| Owner | Filings | Most Recent |
|---|---|---|
| Verizon | 376 | 10/04/2026 |
| Nynex | 2 | 03/21/2026 |
| NY Telephone Co | 1 | 03/21/2026 |
| Nynex Room | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| WB Engineers & Consultants | 51 | 09/30/2026 |
| Brand Access Solutions | 2 | 09/12/2025 |
| Merritt Engineering Consultants | 2 | 08/19/2025 |
| WFC Architects | 23 | 08/08/2025 |
| Conlon Engineering | 17 | 01/20/2025 |
| Universal Builders Supply | 11 | 08/06/2024 |
| Geotechnical Engineering Services | 1 | 04/28/2023 |
| Howard I Shapiro & Associates | 1 | 11/03/2022 |
| Tohfaz Uddin PE | 1 | 03/31/2021 |
| Arthur R. Breue, P.E | 1 | 12/09/2020 |
| Louis Hegyi | 1 | 08/10/2020 |
| Safway Atlantic | 4 | 02/23/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| KM Associates of New York | 61 | 03/21/2026 |
| Eurocelt Expediting | 22 | 03/21/2026 |
| Synergy Building Consultants | 1 | 03/21/2026 |
| J.A.M. Associates | 16 | 03/21/2026 |
| K & M Associates | 84 | 03/21/2026 |
| A1 Expediting Service | 12 | 03/21/2026 |
| Arsenal Building Consultants | 2 | 03/21/2026 |
| Hovann | 2 | 03/21/2026 |
| Angela Rivera | 1 | 03/21/2026 |
| Merritt Engineering Consultant | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Tishman Interiors | General Contractor | 127 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 10 | 07/08/2026 |
| Safway Atlantic | Scaffold | 8 | 07/08/2026 |
| Universal Builders Supply | Scaffold | 7 | 07/08/2026 |
| Pace Plumbing | Fire Protection | 7 | 07/08/2026 |
| Pinto & Teger Electric | Electrical | 7 | 03/22/2026 |
| On-Trac Construction Associates | General Contractor | 4 | 07/08/2026 |
| Lawrence J. Levine | Fire Protection | 4 | 03/21/2026 |
| Par Plumbing Co | Plumbing | 4 | 07/08/2026 |
| Allan/Brite-Way Electrical Co | Electrical | 3 | 03/22/2026 |
| Spring Scaffolding | Scaffold | 3 | 03/21/2026 |
| Manengeering Bureau | Fire Protection | 3 | 07/08/2026 |
| Olympic Plumbing & Heating Service | Plumbing | 3 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Pace Plumbing | Plumbing | 2 | 07/08/2026 |
| Preferred Mechanical | Plumbing | 2 | 07/08/2026 |
| Corporate Electric Group | Electrical | 1 | 03/22/2026 |
| Hatzel and Buehler | Electrical | 1 | 03/22/2026 |
| H.M. Hughes Co | General Contractor | 1 | 07/08/2026 |
| RMT Electric | Electrical | 1 | 03/21/2026 |
| Realm Electrical Contractors | Electrical | 1 | 03/21/2026 |
| P.E. Stone | Electrical | 1 | 03/22/2026 |
| JCC Construction | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Crosscheck Inspection Services | 544 | 93 | 09/30/2026 |
| G. Blinn Consulting | 2894 | 1 | 09/12/2025 |
| KZ Engineering | 4665 | 1 | 06/25/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 05/05/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Safway Atlantic | 09/29/2025 |
| DOB NOW | Sprinklers | Signed-off | Lawrence J. Levine | 09/24/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Safway Atlantic | 09/12/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | H & H Restoration | 09/11/2025 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/09/2025 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/03/2025 |
| DOB NOW | Standpipe | Permit Issued | Ashlar Mechanical | 08/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 08/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 08/20/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 08/19/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 08/19/2025 |
| DOB NOW | Standpipe | Permit Issued | Ashlar Mechanical | 08/19/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 08/19/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 08/19/2025 |
| DOB NOW | Plumbing | Signed-off | Olympic Plumbing & Heating Service | 08/08/2025 |
| DOB NOW | Plumbing | Signed-off | Olympic Plumbing & Heating Service | 08/06/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Safway Atlantic | 07/30/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | H & H Restoration | 06/27/2025 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 11/12/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 11/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Tishman Interiors | 11/12/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Tishman Interiors | 11/12/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | Tishman Interiors | 11/12/2024 |
| DOB NOW | Plumbing | Signed-off | JCC Construction | 10/22/2024 |
| DOB NOW | Sprinklers | Permit Issued | Manengeering Bureau | 10/21/2024 |
| DOB NOW | Plumbing | Signed-off | Olympic Plumbing & Heating Service | 10/18/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Tishman Interiors | 10/15/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 10/09/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | Structural | Signed-off | Tishman Interiors | 09/10/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/09/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/09/2024 |
| DOB NOW | Structural | Signed-off | Tishman Interiors | 09/09/2024 |
| DOB NOW | General Construction | Signed-off | Tishman Interiors | 09/09/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/30/2026 | Signed-off | Tishman Interiors | Heating Systems | Heating |
| 11/21/2025 | Permit Issued | Tishman Interiors | Air Conditioning Systems, Ventilation Systems | Cooling Climateworx IRC2448V1XNXXXXXXLX 179,281 BTU ×36 PDC087V1XHXMXXXXXBLX-RH 349,564 BTU ×20 PCU065W1XQXMXXXXXBLX 272,507 BTU · Crac Unit ×10 HKC-048X-3-000-00-00-00-EC-00-RT-B 34,741 BTU · Crac Unit ×2 PCU087 349,564 BTU ×3 IRC-24 179,281 BTU · Crac Unit ×18 PCD087 349,564 BTU · Crac Unit ×10 PCU065 272,507 BTU · Crac Unit ×5 PS6CU03 34,741 BTU · Condensing Unit ×1 Ventilation |
| 10/17/2025 | Permit Issued | Tishman Interiors | Air Conditioning Systems, Heating Systems | Cooling Climateworx PCU034 133,886 BTU ×2 Heating Vulcan N/A 18,000 BTU · Electric Heater ×1 |
| 10/17/2025 | Signed-off | Tishman Interiors | Air Conditioning Systems, Cooling Towers, Heating and Air Conditioning Systems, Heating Systems | Cooling Climateworx PCU087W1XQXMXXXXXTLX 349,000 BTU · Condensing Unit ×1 PS6CU05VEBTAX 59,981 BTU · Condensing Unit ×1 Climateworks PCU087W1XQXMXXXXXTLX 349,564 BTU · Condensing Unit ×1 Daikin FTX36WVJU9 59,981 BTU · Split System ×1 Heat / Cool Trane CVHF620G55U0PE028584HBCBBA00000007E1G070L00000GA100DA 600 tons · Chiller ×3 CVHF620G55V0PE028584HBCBBA00000007E1G070L00000GA100DA 600 tons · Chiller ×1 Heating N/A N/A 10,238 BTU · Unit Heater ×4 Cooling Tower Spx Cooling Technologies NC8407TCS3SGF 600 tons · Cooling Tower ×3 |
| 08/07/2025 | Signed-off | Tishman Interiors | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Climateworx HKC-048X-3-000-00-00-00-EC-00-RT-B 34,470 BTU · Crac Unit ×1 Xetex XAH-16000-CW-HW-FF
XAH-CW-HW-RC 403,300 BTU ×1 Heat / Cool Mitsubishi Electric NTXSKH24A112AA
PEAD-A24AA9 800 CFM · Condensing Unit ×1 TPEADA0241AA70A SUZ-KA24NAHZ 24,000 BTU · Condensing Unit ×1 Heating Xetex XAH-16000-CW-HW-FF
XAH-CW-HW-RC 498,700 BTU ×1 Ventilation Greenheck BDF-80 750 CFM · Exhaust Fan ×1 BDF-80 SQ-120-VG-X 750 CFM · Exhaust Fan ×1 SQ-70-VG 150 CFM · Exhaust Fan ×1 SQ-80-X 200 CFM · Exhaust Fan ×1 |
| 12/22/2022 | Signed-off | Tishman Interiors | Heating Systems | Heating Stelpro ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2025 | Permit Issued | Ashlar Mechanical | — |
| 10/17/2025 | Permit Issued | Ashlar Mechanical | 59 heads |
| 10/17/2025 | Signed-off | Par Fire Protection | 128 heads |
| 08/07/2025 | Permit Issued | Ashlar Mechanical | Sprinkler System |
| 07/24/2025 | Permit Issued | Ashlar Mechanical | 4 heads, 4 outlets |
| 06/25/2024 | Permit Issued | Ashlar Mechanical | 32 heads |
| 04/18/2024 | Permit Issued | Ashlar Mechanical | 403 heads |
| 12/22/2022 | Permit Issued | Ashlar Mechanical | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2025 | Signed-off | Olympic Plumbing & Heating Service | Water/Sanitary |
| 10/17/2025 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 10/17/2025 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 08/07/2025 | Signed-off | Olympic Plumbing & Heating Service | Water/Sanitary |
| 07/24/2025 | Signed-off | JCC Construction | Storm |
| 12/22/2022 | Signed-off | Olympic Plumbing & Heating Service | Storm |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/04/2026 | Permit Issued | James F. Volpe Electrical | General Wiring |
| 08/06/2025 | Complete | Allan/Brite-Way Electrical Co | General Wiring |
| 07/29/2025 | Permit Issued | Corporate Electric Group | — |
| 07/17/2025 | Complete | Hatzel and Buehler | General Wiring |
| 07/17/2025 | Complete | Hatzel and Buehler | General Wiring |
| 06/23/2025 | Complete | Hatzel and Buehler | General Wiring |
| 03/03/2025 | Complete | Allan/Brite-Way Electrical Co | General Wiring |
| 11/26/2024 | Permit Issued | PJS Electric | General Wiring |
| 02/08/2024 | Permit Issued | Royal Electrical Contracting | General Wiring |
| 02/08/2024 | Permit Issued | Illuminous Electric | General Wiring |
| 01/29/2024 | Complete | Hatzel and Buehler | General Wiring |
| 01/29/2024 | Complete | PJS Electric | General Wiring |
| 05/19/2023 | Complete | Allan/Brite-Way Electrical Co | — |
| 05/04/2023 | Complete | Hatzel and Buehler | General Wiring |
| 04/06/2023 | Complete | Hatzel and Buehler | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2025 | Permit Issued | Ashlar Mechanical | Steel, Concrete |
| 10/17/2025 | Permit Issued | Ashlar Mechanical | Steel, Concrete, Masonry |
| 10/17/2025 | Signed-off | Par Fire Protection | Steel, Concrete |
| 07/24/2025 | Permit Issued | Ashlar Mechanical | Steel, Concrete, Masonry |
| 01/20/2025 | — | — | Steel, Concrete |
| 06/25/2024 | Permit Issued | Ashlar Mechanical | Steel, Concrete, Masonry |
| 04/18/2024 | Permit Issued | Ashlar Mechanical | Steel |
| 12/22/2022 | Permit Issued | Ashlar Mechanical | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2025 | Permit Issued | H & H Restoration | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/27/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/26/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/15/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/15/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/20/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/28/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/27/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/14/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/06/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 01/22/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/07/2024 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 10/29/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 10/29/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/26/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/21/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/02/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/01/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 01/26/2024 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 01/23/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/25/2026 | HVAC-R and service water piping design and insulation | EUGENE BIFULCO | energy_progress |
| 09/25/2026 | Shutoff dampers | EUGENE BIFULCO | energy_progress |
| 09/25/2026 | HVAC-R and service water heating equipment | EUGENE BIFULCO | energy_progress |
| 09/25/2026 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 09/25/2026 | Mechanical Systems | EUGENE BIFULCO | special |
| 09/25/2026 | HVAC-R and service water heating system controls | EUGENE BIFULCO | energy_progress |
| 09/25/2026 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 09/25/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 09/25/2026 | Final | EUGENE BIFULCO | progress |
| 11/10/2025 | Duct leakage testing, insulation and design | EUGENE BIFULCO | energy_progress |
| 11/10/2025 | Metering | EUGENE BIFULCO | energy_progress |
| 11/10/2025 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 11/10/2025 | Interior lighting power | EUGENE BIFULCO | energy_progress |
| 11/10/2025 | Final | EUGENE BIFULCO | progress |
| 11/10/2025 | Mechanical Systems | EUGENE BIFULCO | special |
| 11/10/2025 | HVAC-R and service water piping design and insulation | EUGENE BIFULCO | energy_progress |
| 11/10/2025 | Lighting controls | EUGENE BIFULCO | energy_progress |
| 11/10/2025 | Shutoff dampers | EUGENE BIFULCO | energy_progress |
| 10/20/2025 | Shutoff dampers | EUGENE BIFULCO | energy_progress |
| 10/20/2025 | Metering | EUGENE BIFULCO | energy_progress |
| 10/20/2025 | Lighting controls | EUGENE BIFULCO | energy_progress |
| 10/20/2025 | Final | EUGENE BIFULCO | progress |
| 10/20/2025 | Duct leakage testing, insulation and design | EUGENE BIFULCO | energy_progress |
| 10/20/2025 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 10/20/2025 | Interior lighting power | EUGENE BIFULCO | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Verizon | Telecom site | Entire building | Project M01089378 Project M01089391 Project M00897628 Project M00943171 Project M00876010 Project M00772501 Project M00790361 Project M00734890 Project M00750896 Project M00734888 Project M00378351 |