← Back
Condo, residential unit in elevator building
The 230 Riveside Condominium
230 RIVERSIDE DRIVE · BIN 1034187
💬 Discuss this project
1931Year Built
19Stories
R4Building Class
R10AZoning
183,177 sfGross Floor Area
259Units
LL97 CoveredRent Stabilized93 Open Violations 92 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: THE 230 RIVERSIDE CONDOMINUM · 16,028 sf lot · 11.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Bulkhead1p · 1 filing · 4 docs
Floor 321p · 1 filing · 10 docs
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 185p · 1 filing · 5 docs
Floor 17
Floor 16Under Construction3p · 2 filings · 13 docs
Floor 15Under Construction9p · 1 filing · 14 docs
Floor 14
Floor 13
Floor 12Under Construction3p · 2 filings · 20 docs
Floor 11
Floor 10Under Construction1 filing · 12 docs
Floor 9
Floor 85p · 2 filings · 15 docs
Floor 7
Floor 63p · 1 filing · 9 docs
Floor 510p · 1 filing · 6 docs
Floor 4
Floor 3
Floor 23p · 1 filing · 15 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R A COHEN ASSOC6307/08/2026
THE 230 RIVESIDE CONDOMINIUM4903/22/2026
230 RIVERSIDE DRIVE LLC403/22/2026
OWNER OF PREMISES 230 RIV103/22/2026
BIG Z BUILDERS INC DBA AR103/22/2026
BIG Z BUILDERS INC DEA AR103/22/2026
230 RIVERSIDE DR. OWNERS103/22/2026
239 RIVERSIDE DR. OWNERS103/22/2026
RIVERSIDE HOLDING CO.1103/22/2026
REVERSIDE HOLDING LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.3703/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
AE DESIGN SOLUTION403/21/2026
QUICK FILING OF NY INC103/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
CODE203/21/2026
DINA VEDMED ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor1307/08/2026
FREEDOM GS INCGeneral Contractor1309/26/2026
ACCURATE MECHANICAL INCPlumbing907/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor707/08/2026
SKY TOUCH RENOVATION INCGeneral Contractor603/21/2026
INTERIOR MASTERS GROUP OFGeneral Contractor303/21/2026
RENOVATION PARTNERS INCGeneral Contractor303/21/2026
SKYLINE RESTORATION INCGeneral Contractor307/08/2026
STOVALL, DARRYLElectrical303/21/2026
GEORGIOS RODASElectrical203/21/2026
NEXT GENERATION RESTORATIONGeneral Contractor207/08/2026
AMM GEN'L CONTRACTING INCPlumbing208/30/2026
BEST INTERIORS MGMT CO INCGeneral Contractor203/21/2026
POWER SURGE ELECTRIC, INCElectrical203/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
SUPERB PLUMBING & HEATINGPlumbing109/12/2026
ALEF ELEC'L CONTR'G INCElectrical103/22/2026
ZFM INCPlumbing107/08/2026
CHRISTOPHER STABILEElectrical103/21/2026
ENTERPRISE ELEC'L SYSTEMSElectrical103/22/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
JIMENEZ LUISElectrical103/21/2026
KRUGER, JAMESElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544708/28/2026
GLICKMAN SCHLESINGER ARCH67681806/08/2026
VILLA PEX CONSULTING ENGI8408103/23/2026
ANNA JACHNIK ARCHITECT4202103/04/2026
CHANDA ENG. CONSULTANT PC6842107/11/2025
FRAMEWORK ENGINEERING PC8217110/24/2024
DELACOUR, FERRARA & CHURC4041206/07/2024
RICHARD KRESHTOOL ARCHITE2867411/15/2023
METRIC CONSULTING AND INS1803205/02/2023
CATALPA SPECIAL INSPECTIO2004205/02/2023
Building Lifecycle
All (271)Filed (53)Permit Issued (49)Signed Off (26)Facade (FISP) (12)Violation (60)Inspection (27)Objection (14)Special Inspection (30)
09/25/2026
Permit issued — General Construction
M01446243-I1-GC
09/10/2026
Permit issued — Plumbing
M01361147-S1-PL
08/28/2026
Filed — Alteration
INTERIOR PARTITION CHANGES ACCORDING TO DRAWINGS. INSTALL NEW FLOORING. NO CHANGE TO USE OR EGRESS.
M01446071-I1
08/27/2026
Permit issued — Plumbing
M01251096-I1-PL
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Final
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Lighting in dwelling units
EUGENE BIFULCO
07/13/2026
Signed off — Alteration
Installation of split system air conditioning comprising rooftop condensing units and interior ductless air handlers to provide cooling for elevator machine rooms.
M01370130-I1
06/26/2026
Permit issued — General Construction
M01398699-S1-GC
06/23/2026
Permit issued — Plumbing
M01398699-I1-PL
06/08/2026
Filed — Alteration
Plumbing work in Apartment 15N, including demolition, installation, and connections. NO CHANGE TO USE OR EGRESS
M01398699-S1
05/29/2026
Filed — Alteration
Plumbing work in Apartment 15N, including demolition, installation, and connections. NO CHANGE TO USE OR EGRESS
M01398699-I1
05/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Adam Glickman
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Adam Glickman
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adam Glickman
05/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Adam Glickman
05/29/2026
Special inspection requirement — Fenestration air leakage
Adam Glickman
05/29/2026
Special inspection requirement — Lighting controls
Adam Glickman
05/29/2026
Special inspection requirement — Fenestration areas
Adam Glickman
05/29/2026
Special inspection requirement — Lighting in dwelling units
Adam Glickman
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Adam Glickman
05/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
05/15/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/08/2026
Special inspection requirement — Final
Adam Glickman
05/07/2026
Permit issued — Mechanical Systems
M01370130-I1-MS
04/27/2026
Signed off — Alteration
Plumbing work in Apartment 15K, including demolition, installation, and connection of fixtures and piping
M01267524-I1
04/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/27/2026
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/24/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Objection resolved — Addressed
03/23/2026
Filed — Alteration
Installation of split system air conditioning comprising rooftop condensing units and interior ductless air handlers to provide cooling for elevator machine rooms.
M01370130-I1
03/23/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Admin
03/17/2026
Signed off — Alteration
M01267377-I1
03/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Structural
03/11/2026
Objection raised — Plumbing
03/11/2026
Objection raised — Plumbing
03/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Filed — Alteration
plumbing work in conjunction with apartments 16fg and 16j combination at 16th floor
M01361147-I1
03/04/2026
Filed — Alteration
plumbing work in conjunction with apartments 16fg and 16j combination at 16th floor
M01361147-S1
03/01/2026
Violation issued (HPD, closed)
A
03/01/2026
Violation issued (HPD, closed)
C
02/27/2026
Violation issued (HPD, closed)
B
02/27/2026
Violation issued (HPD, closed)
C
02/27/2026
Violation issued (HPD, closed)
B
02/17/2026
Special inspection requirement — Final
Anna Jachnik
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anna Jachnik
02/10/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/10/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/03/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/19/2026
Violation issued (HPD, closed)
B
Latest 60 of 271 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFREEDOM GS INC09/25/2026
DOB NOWPlumbingPermit IssuedSUPERB PLUMBING & HEATING09/10/2026
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC08/27/2026
DOB NOWGeneral ConstructionPermit IssuedFREEDOM GS INC06/26/2026
DOB NOWPlumbingPermit IssuedACCURATE MECHANICAL INC06/23/2026
DOB NOWMechanical SystemsSigned-offCORNERSTONE MECHANICAL IN05/07/2026
DOB NOWGeneral ConstructionPermit IssuedFREEDOM GS01/05/2026
DOB NOWGeneral ConstructionSigned-offFREEDOM GS10/27/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO09/03/2025
DOB NOWGeneral ConstructionSigned-offFREEDOM GS08/21/2025
DOB NOWGeneral ConstructionPermit IssuedNEXT GENERATION RESTORATI08/12/2025
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC08/11/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO05/21/2025
DOB NOWGeneral ConstructionSigned-offSKY TOUCH RENOVATION INC01/23/2025
DOB NOWGeneral ConstructionSigned-offNEXT GENERATION RESTORATI01/23/2025
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC08/09/2024
DOB NOWGeneral ConstructionSigned-offSKY TOUCH RENOVATION INC07/10/2024
DOB NOWGeneral ConstructionSigned-offFREEDOM GS10/26/2023
DOB NOWStructuralSigned-offSKYLINE RESTORATION INC10/05/2023
DOB NOWConstruction FencePermit IssuedSPRING SCAFFOLDING LLC08/29/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC08/17/2023
DOB NOWGeneral ConstructionSigned-offCREO PROJECTS LLC05/22/2023
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP05/22/2023
DOB NOWGeneral ConstructionSigned-offINTERIOR MASTERS GROUP OF05/17/2023
DOB NOWGeneral ConstructionSigned-offFREEDOM GS03/01/2023
DOB NOWPlumbingPermit IssuedANTHONY DISABATO03/01/2023
DOB NOWPlumbingPermit IssuedANTHONY DISABATO12/01/2022
DOB NOWPlumbingSigned-offANTHONY DISABATO12/01/2022
DOB NOWGeneral ConstructionSigned-offFREEDOM GS11/28/2022
DOB NOWGeneral ConstructionSigned-offFREEDOM GS11/15/2022
DOB NOWPlumbingSigned-offANTHONY DISABATO11/15/2022
DOB NOWGeneral ConstructionSigned-offFREEDOM GS10/28/2022
DOB NOWGeneral ConstructionSigned-offFREEDOM GS09/22/2022
DOB NOWGeneral ConstructionSigned-offBEST INTERIORS MGMT CO IN02/08/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/21/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/15/2021
DOB NOWConstruction FenceSigned-offANDAMIO SCAFFOLDING LLC09/14/2021
DOB NOWConstruction FenceSigned-offEVEREST SCAFFOLDING INC07/12/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/09/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC05/25/2021
+ 59 more permits on file
1 project · most recent 03/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2026Signed-offCORNERSTONE MECHANICAL INHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-GX18NL 18,000 BTU · Fan Coil Indoor ×4
MXZ-5D36NL 36,000 BTU · Vrf Outdoor ×2
8 projects · most recent 08/28/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/28/2026——Gas, Water/Sanitary
06/08/2026Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
03/04/2026Permit IssuedSUPERB PLUMBING & HEATINGWater/Sanitary
12/09/2025——Gas, Water/Sanitary
09/16/2025Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
07/11/2025Signed-offAMM GEN'L CONTRACTING INCGas, Water/Sanitary
02/28/2024Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
09/17/2020Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
25 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Pending Payment VerificationRM ELECTRIC CO., INC.General Wiring
09/25/2026Permit IssuedRM ELECTRIC CO., INC.General Wiring
09/14/2026CompleteA&L ELECTRIC & AUTOMATION—
06/16/2026CompletePJZ MAINTENANCE CORP.General Wiring
04/22/2026CompleteARMA ELECTRIC INCGeneral Wiring
11/17/2025CompleteK & G ELECTRIC CO., INCGeneral Wiring
10/10/2025Permit IssuedALL WAYS ELECTRIC CORP.W—
09/22/2025Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
09/12/2025Pending Payment VerificationCENTENNIAL ELEVATOR INDUSGeneral Wiring
11/20/2024CompleteGRX EURO ELECTRIC CORP—
10/30/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/03/2024Permit IssuedHYLAN DATACOM & ELECL LLC2 meters, 1 new_meters
08/11/2024CompleteCRONOS FIRE AND ELECTRICAGeneral Wiring
02/20/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
11/06/2023CompleteARMA ELECTRIC INC41 meters, 4 new_meters
1 project · most recent 08/29/2023
Fence
FiledStatusContractorScope
08/29/2023Permit IssuedSPRING SCAFFOLDING LLCFence
2 projects · most recent 07/11/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/11/2025Permit IssuedNEXT GENERATION RESTORATITenant Protection Plan 72 Hour
07/11/2025Signed-offAMM GEN'L CONTRACTING INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
05/15/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/24/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/10/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/03/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/08/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
08/14/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/14/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/14/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
08/14/2026FinalEUGENE BIFULCOprogress
08/14/2026Lighting controlsEUGENE BIFULCOenergy_progress
08/14/2026Lighting in dwelling unitsEUGENE BIFULCOenergy_progress
08/14/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
05/29/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
05/29/2026Fire-Resistant Penetrations and JointsAdam Glickmanspecial
05/29/2026Fenestration air leakageAdam Glickmanenergy_progress
05/29/2026Lighting in dwelling unitsAdam Glickmanenergy_progress
05/29/2026Fenestration areasAdam Glickmanenergy_progress
05/29/2026Fenestration and door U-factor and product ratingsAdam Glickmanenergy_progress
05/29/2026Lighting controlsAdam Glickmanenergy_progress
05/29/2026Fire-Resistance Rated ConstructionAdam Glickmanprogress
05/29/2026Energy Code Compliance InspectionsAdam Glickmanprogress
05/28/2026Fire-Resistant Penetrations and JointsAdam Glickmanspecial
05/28/2026Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
05/08/2026FinalAdam Glickmanprogress
02/17/2026Fire-Resistant Penetrations and JointsAnna Jachnikspecial
02/17/2026FinalAnna Jachnikprogress
12/08/2025Fire-Resistant Penetrations and JointsLauren Schlesingerspecial
12/08/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
09/10/2025Fire-Resistant Penetrations and JointsAdam Glickmanspecial
08/14/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
Latest 25 of 99.
▾Documents — 1,208 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch40
09/21/2026M01446071-S1Request digital key ↗
09/21/2026M01446071-I1Request digital key ↗
09/03/2026M00654292-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold7
09/05/2026M00266098-I1Request digital key ↗
09/05/2026M00266098-P2Request digital key ↗
09/05/2026M00266098-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00397520-I1Request digital key ↗
09/04/2026M00397468-I1Request digital key ↗
09/04/2026M00397468-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00174597-I1Request digital key ↗
09/04/2026M00368520-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00238039-I1Request digital key ↗
09/04/2026M00368526-I1Request digital key ↗
▸Applications & Permits247
▸BISPLAN / WORK APPROVAL APPLICATION112
05/04/2022123878884Open ↗
12/28/2021123815283Open ↗
12/28/2021123815283Open ↗
Showing 3 of 112 on file for this type
▸BISWORK PERMIT APPLICATION96
05/04/2022123878884Open ↗
02/26/2021123815283Open ↗
09/04/2020140946136Open ↗
Showing 3 of 96 on file for this type
▸DOB NOWLPC Approval/Permit39
09/21/2026M01446071-I1Open ↗
09/01/2026M08029408-I1Open ↗
08/27/2026M08022422-I1Open ↗
Showing 3 of 39 on file for this type
▸Seals & Professional Certifications272
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION90
05/01/2020123878875Open ↗
05/01/2020123878875Open ↗
02/05/2020123679625Open ↗
Showing 3 of 90 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature54
09/21/2026M01446071-S1Open ↗
09/21/2026M01446071-I1Open ↗
09/05/2026M00266098-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/23/2026M01446071-S1Open ↗
09/23/2026M01446071-I1Open ↗
09/23/2026M08022422-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/22/2026M08029401-I1Open ↗
09/22/2026M08029401-I1Open ↗
09/22/2026M08029401-I1Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
05/01/2020123878875Open ↗
Showing 1 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
05/01/2020123878875Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment69
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE37
01/03/2020123679625Open ↗
01/03/2020123679643Open ↗
12/26/2019123679643Open ↗
Showing 3 of 37 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection33
▸BISTenant Protection Plan and Notes16
05/15/2020123878884Open ↗
05/01/2020123878875Open ↗
01/02/2020104368612Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWTenant Protection Plan13
09/05/2026M00266098-P2Open ↗
09/05/2026M00266098-I1Open ↗
09/05/2026M00266098-P1Open ↗
Showing 3 of 13 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos91
▸DOB NOWDEP ACP-5: Asbestos Assessment Report42
09/21/2026M01446071-S1Open ↗
09/21/2026M01446071-I1Open ↗
09/04/2026M00397520-I1Open ↗
Showing 3 of 42 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
05/15/2020123878884Open ↗
Showing 3 of 25 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance87
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS42
05/01/2020123878875Open ↗
02/05/2020123679625Open ↗
02/05/2020123679625Open ↗
Showing 3 of 42 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
02/05/2020123679625Open ↗
01/13/2020123679643Open ↗
Showing 2 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/19/2021140946136Open ↗
09/04/2020140946136Open ↗
09/04/2020140946092Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/03/2022123878875Open ↗
05/03/2022123878884Open ↗
04/29/2022123827591Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY13
05/24/2022123815283Open ↗
05/19/2021140946136Open ↗
05/03/2021123878884Open ↗
Showing 3 of 13 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS3
05/03/2022123878875Open ↗
05/03/2022123878884Open ↗
04/29/2022123827591Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
05/03/2022123878875Open ↗
05/03/2022123878884Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
05/03/2022123878875Open ↗
05/03/2022123878884Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMASONRY1
04/29/2022123827591Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/26/2021123815283Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
05/31/2022123878884Open ↗
▸Approvals, Objections & Sign-offs105
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST36
06/03/2022123878884Open ↗
05/25/2022123815283Open ↗
05/18/2022123827591Open ↗
Showing 3 of 36 on file for this type
▸BISLANDMARKS APPROVAL28
05/18/2022123827591Open ↗
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
05/04/2022123878884Open ↗
Showing 1 of 13 on file for this type
▸BISLANDMARKS SIGNOFF5
06/03/2022123878884Open ↗
05/25/2022123815283Open ↗
05/04/2022123827591Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL4
05/24/2022123815283Open ↗
05/03/2022123878875Open ↗
05/03/2022123878884Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
06/05/2020123827591Open ↗
Showing 1 of 3 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership87
▸BISCOST AFFIDAVIT77
05/16/2022123827591Open ↗
07/09/2021123827591Open ↗
09/01/2020140946136Open ↗
Showing 3 of 77 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
05/24/2022123815283Open ↗
05/03/2022123878875Open ↗
05/03/2022123878884Open ↗
Showing 3 of 5 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms116
▸BISADDITIONAL INFORMATION40
05/18/2022123827591Open ↗
12/28/2021123815283Open ↗
07/13/2021123815283Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING COVER SHEET36
05/04/2020123878875Open ↗
05/01/2020123878884Open ↗
Showing 2 of 36 on file for this type
▸BISBOROUGH INTAKE FORM34
05/04/2022123878884Open ↗
06/05/2020123827591Open ↗
05/01/2020123878884Open ↗
Showing 3 of 34 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
Showing 2 of 6 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
05/02/2022123878884Open ↗
09/01/2020140946136Open ↗
09/01/2020140946092Open ↗
Showing 3 of 10 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building3
09/03/2026M00654292-I1Open ↗
Showing 1 of 3 on file for this type