← Back
Elevator apt, semi-fireproof with stores
2301 KINGS HIGHWAY
BROOKLYN · Midwood · BIN 3182191
💬 Discuss this project
1936Year Built
6Stories
D7Building Class
R7AZoning
104,348 sfGross Floor Area
97Units
LL97 CoveredRent Stabilized55 Open Violations 53 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 2301 KINGS LLC · 24,400 sf lot · 4.28 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIQUE RESTORATION CONSTRUCTION1207/08/2026
ACE GROUP NY507/08/2026
2301 KINGS LLC2103/22/2026
2301 KINGS HIGHWAY203/22/2026
ELIAS MALLOUK REALTY C103/22/2026
ELLIAS MALLOUK REALTY103/22/2026
ALAMIN CONSTR INC103/22/2026
2301 KINGS HWY LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP104/06/2024
VOLUME SPACE CONSULTING INC.104/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIQUE RESTORATION CONSTRGeneral Contractor307/08/2026
ACE GROUP NY CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818104/06/2024
Building Lifecycle
All (80)Filed (5)Permit Issued (9)Violation (60)Objection (2)Special Inspection (4)
12/29/2025
Violation issued (ECB, closed)
Construction
12/29/2025
Violation issued (ECB, closed)
Construction
12/29/2025
Violation issued (ECB, closed)
Zoning
11/04/2025
Violation issued (HPD, closed)
A
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
06/26/2025
Violation issued (HPD, closed)
A
06/26/2025
Violation issued (HPD, closed)
A
06/26/2025
Violation issued (HPD, closed)
B
05/23/2025
Violation issued (HPD, closed)
B
05/23/2025
Violation issued (HPD, closed)
B
05/23/2025
Violation issued (HPD, closed)
B
05/23/2025
Violation issued (HPD, closed)
A
05/23/2025
Violation issued (HPD, closed)
B
05/23/2025
Violation issued (HPD, closed)
C
05/23/2025
Violation issued (HPD, closed)
B
05/23/2025
Violation issued (HPD, closed)
B
04/12/2025
Violation issued (HPD, closed)
C
04/12/2025
Violation issued (HPD, closed)
B
04/02/2025
Permit issued — General Construction
B01031751-I1-GC
03/28/2025
Permit issued — Sidewalk Shed
B01030129-I1-SH
01/27/2025
Permit issued — General Construction
B01031751-I1-GC
09/25/2024
Violation issued (HPD, closed)
C
09/25/2024
Violation issued (HPD, closed)
B
07/30/2024
Permit issued — Suspended Scaffold
B01046193-I1-SC
06/27/2024
Permit issued — Suspended Scaffold
B01046193-P2-SC
06/18/2024
Filed — Alteration
AMENDMENT FOR HOIST OPTION AS BETA MAX-SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK
B01046193-P2
06/12/2024
Permit issued — Suspended Scaffold
B01046193-P1-SC
06/07/2024
Filed — Alteration
AMENDMENT FOR HOIST OPTION AS BETA MAX-SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK
B01046193-P1
06/07/2024
Objection raised — Other
06/07/2024
Objection resolved — Addressed
06/05/2024
Violation issued (HPD, closed)
B
06/05/2024
Violation issued (HPD, closed)
B
06/05/2024
Violation issued (HPD, closed)
B
06/05/2024
Violation issued (HPD, closed)
B
05/24/2024
Permit issued — Suspended Scaffold
B01046193-I1-SC
05/20/2024
Permit issued — General Construction
B01031751-I1-GC
05/12/2024
Filed — Alteration
AMENDMENT FOR HOIST OPTION AS BETA MAX-SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK
B01046193-I1
04/16/2024
Violation issued (HPD, closed)
C
04/06/2024
Filed — Alteration
1. REPLACE EXISTING PARAPET WALL AT KINGS HIGHWAY SIDE, EAST 23RD AND 24TH STREET SIDE = 509 LF2. REPLACE EXISTING WINDOW LINTEL AT 5TH FLOOR LEVEL AT KINGS HIGHWAY SIDE, EAST 23RD AND 24TH STREET SIDE = 69 NOS.
B01031751-I1
04/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
04/06/2024
Special inspection requirement — Masonry
NORMAN LOK
04/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
04/06/2024
Special inspection requirement — Final
Eric Foster
04/05/2024
Filed — Alteration
B01030129-I1
04/05/2024
Permit issued — Sidewalk Shed
B01030129-I1-SH
03/30/2024
Violation issued (HPD, closed)
C
03/04/2024
Violation issued (HPD, closed)
B
03/04/2024
Violation issued (HPD, closed)
B
02/23/2024
Violation issued (HPD, closed)
B
02/23/2024
Violation issued (HPD, closed)
C
02/23/2024
Violation issued (HPD, closed)
B
02/23/2024
Violation issued (HPD, closed)
B
02/23/2024
Violation issued (HPD, closed)
C
02/23/2024
Violation issued (HPD, closed)
B
02/20/2024
Violation issued (HPD, closed)
B
02/20/2024
Violation issued (HPD, closed)
B
02/08/2024
Violation issued (HPD, closed)
B
02/08/2024
Violation issued (HPD, closed)
A
02/08/2024
Violation issued (HPD, closed)
A
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUNIQUE RESTORATION CONSTR04/02/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP03/28/2025
DOB NOWGeneral ConstructionPermit IssuedUNIQUE RESTORATION CONSTR01/27/2025
DOB NOWSuspended ScaffoldPermit IssuedNY WONDER CONSTRUCTION CO07/30/2024
DOB NOWSuspended ScaffoldPermit IssuedNY WONDER CONSTRUCTION CO06/27/2024
DOB NOWSuspended ScaffoldPermit IssuedNY WONDER CONSTRUCTION CO06/12/2024
DOB NOWSuspended ScaffoldPermit IssuedNY WONDER CONSTRUCTION CO05/24/2024
DOB NOWGeneral ConstructionPermit IssuedUNIQUE RESTORATION CONSTR05/20/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP04/05/2024
BISFBISSUEDSTAR INDUSTRIAL SERVICE CO INC05/06/1998
BISPLISSUEDJOSEPH FERRIGNO PLUMBING & HEATI05/06/1998
BISFSISSUEDNEAL M. RUDIKOFF10/24/1996
1 project · most recent 06/18/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/18/2024Permit IssuedNY WONDER CONSTRUCTION COSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/06/2024Tenant Protection Plan ComplianceNORMAN LOKspecial
04/06/2024MasonryNORMAN LOKspecial
04/06/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
04/06/2024FinalEric Fosterprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B01030129-I1Request digital key ↗
08/25/2026B01031751-I1Request digital key ↗
08/24/2026B01046193-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026B01031751-I1Open ↗
08/13/2026B01030129-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01031751-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01031751-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026B01031751-I1Open ↗
▸Other Documents6
▸DOB NOWCalculations3
08/13/2026B01046193-P1Open ↗
08/13/2026B01046193-I1Open ↗
08/13/2026B01046193-P2Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026B01046193-P2Open ↗
08/13/2026B01046193-I1Open ↗
08/13/2026B01046193-P1Open ↗