← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Riverway Apartments
230 RIVERDALE AVENUE · Brownsville · BIN 3413856
💬 Discuss this project
2011Year Built
7Stories
D1Building Class
R6Zoning
96,671 sfGross Floor Area
115Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Riverway Apartments · 22,000 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarHorrigan Development LLC23p · 2 filings · 14 docs
Site & exteriorSidewalk shed lighting installation22p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Horrigan Development1303/22/2026
Ska Marin303/22/2026
Riverway Apts303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf411/17/2025
Superstructures Engineering +109/23/2025
Robert Ettinger, P.E.405/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning803/21/2026
Superstructures Engineering +103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK Construction ServicesGeneral Contractor303/21/2026
BK Construction ServicesScaffold307/08/2026
Miller Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
360 Engineering7496109/23/2025
Big Apple Group NY A Rma9168201/18/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/02/2026
Signed off — Alteration
B01287337-I1
08/19/2026
Elevator Category 1 inspection report filed
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-S2
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-S1
81 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offBK Construction Services11/18/2025
DOB NOWConstruction FenceSigned-offBK Construction Services11/05/2025
DOB NOWGeneral ConstructionSigned-offBK Construction Services10/17/2025
DOB NOWSidewalk ShedSigned-offBK Construction Services09/19/2025
DOB NOWBoiler EquipmentSigned-offMiller Plumbing & Heating12/30/2021
DOB NOWPlumbingSigned-offMiller Plumbing & Heating12/28/2021
1 project · most recent 05/16/2022
Gas
FiledStatusContractorScope
05/16/2022Signed-offMiller Plumbing & HeatingGas
3 projects · most recent 10/09/2025
FiledStatusContractorScope
10/09/2025Permit IssuedHigh Quality Electric of NYC—
07/27/2025CompleteTesla Electric—
04/05/2021Permit IssuedAbilene Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/19/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/19/2022Heating SystemsSOORJBALLY HARILALLspecial
01/19/2022HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
01/19/2022HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
01/19/2022Maintenance informationSoorjbally Harilallenergy_progress
01/14/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/14/2022Heating SystemsSOORJBALLY HARILALLspecial
01/14/2022HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
01/14/2022Maintenance informationSoorjbally Harilallenergy_progress
01/14/2022HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account