← Back
Two family frame
2302 80 STREET
BROOKLYN · BIN 3184970
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R5Zoning
3,296 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 4,000 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2020$1.4M—2302 80TH LLC → Private party$428/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKW ENGINEERING, P.C.309/02/2022
CITY BUILDING NY ARCHITECT P.C.112/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JKW ENGINEERING PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WING LEE CONTRACTOR INCGeneral Contractor407/08/2026
FLYTIGER P & H LTDPlumbing207/08/2026
Building Lifecycle
All (26)Filed (4)Permit Issued (5)Signed Off (3)Violation (1)Inspection (5)Objection (4)Special Inspection (4)
12/05/2022
Signed off — Alteration
Renovate existing two family dwelling. Relocate and install plumbing fixtures as per plans. Filed in conjunction with Job # 340779848. No change in egress, occupancy or use is involved under this application.
B00427160-I1
12/02/2022
Signed off — Alteration
Install new curb cut. No change in use, egress or occupancy under this application.
B00650837-I1
12/01/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/20/2022
Signed off — Alteration
B00458672-I1
09/27/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/02/2022
Filed — Alteration
Renovate existing two family dwelling. Relocate and install plumbing fixtures as per plans. Filed in conjunction with Job # 340779848. No change in egress, occupancy or use is involved under this application.
B00427160-P1
08/30/2022
Special inspection requirement — Energy Code Compliance Inspections
James Wai
08/30/2022
Special inspection requirement — Maintenance information
James Wai
08/30/2022
Special inspection requirement — HVAC and service water heating equipment
James Wai
08/30/2022
Special inspection requirement — HVAC and service water heating system controls
James Wai
07/01/2022
Permit issued — Construction Fence
B00458672-I1-FN
03/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2022
Permit issued — Curb Cut
B00650837-I1-CC
01/05/2022
Objection resolved — Addressed
01/03/2022
Objection raised — Zoning
01/03/2022
Objection resolved — Addressed
12/27/2021
Objection raised — Zoning
12/21/2021
Filed — Alteration
Install new curb cut. No change in use, egress or occupancy under this application.
B00650837-I1
12/01/2021
Permit issued — Plumbing
B00427160-I1-PL
08/09/2021
Permit issued — Plumbing
B00427160-I1-PL
07/12/2021
Permit issued — Construction Fence
B00458672-I1-FN
06/03/2021
Filed — Alteration
Renovate existing two family dwelling. Relocate and install plumbing fixtures as per plans. Filed in conjunction with Job # 340779848. No change in egress, occupancy or use is involved under this application.
B00427160-I1
06/03/2021
Filed — Alteration
B00458672-I1
01/08/2012
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offWING LEE CONTRACTOR INC07/01/2022
DOB NOWCurb CutSigned-offWING LEE CONTRACTOR INC01/12/2022
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD12/01/2021
DOB NOWPlumbingSigned-offFLYTIGER P & H LTD08/09/2021
DOB NOWConstruction FenceSigned-offWING LEE CONTRACTOR INC07/12/2021
BISOTISSUEDWING LEE CONTRACTOR INC06/28/2022
BISOTISSUEDWING LEE CONTRACTOR INC07/01/2021
1 project · most recent 12/29/2022
General Wiring
FiledStatusContractorScope
12/29/2022CompleteFIRST STAR ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/01/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/27/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/30/2022Energy Code Compliance InspectionsJames Waiprogress
08/30/2022Maintenance informationJames Waienergy_progress
08/30/2022HVAC and service water heating equipment James Waienergy_progress
08/30/2022HVAC and service water heating system controls James Waienergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00427160-I1Request digital key ↗
09/01/2026B00427160-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/15/2026B00650837-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00458672-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
10/25/2022340779848Open ↗
06/06/2022340779848Open ↗
05/11/2021340779848Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
07/01/2021340779848Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
06/25/2021340779848Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/25/2021340779848Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
05/21/2021340779848Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00427160-I1Open ↗
09/01/2026B00427160-P1Open ↗
09/01/2026B00458672-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00427160-P1Open ↗
08/28/2026B00427160-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/28/2020340779848Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/28/2020340779848Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/28/2020340779848Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00427160-I1Open ↗
09/01/2026B00427160-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/01/2021340779848Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/05/2022340779848Open ↗
06/25/2021340779848Open ↗
10/28/2020340779848Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/05/2022340779848Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/28/2020340779848Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00427160-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/05/2022340779848Open ↗
06/25/2021340779848Open ↗
05/21/2021340779848Open ↗
Showing 3 of 5 on file for this type
▸BISSOIL REPORT1
04/27/2021340779848Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/27/2021340779848Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/06/2022340779848Open ↗
12/06/2022340779848Open ↗
08/23/2022340779848Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/06/2022340779848Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/05/2022340779848Open ↗
04/27/2021340779848Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
08/23/2022340779848Open ↗
05/21/2021340779848Open ↗
05/21/2021340779848Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/28/2020340779848Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00427160-P1Open ↗
▸Other Documents2
▸BISSUSTAINABLE ROOF ZONE FORM1
03/01/2021340779848Open ↗
▸BISPLOT DIAGRAM1
10/28/2020340779848Open ↗