← Back
Elevator apt, semi-fireproof without stores
230 WEST 107 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1056644
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R8BZoning
49,716 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized32 Open Violations 31 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: 230 W 107 STREET LLC · 12,615 sf lot · 3.94 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 2 filings · 20 docs
Floor 61p · 1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar4p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI HILL MANAGEMENT707/02/2026
WKR CONSTRUCTION504/09/2026
230 W 107 STREET LLC4303/22/2026
230 W 107 STREET LLC ATTE1403/22/2026
23 W 107 STREET LLC103/22/2026
230 W/07 STREET LLC/AHUVA103/22/2026
220 W 107 STREET LLC403/22/2026
230 WEST 107 STREET LLC1203/22/2026
230 WEST 107 LLC303/22/2026
203 W 107 ST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2018$37.8M—230 WEST 107 LLC → 230 W 107 STREET LLC$759/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS403/21/2026
GILMAN CONSULTANT403/21/2026
SNR EXPEDITING DESIGN203/21/2026
NEXUS CONSULTING NYC, INC403/21/2026
QUICK FILING OF NY INC103/21/2026
Rigid Structural Design, LLC103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
QUICK FILING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor707/02/2026
SENAD MEHOVICElectrical603/21/2026
WKR CONSTRUCTION, INCGeneral Contractor507/08/2026
D.J.DEMA PAINTING CORPGeneral Contractor307/08/2026
KEVIN GEOGHEGANElectrical203/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor204/09/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
TROADIO MENENDEZElectrical103/21/2026
CEESAY, BELALElectrical103/21/2026
CARA PLUMBING GROUP INCPlumbing107/08/2026
CHEUNG, KEUNGElectrical103/21/2026
RAPPO, FRANKElectrical103/21/2026
ROMA IRON WORKERS INCElectrical103/21/2026
SANG CHEUNGElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658206/01/2026
SURFACE DESIGN PROFESSION3968206/01/2026
FRANCISCO D. PEREZ PE3306204/29/2024
Building Lifecycle
All (144)Filed (12)Permit Issued (18)Signed Off (7)Facade (FISP) (21)Violation (60)Inspection (1)Objection (6)Special Inspection (19)
09/04/2026
Violation issued (HPD, open)
B
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
A
08/11/2026
Cycle 9 facade report signed — SWARMP
08/06/2026
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00923218-I1
07/14/2026
Cycle 9 facade report submitted
07/08/2026
Cycle 9 facade inspection completed
06/30/2026
Permit issued — Sidewalk Shed
M00861790-I1-SH
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
06/16/2026
Special inspection requirement — Air barrier - visual inspection
MOLLY FORR
06/16/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
06/16/2026
Special inspection requirement — Final
Benson Gillespie
06/16/2026
Special inspection requirement — Masonry
MOLLY FORR
06/01/2026
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00923218-P1
05/30/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Special inspection requirement — Air barrier - visual inspection
MOLLY FORR
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
04/29/2026
Special inspection requirement — Post-installed Anchors
MOLLY FORR
04/29/2026
Special inspection requirement — Final
Benson Gillespie
04/29/2026
Special inspection requirement — Masonry
MOLLY FORR
04/27/2026
Permit issued — Sidewalk Shed
M00861790-I1-SH
03/11/2026
Signed off — Alteration
M01106716-I1
03/11/2026
Permit issued — General Construction
M00923218-I1-GC
02/16/2026
Signed off — Alteration
File-SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FAADE RESTORATION AND INSPECTION. ALSO, INSTALL MATERIAL HOIST ON ROOF.
M01027052-I1
01/12/2026
Cycle 9 facade report submitted
01/12/2026
Cycle 9 facade report signed — UNSAFE
12/30/2025
Violation issued (HPD, closed)
C
12/30/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, open)
B
12/11/2025
Cycle 9 facade inspection completed
12/09/2025
Signed off — Alteration
M01046631-I1
11/28/2025
Violation issued (HPD, closed)
C
10/01/2025
Permit issued — Sidewalk Shed
M01046631-I1-SH
08/30/2025
Violation issued (HPD, closed)
B
08/30/2025
Violation issued (HPD, closed)
B
06/24/2025
Violation issued (HPD, closed)
B
05/19/2025
Violation issued (HPD, closed)
A
04/28/2025
Permit issued — Sidewalk Shed
M00861790-I1-SH
04/11/2025
Permit issued — General Construction
M00923218-I1-GC
04/10/2025
Permit issued — Supported Scaffold
M01106716-I1-SF
04/10/2025
Permit issued — Suspended Scaffold
M01027052-I1-SC
10/28/2024
Permit issued — Sidewalk Shed
M01046631-I1-SH
10/16/2024
Cycle 9 facade report submitted
10/16/2024
Cycle 9 facade report signed — UNSAFE
10/07/2024
Permit issued — Supported Scaffold
M01106716-I1-SF
10/03/2024
Cycle 9 facade inspection completed
09/30/2024
Filed — Alteration
M01106716-I1
08/21/2024
Violation issued (HPD, open)
B
08/21/2024
Violation issued (HPD, open)
B
08/21/2024
Violation issued (HPD, open)
B
08/13/2024
Violation issued (HPD, open)
C
08/13/2024
Violation issued (HPD, closed)
C
08/13/2024
Violation issued (HPD, closed)
C
08/05/2024
Violation issued (HPD, open)
C
07/31/2024
Objection resolved — Addressed
07/30/2024
Violation issued (HPD, closed)
C
07/23/2024
Objection resolved — Addressed
07/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/30/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/27/2026
DOB NOWGeneral ConstructionSigned-offWKR CONSTRUCTION, INC03/11/2026
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/01/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/28/2025
DOB NOWGeneral ConstructionPermit IssuedWKR CONSTRUCTION, INC04/11/2025
DOB NOWSupported ScaffoldSigned-offWKR CONSTRUCTION, INC04/10/2025
DOB NOWSuspended ScaffoldSigned-offWKR CONSTRUCTION INC04/10/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/28/2024
DOB NOWSupported ScaffoldSigned-offWKR CONSTRUCTION, INC10/07/2024
DOB NOWSuspended ScaffoldPermit IssuedWKR CONSTRUCTION INC05/09/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/30/2024
DOB NOWGeneral ConstructionSigned-offWKR CONSTRUCTION, INC04/25/2024
DOB NOWSuspended ScaffoldSigned-offWKR CONSTRUCTION INC04/16/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC05/03/2023
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY03/15/2022
DOB NOWGeneral ConstructionSigned-offD.J.DEMA PAINTING CORP12/29/2021
DOB NOWGeneral ConstructionSigned-offD.J.DEMA PAINTING CORP12/27/2021
BISPLISSUEDS & L PLUMBING INC07/20/2018
BISOTISSUEDRONG MAINTENANCE INC07/05/2018
BISPLISSUEDS & L PLUMBING INC11/16/2016
BISPLISSUEDS & L PLUMBING INC11/02/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL10/28/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL10/28/2016
BISPLISSUEDS & L PLUMBING INC08/12/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL08/02/2016
BISPLISSUEDS & L PLUMBING INC07/06/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL06/30/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL03/18/2016
BISPLISSUEDS & L PLUMBING INC03/18/2016
BISPLISSUEDS & L PLUMBING INC02/12/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL01/14/2016
BISOTISSUEDAMACO MANAGEMENT & CONSUL01/06/2016
BISPLISSUEDCATMAN PLUMBING INC12/21/2015
BISOTISSUEDAMACO MANAGEMENT & CONSUL12/21/2015
BISOTISSUEDKYW MANAGEMENT COMPANY IN03/05/2015
BISPLISSUEDCATMAN PLUMBING INC12/23/2014
BISPLISSUEDCATMAN PLUMBING INC12/23/2014
BISOTISSUEDFUTUREISTIC DEVELOPMENT I09/11/2014
BISOTISSUEDFUTUREISTIC DEVELOPMENT I09/11/2014
+ 18 more permits on file
2 projects · most recent 07/10/2024
Water/Sanitary Gas
FiledStatusContractorScope
07/10/2024——Gas, Water/Sanitary
10/21/2021Signed-offPRIME PLMBG & HTG OF NYWater/Sanitary
6 projects · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025Permit IssuedAURORA ELECL CONTG INC—
12/05/2023CompleteT. DIRUSSO ELEC'L CONT INGeneral Wiring
10/24/2023Permit IssuedT. DIRUSSO ELEC'L CONT INGeneral Wiring
04/20/2023Permit IssuedBOROWIDE ELECT'L CONTR'S—
09/03/2021CompleteJ & Y ELECTRIC AND INTER*—
07/13/2018Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 04/19/2023
Sidewalk Shed
FiledStatusContractorScope
04/19/2023Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/30/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
06/16/2026Tenant Protection Plan ComplianceGeorge Xerakiasspecial
06/16/2026Air barrier - visual inspectionMOLLY FORRenergy_progress
06/16/2026Post-installed AnchorsMOLLY FORRspecial
06/16/2026FinalBenson Gillespieprogress
06/16/2026MasonryMOLLY FORRspecial
04/29/2026Air barrier - visual inspectionMOLLY FORRenergy_progress
04/29/2026Tenant Protection Plan ComplianceGeorge Xerakiasspecial
04/29/2026Post-installed AnchorsMOLLY FORRspecial
04/29/2026FinalBenson Gillespieprogress
04/29/2026MasonryMOLLY FORRspecial
07/15/2024Fire-Resistant Penetrations and Joints—special
07/15/2024Fire-Resistance Rated Construction—progress
07/08/2024Tenant Protection Plan Compliance—special
07/08/2024Tenant Protection Plan Compliance—special
05/09/2024Post-installed AnchorsFRANCISCO PEREZspecial
04/29/2024Post-installed AnchorsFRANCISCO PEREZspecial
04/03/2024Final—progress
08/05/2021FinalNISCHAL ARJUNEprogress
08/05/2021Maintenance informationNISCHAL ARJUNEenergy_progress
▾Documents — 498 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00546217-I1Request digital key ↗
09/03/2026M00546217-S2Request digital key ↗
09/03/2026M00546217-S3Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits89
▸BISPLAN / WORK APPROVAL APPLICATION47
07/05/2018123519442Open ↗
07/24/2017122928225Open ↗
07/10/2017122928225Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION42
07/24/2018123519442Open ↗
07/05/2018123519442Open ↗
12/05/2016122928216Open ↗
Showing 3 of 42 on file for this type
▸Seals & Professional Certifications128
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
07/05/2018123519442Open ↗
10/27/2017122928225Open ↗
10/27/2017122928216Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
07/05/2018123519442Open ↗
10/31/2016122928225Open ↗
10/31/2016122928216Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
07/05/2018123519442Open ↗
10/31/2016122928225Open ↗
10/31/2016122928216Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00571599-I1Open ↗
09/03/2026M00546217-I1Open ↗
09/03/2026M00546217-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01027052-P1Open ↗
09/01/2026M00923218-P1Open ↗
09/01/2026M00923218-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00923218-P1Open ↗
09/01/2026M00923218-P1Open ↗
08/26/2026M00571599-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING15
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
07/05/2018123519442Open ↗
07/24/2017122928225Open ↗
07/10/2017122928225Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
06/24/2015120432683Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISTENANT PROTECTION PLAN AND NOTES7
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos35
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
07/05/2018123519442Open ↗
10/31/2016122928225Open ↗
10/31/2016122928216Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00546217-I1Open ↗
09/03/2026M00546217-S2Open ↗
09/03/2026M00546217-S3Open ↗
Showing 3 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026M00923218-I1Open ↗
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
07/05/2018123519442Open ↗
10/27/2017122928225Open ↗
10/27/2017122928216Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
10/27/2017122928225Open ↗
10/27/2017122928216Open ↗
10/13/2016140529453Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS9
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/14/2026M00571599-I1Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
10/27/2017122928225Open ↗
10/27/2017122928225Open ↗
10/27/2017122928216Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT39
07/05/2018123519442Open ↗
10/27/2017122928225Open ↗
10/27/2017122928216Open ↗
Showing 3 of 39 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
06/22/2016140465146Open ↗
01/06/2016140444847Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms33
▸BISEFILING JOB APPLICATION COVER SHEET16
08/01/2016140529453Open ↗
06/29/2016140515529Open ↗
03/02/2016140465146Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET10
07/05/2018123519442Open ↗
10/31/2016122928225Open ↗
10/31/2016122928216Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
11/18/2016122928225Open ↗
10/02/2015121367644Open ↗
Showing 2 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
10/27/2017122928225Open ↗
10/27/2017122928216Open ↗
▸Other Documents16
▸DOB NOWHPD4: CONH Pilot Program7
08/17/2026M00923218-P1Open ↗
08/13/2026M01106716-I1Open ↗
08/13/2026M00861790-I1Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/27/2017122928216Open ↗
Showing 1 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01027052-P1Open ↗
08/13/2026M01027052-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01027052-P1Open ↗
08/13/2026M01027052-I1Open ↗