← Back
BuildNYC
Walk-up apt, over six families with stores
2300 AMSTERDAM AVENUE
MANHATTAN · BIN 1063172
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R7-2Zoning
17,825 sfGross Floor Area
19Units
Rent Stabilized10 Active Violations 1 old, status unconfirmed ▸
Walk-up apt, over six families with stores · Owner of record: NYC Housing Preservation and Development · 4,500 sf lot · 3.96 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 51 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 13 filings
Cellar1 filing
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1407/08/2026
BPM Associates203/21/2026
NYC Department of Transportation103/21/2026
NYC Department of Design and Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Aidd Architecture211/10/2026
Dagher Engineering311/03/2026
Ivan Design Engineering Analysis103/10/2026
Asr Engineering110/05/2024
KNF Services Crop212/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting803/21/2026
Expediting103/21/2026
KNF Services Crop203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative ConstructionGeneral Contractor303/21/2026
New Safeway ContractingScaffold303/21/2026
Ihope PLG HeatingPlumbing203/21/2026
MG ConstructionGeneral Contractor103/21/2026
Ihop Plumbing & HeatingPlumbing103/21/2026
Innovative ConstructionScaffold107/08/2026
Word of Light ElectricElectrical103/21/2026
16 Warren St/BH Plumbing & HeatingPlumbing210/15/1998
Building Lifecycle
11/10/2026
Filed — Alteration CO
Reinforce existing floor framing and change stair bulkhead framing as per plan, filed in conjunction with GC # M01311316-I1
M01311316-P2
11/03/2026
Filed — Alteration CO
Reinforce existing floor framing and change stair bulkhead framing as per plan, filed in conjunction with GC # M01311316-I1
M01311316-S4
10/27/2026
Special inspection requirement — Energy Code Compliance Inspections
10/27/2026
Special inspection requirement — Interior lighting power
10/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
107 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—New Safeway Contracting—
DOB NOW—Innovative Construction—
DOB NOW—Innovative Construction—
BIS—American Boiler & Welding—
BIS—The Franklin Co Contracting—
BIS—R S & C Associates—
BIS—Ihop Plumbing & Heating—
BIS—16 Warren St/BH Plumbing & Heating—
BIS—16 Warren St/BH Plumbing & Heating—
BIS—Pro Concrete Contractors—
BIS—Lilly Construction—
BIS—Ihope PLG & Heating—
BIS—Ihope PLG & Heating—
BIS—GA Contrators—
BIS—Brook Fuel Oil—
Nothing on file for this building.
Nothing on file for this building.
53 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account