← Back
Two family brick
2300 PITKIN AVENUE
BROOKLYN · East New York (North) · BIN 3089143
💬 Discuss this project
2006Year Built
3Stories
B1Building Class
R7AZoning
3,186 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · 1,396 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Floor 312p · 2 filings · 20 docs
Floor 210p · 2 filings · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar14p · 3 filings · 20 docs
Site & exterior9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/26/2016$450K—Private party → Private party$141/sf building
03/25/2015$455K—— → —$143/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GELU DURUS MUSICA1008/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GELU DURUS MUSICA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANCISCO SOSA, INCGeneral Contractor703/22/2026
FRANCISCO SOSA, INCGeneral Contractor403/21/2026
SNIDOW, JAMESElectrical203/21/2026
YU, WILLIAMElectrical203/21/2026
Z.S. ENGINEERING P.C.Electrical203/21/2026
MORRIS, BRIANElectrical203/21/2026
SAWYER & THOMPSON, INC.Electrical203/21/2026
MO CONTRACTING INCFire Protection107/08/2026
KATAN P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISAIAH ARCHITECT P.C.74791008/09/2023
Building Lifecycle
All (110)Filed (10)Permit Issued (3)Signed Off (3)Violation (36)Inspection (9)Objection (28)Special Inspection (21)
05/21/2025
Violation issued (HPD, closed)
C
12/03/2024
Violation issued (HPD, closed)
I
05/07/2024
Signed off — Alteration CO
PROPOSE CHANGE FROM 2 DU TO 3DU. AND REPAIR 3RD FLOOR FIRE DAMAGE APARTMENT.
B00490609-I1
09/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/09/2023
Filed — Alteration CO
PROPOSE CHANGE FROM 2 DU TO 3DU. AND REPAIR 3RD FLOOR FIRE DAMAGE APARTMENT.
B00490609-P8
08/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
08/04/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Sandor Weiss
08/04/2023
Special inspection requirement — Fenestration air leakage
Sandor Weiss
08/04/2023
Special inspection requirement — Fenestration areas
Sandor Weiss
07/27/2023
Filed — Alteration CO
PROPOSE CHANGE FROM 2 DU TO 3DU. AND REPAIR 3RD FLOOR FIRE DAMAGE APARTMENT.
B00490609-P7
07/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Sandor Weiss
07/25/2023
Special inspection requirement — Fenestration air leakage
Sandor Weiss
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
07/25/2023
Special inspection requirement — Fenestration areas
Sandor Weiss
05/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2023
Filed — Alteration CO
PROPOSE CHANGE FROM 2 DU TO 3DU. AND REPAIR 3RD FLOOR FIRE DAMAGE APARTMENT.
B00490609-P5
03/21/2023
Signed off — Alteration
PROPOSE PLUMBING WORK AT CELLAR AND 1ST FLOOR FOR AN EXISTNG TWO EXISTING FAMILY BUILDING CHANGING TO A THREE FAMILY.
B08011353-I1
03/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
03/14/2023
Objection resolved — Addressed
03/13/2023
Objection raised — Scope
03/10/2023
Filed — Alteration
PROPOSE PLUMBING WORK AT CELLAR AND 1ST FLOOR FOR AN EXISTNG TWO EXISTING FAMILY BUILDING CHANGING TO A THREE FAMILY.
B08011353-P3
03/02/2023
Special inspection requirement — Fenestration air leakage
Sandor Weiss
03/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
03/02/2023
Special inspection requirement — Fenestration areas
Sandor Weiss
03/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Sandor Weiss
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
01/27/2023
Filed — Alteration
PROPOSE PLUMBING WORK AT CELLAR AND 1ST FLOOR FOR AN EXISTNG TWO EXISTING FAMILY BUILDING CHANGING TO A THREE FAMILY.
B08011353-P1
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
12/19/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/14/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/09/2022
Signed off — Alteration
B00564459-I1
12/08/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/06/2022
Permit issued — Plumbing
B08011353-I1-PL
11/17/2022
Violation issued (HPD, closed)
I
10/28/2022
Objection raised — Scope
10/28/2022
Objection resolved — Addressed
10/28/2022
Objection raised — Other
10/28/2022
Objection resolved — Addressed
10/28/2022
Objection raised — Scope
10/28/2022
Objection resolved — Addressed
10/25/2022
Filed — Alteration
PROPOSE PLUMBING WORK AT CELLAR AND 1ST FLOOR FOR AN EXISTNG TWO EXISTING FAMILY BUILDING CHANGING TO A THREE FAMILY.
B08011353-I1
10/11/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/27/2022
Permit issued — Sprinklers
B00564459-I1-EW-SP
06/24/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/13/2022
Permit issued — General Construction
B00490609-I1-GC
06/01/2022
Objection resolved — Addressed
05/10/2022
Objection raised — Scope
05/02/2022
Filed — Alteration CO
PROPOSE CHANGE FROM 2 DU TO 3DU. AND REPAIR 3RD FLOOR FIRE DAMAGE APARTMENT.
B00490609-P4
05/02/2022
Special inspection requirement — Fenestration air leakage
Sandor Weiss
05/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Sandor Weiss
04/27/2022
Special inspection requirement — Fenestration areas
Sandor Weiss
04/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
03/18/2022
Violation issued (HPD, closed)
I
03/14/2022
Special inspection requirement — Fenestration areas
Sandor Weiss
03/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
03/02/2022
Objection resolved — Addressed
01/07/2022
Objection raised — Admin
12/29/2021
Filed — Alteration CO
PROPOSE CHANGE FROM 2 DU TO 3DU. AND REPAIR 3RD FLOOR FIRE DAMAGE APARTMENT.
B00490609-P2
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKATAN P & H INC12/06/2022
DOB NOWSprinklersSigned-offMO CONTRACTING INC09/27/2022
DOB NOWGeneral ConstructionPermit IssuedFRANCISCO SOSA, INC06/13/2022
BISEQISSUEDMENALLI & CO08/18/2006
2 projects · most recent 03/10/2023
General Wiring
FiledStatusContractorScope
03/10/2023CompleteHI-RITE ELECTRIC CORPGeneral Wiring
02/09/2022CompleteTMF ELEC'L CONTR. INC.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2023Fail-Final CND-Occupancy InspectionFailView ↗
05/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/11/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/24/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/04/2023Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
08/04/2023Fenestration and door U-factor and product ratingsSandor Weissenergy_progress
08/04/2023Fenestration air leakageSandor Weissenergy_progress
08/04/2023Fenestration areasSandor Weissenergy_progress
07/25/2023Fenestration and door U-factor and product ratingsSandor Weissenergy_progress
07/25/2023Fenestration air leakageSandor Weissenergy_progress
07/25/2023Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
07/25/2023Fenestration areasSandor Weissenergy_progress
03/15/2023Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
03/02/2023Fenestration air leakageSandor Weissenergy_progress
03/02/2023Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
03/02/2023Fenestration areasSandor Weissenergy_progress
03/02/2023Fenestration and door U-factor and product ratingsSandor Weissenergy_progress
03/01/2023Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
01/19/2023Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
05/02/2022Fenestration air leakageSandor Weissenergy_progress
05/02/2022Fenestration and door U-factor and product ratingsSandor Weissenergy_progress
04/27/2022Fenestration areasSandor Weissenergy_progress
04/27/2022Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
03/14/2022Fenestration areasSandor Weissenergy_progress
03/10/2022Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00564459-I1Request digital key ↗
08/28/2026B08011353-P1Request digital key ↗
08/27/2026B00490609-P7Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸DOB NOWHPD - Permit Notice2
08/13/2026B00564459-I1Open ↗
08/13/2026B00490609-P2Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00490609-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B00490609-P8Open ↗
09/01/2026B00490609-P8Open ↗
09/01/2026B00490609-P8Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00564459-I1Open ↗
08/28/2026B08011353-I1Open ↗
08/28/2026B08011353-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B08011353-I1Open ↗
09/01/2026B00490609-P8Open ↗
09/01/2026B00490609-P4Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00490609-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08011353-P1Open ↗
08/27/2026B00490609-P7Open ↗
08/27/2026B00490609-P5Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00490609-I1Open ↗