230 JAY STREET · BIN 3325916
💬 Discuss this project
1950Year Built
15Stories
D4Building Class
R7-1Zoning
883,265 sfGross Floor Area
1,026Units
LL97 CoveredRent Stabilized24 Active Violations 21 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Concord Village Owners · 313,647 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAkam Associates, INC.3p · 3 filings · 20 docs
Floor 16Unit 16F2p · 1 filing · 7 docs
Floor 15Unit 15E4p · 1 filing · 19 docs
Floor 14Unit 14A, Unit 14B, Unit 14E14p · 3 filings · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10Unit 10C6p · 1 filing · 7 docs
Floor 9
Floor 8Unit 8B2p · 1 filing · 12 docs
Floor 7
Floor 6
Floor 5Unit 5G7p · 2 filings · 12 docs
Floor 4
Floor 3
Floor 2Unit 2G10p · 2 filings · 10 docs
Floor 1Garbage area and sidewalk workUnder Construction1p · 1 filing · 2 docs
Site & exteriorAkam Associates, INC.Under Construction35p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Concord Village Owners4703/22/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Redline Construction & MaGeneral Contractor603/21/2026
Reg-ED ConstructionGeneral Contractor403/21/2026
Juno ContractingGeneral Contractor407/02/2026
Hello ChapterGeneral Contractor303/21/2026
Tindel Replacement Windowspecialty_contractor307/08/2026
Premier General ContractorsGeneral Contractor303/21/2026
Best Energy Power 2015General Contractor303/21/2026
Kings Group NYScaffold303/21/2026
Everest ScaffoldingScaffold307/08/2026
Able Steel & Ironworks, Ispecialty_contractor203/21/2026
KCM Plumbing & Heating CoPlumbing207/08/2026
Fco Property Maintenance*General Contractor203/21/2026
G.R. & J Hub Home ImproveGeneral Contractor204/09/2026
XH&RC Plumbing and HeatingPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
NTS ElectricalElectrical103/22/2026
P.S. Marcato Elev. CoElectrical103/21/2026
Ridge ElectricElectrical103/22/2026
TumenGeneral Contractor107/08/2026
Andamio ScaffoldingScaffold107/08/2026
Nophier Plumbing & HeatingPlumbing107/08/2026
Prostar Plumbing and HeatingPlumbing107/08/2026
Reliable Plumbing & HeatingPlumbing107/08/2026
Tri City Mechanical GroupPlumbing107/08/2026
Berger Quality Electrical ConElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803105/05/2026
Urban Pioneering Architects6521301/12/2026
James A Clancy9176102/21/2025
Jspecs9429208/19/2024
Hansen Engineering8174211/02/2023
Midtown Preservation Architects2634107/21/2023
Chen Engineering Services1826107/21/2023
G Engineering7778101/18/2023
AM Design Studio4413104/29/2021
Building Lifecycle
All (240)Filed (30)Permit Issued (30)Signed Off (15)Facade (FISP) (12)Violation (52)Inspection (17)Objection (54)Special Inspection (30)
10/06/2026
Permit issued — Suspended Scaffold
B01461536-I1-SC
09/17/2026
Filed — Alteration
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS.
B01461536-I1
08/18/2026
Signed off — Alteration
Complete window replacement throughout, no change to use, egress or occupancy.
B00791180-I1
05/18/2026
Permit issued — Curb Cut
B01384962-I1-CC
05/18/2026
Permit issued — General Construction
B01384927-I1-GC
05/05/2026
Filed — Alteration
NEW CURB CUT RELATED TO THE MODIFIED GARBAGE CONTAINERIZATION AREA AS REQUESTED BY THE NYC DEPARTMENT OF SANITATION.
B01384962-I1
05/05/2026
Filed — Alteration
MODIFICATION TO EXISTING CONTAINERIZATION/RECYCLING AREA AS REQUESTED BY THE NYC DEPARTMENT OF SANITATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01384927-I1
03/23/2026
Signed off — Alteration
THIS APPLICATION IS FOR PLUMBING WORK ASSOCIATED W/ APPLICATION B01074702-I1. THE PLUMBING WORK INCLUDES THE REPLACEMENT OF (3) BATHROOM FIXTURES & THE CAP & REMOVAL OF RANGE & SINK AT UNIT 14, & THE RELOCATION OF KITCHEN RANGE & SINK AT UNIT 15E.
B01074702-S2
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
02/03/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Admin
01/12/2026
Filed — Alteration
THIS APPLICATION IS FOR PLUMBING WORK ASSOCIATED W/ APPLICATION B01074702-I1. THE PLUMBING WORK INCLUDES THE REPLACEMENT OF (3) BATHROOM FIXTURES & THE CAP & REMOVAL OF RANGE & SINK AT UNIT 14, & THE RELOCATION OF KITCHEN RANGE & SINK AT UNIT 15E.
B01074702-P1
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
12/02/2025
Objection resolved — Addressed
12/01/2025
Objection raised — Admin
11/24/2025
Filed — Alteration
Complete window replacement throughout, no change to use, egress or occupancy.
B00791180-P2
10/23/2025
Signed off — Alteration
THIS APPLICATION IS FOR PLUMBING WORK ASSOCIATED W/ APPLICATION B01074702-I1. THE PLUMBING WORK INCLUDES THE REPLACEMENT OF (3) BATHROOM FIXTURES & THE CAP & REMOVAL OF RANGE & SINK AT UNIT 14, & THE RELOCATION OF KITCHEN RANGE & SINK AT UNIT 15E.
B01074702-I1
10/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/10/2025
Signed off — Alteration
THIS APPLICATION IS FOR PLUMBING WORK ASSOCIATED W/ APPLICATION B01074702-I1. THE PLUMBING WORK INCLUDES THE REPLACEMENT OF (3) BATHROOM FIXTURES & THE CAP & REMOVAL OF RANGE & SINK AT UNIT 14, & THE RELOCATION OF KITCHEN RANGE & SINK AT UNIT 15E.
B01074702-S1
09/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2025
Permit issued — Plumbing
B01074702-S2-PL
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/16/2025
Objection raised — Zoning
04/16/2025
Objection raised — Inspections
04/10/2025
Filed — Alteration
THIS APPLICATION IS FOR PLUMBING WORK ASSOCIATED W/ APPLICATION B01074702-I1. THE PLUMBING WORK INCLUDES THE REPLACEMENT OF (3) BATHROOM FIXTURES & THE CAP & REMOVAL OF RANGE & SINK AT UNIT 14, & THE RELOCATION OF KITCHEN RANGE & SINK AT UNIT 15E.
B01074702-S2
03/27/2025
Permit issued — Structural
B01074702-S1-ST
03/13/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01062285-I1
03/12/2025
Permit issued — General Construction
B01074702-I1-GC
03/07/2025
Permit issued — Solar
B01113519-I1-SL
03/03/2025
Signed off — Alteration
SELECT INTERIOR DEMOLITION AND RENOVATION OF A RESIDENTIAL SPACE TOTALING AROUND 1,050 SF.NO CHANGE IN USE OR OCCUPANCY.
B00681615-I1
02/21/2025
Filed — Alteration
Installation of PV System on existing roof top. No changes to the use egress or occupancy.
B01113519-I1
01/13/2025
Permit issued — General Construction
B00791180-I1-GC
01/01/2025
Permit issued — General Construction
B00791180-I1-GC
11/13/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01062285-P1
10/23/2024
Permit issued — General Construction
B00791180-I1-GC
10/11/2024
Permit issued — General Construction
B01084881-I1-GC
10/03/2024
Objection resolved — Addressed
10/03/2024
Objection resolved — Addressed
09/27/2024
Objection resolved — Addressed
09/26/2024
Objection resolved — Addressed
09/26/2024
Objection resolved — Addressed
09/26/2024
Objection resolved — Addressed
09/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
09/18/2024
Special inspection requirement — Final
James Clancy
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
09/18/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
09/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/10/2024
Objection resolved — Addressed
09/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Special inspection requirement — Lighting in dwelling units
James Hill
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
Latest 60 of 240 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management10/06/2026
DOB NOWCurb CutPermit IssuedJuno Contracting05/18/2026
DOB NOWGeneral ConstructionPermit IssuedJuno Contracting05/18/2026
DOB NOWPlumbingSigned-offReliable Plumbing & Heating05/07/2025
DOB NOWStructuralSigned-offG.R. & J Hub Home Improve03/27/2025
DOB NOWGeneral ConstructionSigned-offG.R. & J Hub Home Improve03/12/2025
DOB NOWSolarPermit IssuedBest Energy Power 201503/07/2025
DOB NOWGeneral ConstructionSigned-offTindel Replacement Window01/13/2025
DOB NOWGeneral ConstructionSigned-offTindel Replacement Window01/01/2025
DOB NOWGeneral ConstructionSigned-offTindel Replacement Window10/23/2024
DOB NOWGeneral ConstructionPermit IssuedHello Chapter10/11/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding06/07/2024
DOB NOWPlumbingPermit IssuedProstar Plumbing and Heating04/10/2024
DOB NOWGeneral ConstructionPermit IssuedRedline Construction & Ma04/03/2024
DOB NOWPlumbingPermit IssuedFlavio Mechanical03/22/2024
DOB NOWGeneral ConstructionPermit IssuedPremier General Contractors11/22/2023
DOB NOWGeneral ConstructionSigned-offJuno Contracting10/27/2023
DOB NOWGeneral ConstructionPermit IssuedFco Property Maintenance*08/14/2023
DOB NOWSidewalk ShedSigned-offKings Group NY07/28/2023
DOB NOWPlumbingPermit IssuedNophier Plumbing & Heating07/25/2023
DOB NOWPlumbingSigned-offKCM Plumbing & Heating Co07/21/2023
DOB NOWGeneral ConstructionSigned-offReg-ED Construction08/19/2022
DOB NOWGeneral ConstructionSigned-offReg-ED Construction05/05/2022
DOB NOWPlumbingSigned-offKCM Plumbing & Heating Co02/07/2022
DOB NOWGeneral ConstructionSigned-offRedline Construction & Ma12/15/2021
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating11/30/2021
DOB NOWGeneral ConstructionSigned-offTumen11/19/2021
DOB NOWGeneral ConstructionSigned-offAble Steel Ironworks I04/26/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/16/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/26/2018
BISOTISSUEDJuno Contracting03/26/2021
BISOTISSUEDJuno Contracting01/30/2020
BISPLISSUEDKCM Plumbing & Heating Co01/06/2020
BISOTRE-ISSUEDRedline Construction & Ma07/03/2019
BISOTISSUEDJuno Contracting05/13/2019
BISPLISSUEDTop Plumbing Group06/18/2018
BISOTISSUEDAlb-Brothers Construction06/12/2018
BISOTISSUEDJuno Contracting03/29/2018
BISOTISSUEDYK Sung03/20/2018
BISPLISSUEDAqueduct Mechanical10/19/2016
+ 20 more permits on file
1 project · most recent 11/02/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/02/2023Permit IssuedTri City Mechanical GroupGas, Water/Sanitary
20 projects · most recent 05/07/2026
General Wiring
FiledStatusContractorScope
05/07/2026CompleteJ.A. Lee Electric Services—
11/13/2025CompleteBerger Quality Electrical Con—
03/20/2025CompleteNyco ElectricGeneral Wiring
06/14/2024CompleteBorowide Elect'l Contractors—
04/11/2024Permit IssuedM & M Control WiringGeneral Wiring
01/09/2024Permit IssuedAccurate ElectricalGeneral Wiring
09/21/2023Permit IssuedMar-Kam Electrical ContractingGeneral Wiring
09/09/2023Permit IssuedMar-Kam Electrical ContractingGeneral Wiring
08/11/2023CompleteHigh Quality Electric of—
07/26/2023Permit IssuedSega ElectricGeneral Wiring
04/21/2022CompleteRobert Chimenti—
10/04/2021Permit IssuedRidge ElectricGeneral Wiring
03/25/2020CompleteJubilee Electrical Service Co—
01/02/2020CompleteK & R Electric CoGeneral Wiring
09/25/2019Permit IssuedJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 02/21/2025
FiledStatusContractorScope
02/21/2025Permit IssuedBest Energy Power 2015138 panels, 57.96 kw, 50,400 roof_area_sqft
1 project · most recent 09/17/2026
FiledStatusContractorScope
09/17/2026Permit IssuedCentral Construction Management—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
10/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
02/10/2026Fire-Resistant Penetrations and JointsJames Hillspecial
12/23/2025Fire-Resistant Penetrations and JointsJames Hillspecial
09/18/2024Structural Stability – Alterations of existing buildingsJames Clancyspecial
09/18/2024FinalJames Clancyprogress
09/18/2024Energy Code Compliance InspectionsJames Clancyprogress
09/18/2024Fire-Resistant Penetrations and JointsJames Clancyspecial
09/18/2024Air barrier - visual inspectionJames Clancyenergy_progress
09/09/2024Lighting in dwelling unitsJames Hillenergy_progress
09/09/2024Fire-Resistant Penetrations and JointsJames Hillspecial
09/09/2024Energy Code Compliance InspectionsJames Hillprogress
08/05/2024Structural Steel - High Strength BoltingJeffrey Stonesspecial
08/05/2024Structural Steel - DetailsJeffrey Stonesspecial
08/05/2024Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
08/05/2024Post-installed AnchorsJeffrey Stonesspecial
08/05/2024Structural Steel - WeldingJeffrey Stonesspecial
07/23/2024Energy Code Compliance InspectionsDionisio Cortes Ortegaprogress
07/23/2024Fire-Resistance Rated ConstructionDionisio Cortes Ortegaprogress
07/23/2024FinalJeffrey Stonesprogress
07/23/2024FinalDionisio Cortes Ortegaprogress
07/23/2024Interior lighting powerDionisio Cortes Ortegaenergy_progress
07/01/2024Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
11/06/2023Lighting in dwelling unitsRyan Hansenenergy_progress
11/06/2023MeteringRyan Hansenenergy_progress
11/06/2023HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
09/13/2023FinalRyan Hansenprogress
Latest 25 of 43.
▾Documents — 402 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
10/07/2026B01461536-I1Request digital key ↗
09/02/2026B00081199-I1Request digital key ↗
09/01/2026B00478003-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION34
06/27/2023300536043Open ↗
06/22/2023300536043Open ↗
06/01/2023300536043Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION26
02/01/2020322005600Open ↗
01/07/2020321928303Open ↗
07/08/2019321928303Open ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications114
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
02/01/2020322005600Open ↗
05/15/2019321791192Open ↗
04/11/2019321730052Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00081199-I1Open ↗
09/01/2026B00478003-I1Open ↗
09/01/2026B00495096-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/22/2026B00789953-I1Open ↗
09/02/2026B08048979-I1Open ↗
09/02/2026B08048979-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026B08048979-I1Open ↗
09/01/2026B01074702-I1Open ↗
09/01/2026B01074702-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/13/2018321736207Open ↗
08/31/2012320548653Open ↗
06/22/2012320494648Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/31/2012320548653Open ↗
06/22/2012320494648Open ↗
Showing 2 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
03/13/2018321736207Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/13/2018340639848Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/13/2018340639848Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/13/2018340639848Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING6
06/02/2011320315093Open ↗
Showing 1 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT3
12/03/2014320781374Open ↗
12/03/2014320781374Open ↗
12/03/2014320781374Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/05/2019321928303Open ↗
03/30/2018321730052Open ↗
08/15/2016321436727Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes7
11/06/2019322005600Open ↗
03/05/2019321928303Open ↗
06/28/2018321791192Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/01/2026B00495096-P1Open ↗
09/01/2026B00495096-I1Open ↗
09/01/2026B00495064-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/06/2019322005600Open ↗
04/11/2019321730052Open ↗
03/05/2019321928303Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
05/16/2012320477854Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
06/02/2011320315093Open ↗
Showing 1 of 4 on file for this type
▸Energy Compliance32
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
11/06/2019322005600Open ↗
04/11/2019321730052Open ↗
03/22/2019321730052Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
02/17/2022321791192Open ↗
02/03/2022322005600Open ↗
03/22/2019321730052Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00495064-I1Open ↗
08/13/2026B00622962-I1Open ↗
08/29/2026B00681615-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/03/2014320781374Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/16/2012320477854Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/17/2022321791192Open ↗
02/03/2022322005600Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/21/2011320315093Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/21/2011320315093Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
02/18/2022321791192Open ↗
02/04/2022322005600Open ↗
04/11/2019321730052Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
02/19/2016321313459Open ↗
08/31/2012320548653Open ↗
06/20/2012320494648Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/13/2012320548653Open ↗
07/25/2012320477854Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/28/2020300536043Open ↗
05/21/2020300536043Open ↗
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT31
02/17/2022321791192Open ↗
02/03/2022322005600Open ↗
03/22/2019321730052Open ↗
Showing 3 of 31 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
04/18/2012320206371Open ↗
07/22/2011320315093Open ↗
Showing 2 of 7 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
06/21/2012320494648Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET17
03/05/2019321928303Open ↗
06/28/2018321791192Open ↗
03/29/2018321730052Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION6
06/28/2021300536043Open ↗
12/10/2020321928303Open ↗
10/13/2018340639848Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
04/15/2020300536043Open ↗
04/11/2019321730052Open ↗
03/22/2019321730052Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2018340639848Open ↗
▸Other Documents4
▸BISUnknown3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWIRA Certification1
10/07/2026B01461536-I1Open ↗