972-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026X00822972-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00822982-I1Open ↗
08/13/2026X00822972-I1Open ↗