← Back
BRONX
2302 WEBSTER AVENUE
BRONX · BIN 2129104
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation ▸
Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Roof3p · 1 filing · 11 docs
Floor 81p · 1 filing · 14 docs
Floor 7
Floor 6
Floor 5
Floor 411p · 1 filing · 20 docs
Floor 311p · 1 filing · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 128p · 4 filings · 20 docs
Cellar15p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKF GENERAL CONTRACTORS2507/08/2026
SKF DEVELOPMENT603/21/2026
G I B REALTY403/21/2026
2324 WEBSTER AVE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BECALL ENGINEERING SERVICES INC.709/26/2024
BADALY ARCHITECTS905/06/2022
STEE LLC304/28/2022
MAX DISLA ARCHITECT704/07/2022
BILLAH ENGINEERING PLLC209/15/2021
SYED ENGINEERING, P.C.106/03/2020
ROYAL ENGINEERING, P.C109/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BADALY ARCHITECT PLLC903/21/2026
INSHA BUILDING CONSULTANTS1003/21/2026
CONSOLIDATED SCAFFOLD BRIDGE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKF GENERAL CONTRACTORS,General Contractor2007/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor1203/21/2026
PINNACLE PLBG & HTG CORPPlumbing307/08/2026
A J IANNI ELECL CONTS INCElectrical103/22/2026
PINNACLE PLBG & HTG CORPFire Protection107/08/2026
2260 MAG CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC71371309/26/2024
MAX DISLA, ARCHITECT8357111/10/2022
BILLAH ENGINEERING5838504/28/2022
Building Lifecycle
All (170)Filed (30)Permit Issued (20)Signed Off (11)Violation (60)Inspection (17)Objection (2)Special Inspection (30)
08/17/2026
Violation issued (HPD, open)
C
07/07/2026
Violation issued (HPD, closed)
C
07/07/2026
Violation issued (HPD, closed)
B
06/26/2026
Violation issued (HPD, closed)
C
06/26/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
B
02/25/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (HPD, closed)
C
02/10/2026
Violation issued (HPD, closed)
B
02/10/2026
Violation issued (HPD, closed)
C
02/10/2026
Violation issued (HPD, closed)
C
06/16/2025
Violation issued (HPD, closed)
A
03/15/2025
Violation issued (HPD, closed)
C
03/15/2025
Violation issued (HPD, closed)
B
03/15/2025
Violation issued (HPD, closed)
B
02/18/2025
Violation issued (HPD, closed)
B
01/07/2025
Violation issued (HPD, closed)
C
01/07/2025
Violation issued (HPD, closed)
B
01/07/2025
Violation issued (HPD, closed)
C
12/28/2024
Violation issued (HPD, closed)
B
12/28/2024
Violation issued (HPD, closed)
B
12/28/2024
Violation issued (HPD, closed)
B
12/28/2024
Violation issued (HPD, closed)
B
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2024
Violation issued (HPD, closed)
I
11/09/2024
Violation issued (HPD, closed)
C
11/09/2024
Violation issued (HPD, closed)
C
11/05/2024
Violation issued (HPD, closed)
C
11/05/2024
Violation issued (HPD, closed)
A
11/01/2024
Violation issued (HPD, closed)
C
11/01/2024
Violation issued (HPD, closed)
C
10/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/08/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/30/2024
Special inspection requirement — Ventilation and air distribution system
John Alleyne
09/30/2024
Special inspection requirement — Heating Systems
MOHAMMAD BADALY
09/30/2024
Special inspection requirement — Metering
John Alleyne
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
09/30/2024
Special inspection requirement — Final
John Alleyne
09/30/2024
Special inspection requirement — Chimneys and vents
MOHAMMAD BADALY
09/30/2024
Special inspection requirement — Shutoff dampers
John Alleyne
09/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
John Alleyne
09/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
John Alleyne
09/30/2024
Special inspection requirement — Lighting controls
John Alleyne
09/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
John Alleyne
09/30/2024
Special inspection requirement — Maintenance information
John Alleyne
09/30/2024
Special inspection requirement — Interior lighting power
John Alleyne
09/30/2024
Special inspection requirement — Mechanical Systems
MOHAMMAD BADALY
09/26/2024
Filed — Alteration CO
ALTERATION TYPE 1 TO PROPOSE DAYCARE ON THE FIRST FLOOR, REVISE COMMERCIAL SPACES LAYOUT. NO WORK TO BE DONE ON CELLAR, 2ND FLOOR TO ROOF.
X00569787-A4
09/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2024
Special inspection requirement — Metering
John Alleyne
09/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
John Alleyne
09/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
John Alleyne
09/17/2024
Special inspection requirement — Chimneys and vents
MOHAMMAD BADALY
09/17/2024
Special inspection requirement — Maintenance information
John Alleyne
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSKF GENERAL CONTRACTORS,01/12/2023
DOB NOWPlumbingSigned-offPINNACLE PLBG & HTG CORP02/11/2022
DOB NOWPlumbingSigned-offPINNACLE PLBG & HTG CORP12/27/2021
DOB NOWSprinklersSigned-offPINNACLE PLBG & HTG CORP12/26/2021
DOB NOWMechanical SystemsSigned-offSKF GENERAL CONTRACTORS,09/27/2021
DOB NOWMechanical SystemsPermit IssuedSKF GENERAL CONTRACTORS,09/27/2021
DOB NOWGeneral ConstructionSigned-offSKF GENERAL CONTRACTORS,07/22/2021
DOB NOWGeneral ConstructionSigned-offSKF GENERAL CONTRACTORS,06/24/2021
DOB NOWPlumbingSigned-offPINNACLE PLBG & HTG CORP06/08/2021
DOB NOWGeneral ConstructionSigned-offSKF GENERAL CONTRACTORS,04/16/2021
DOB NOWGeneral ConstructionSigned-off2260 MAG CORP03/30/2021
DOB NOWCurb CutPermit IssuedSKF GENERAL CONTRACTORS,11/06/2020
DOB NOWConstruction FenceSigned-offSKF GENERAL CONTRACTORS,07/29/2020
DOB NOWConstruction FenceSigned-offSKF GENERAL CONTRACTORS,06/09/2020
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/03/2020
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/03/2020
DOB NOWConstruction FenceSigned-offSKF GENERAL CONTRACTORS,10/09/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING09/26/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING09/26/2019
DOB NOWConstruction FenceSigned-offSKF GENERAL CONTRACTORS,11/01/2018
BIS—ISSUEDSKF GENERAL CONTRACTORS,07/22/2021
BISPLISSUEDPINNACLE PLBG & HTG CORP07/08/2020
BISPLISSUEDPINNACLE PLBG & HTG CORP06/28/2019
BIS—ISSUEDSKF GENERAL CONTRACTORS,11/14/2018
BIS—ISSUEDJ.A.S.D. REALTY CORP.06/16/1994
1 project · most recent 09/26/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/26/2024Signed-offSKF GENERAL CONTRACTORS,Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Rheem RGECZR048A 49,000 BTU · Rooftop Unit ×20
Lennox ×2
Heating
Rheem RGECZR048A 120,000 BTU · Rooftop Unit ×20
Lennox ×2
Ventilation
York evd 800 CFM ×45
Ducts & Piping
York ventilation stack ducts and piping 800 CFM · Ductwork ×45
9 projects · most recent 05/30/2023
General Wiring
FiledStatusContractorScope
05/30/2023CompleteBULK ELECTRIC LLCGeneral Wiring
05/23/2022CompleteA J IANNI ELECL CONTS INCGeneral Wiring
04/13/2022CompleteA J IANNI ELECL CONTS INCGeneral Wiring
11/01/2021CompleteMANDA ELECTRIC COMPANYGeneral Wiring
06/17/2021CompleteAL ELECTRICAL GROUP INC72 meters, 1 new_meters
11/05/2020CompleteAL ELECTRICAL GROUP INCGeneral Wiring
02/18/2020CompleteALEF ELEC'L CONTR'G INCGeneral Wiring
02/06/2020CompleteJAM ELECTRICAL CORP—
09/25/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
10/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/08/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
09/30/2024Interior lighting powerJohn Alleyneenergy_progress
09/30/2024Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
09/30/2024Heating SystemsMOHAMMAD BADALYspecial
09/30/2024Mechanical SystemsMOHAMMAD BADALYspecial
09/30/2024Chimneys and ventsMOHAMMAD BADALYspecial
09/30/2024FinalJohn Alleyneprogress
09/30/2024Ventilation and air distribution systemJohn Alleyneenergy_progress
09/30/2024Maintenance informationJohn Alleyneenergy_progress
09/30/2024Shutoff dampersJohn Alleyneenergy_progress
09/30/2024Lighting controlsJohn Alleyneenergy_progress
09/30/2024HVAC-R and service water piping design and insulationJohn Alleyneenergy_progress
09/30/2024HVAC-R and service water heating system controlsJohn Alleyneenergy_progress
09/30/2024HVAC-R and service water heating equipmentJohn Alleyneenergy_progress
09/30/2024MeteringJohn Alleyneenergy_progress
09/17/2024FinalJohn Alleyneprogress
09/17/2024HVAC-R and service water piping design and insulationJohn Alleyneenergy_progress
09/17/2024MeteringJohn Alleyneenergy_progress
09/17/2024HVAC-R and service water heating equipmentJohn Alleyneenergy_progress
09/17/2024Shutoff dampersJohn Alleyneenergy_progress
09/17/2024Maintenance informationJohn Alleyneenergy_progress
09/17/2024HVAC-R and service water heating system controlsJohn Alleyneenergy_progress
09/17/2024Interior lighting powerJohn Alleyneenergy_progress
09/17/2024Lighting controlsJohn Alleyneenergy_progress
09/17/2024Ventilation and air distribution systemJohn Alleyneenergy_progress
09/17/2024Chimneys and ventsMOHAMMAD BADALYspecial
Latest 25 of 114.
▾Documents — 314 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch27
08/26/2026X00093245-I1Request digital key ↗
08/25/2026X00479692-I1Request digital key ↗
08/25/2026X00479742-P2Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00234304-I1Request digital key ↗
08/26/2026X00311015-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/26/2026X00234304-I1Request digital key ↗
08/26/2026X00311015-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026X00377187-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION25
12/28/2020220632769Open ↗
11/30/2020201106686Open ↗
11/09/2020220735444Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION5
07/20/2019220632769Open ↗
07/01/2019220632769Open ↗
07/01/2019220632769Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/29/2020220645880Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/10/2020220632769Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZoning Exhibit form (1-5)9
08/13/2026X00569787-P7Open ↗
08/13/2026X00569787-P9Open ↗
08/13/2026X00569787-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/23/2020220632769Open ↗
▸BISVERIFY TAX LOT1
10/23/2020220632769Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/23/2020220632769Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/23/2020220632769Open ↗
▸BISZONING DIAGRAM1
10/16/2018220632769Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/15/2018220632769Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/15/2018220632769Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00569787-I1Open ↗
▸Seals & Professional Certifications101
▸DOB NOWProgress Inspector Seal & Signature37
09/25/2026X00569787-P9Open ↗
09/25/2026X00569787-P9Open ↗
09/25/2026X00569787-P9Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/25/2026X00569787-P9Open ↗
09/25/2026X00569787-P9Open ↗
09/25/2026X00569787-P9Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/26/2026X00234304-I1Open ↗
08/26/2026X00311015-I1Open ↗
08/26/2026X00377187-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/22/2020220632769Open ↗
10/15/2018220632769Open ↗
10/15/2018220632769Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
04/06/2020220632769Open ↗
12/30/2019220632769Open ↗
12/12/2019220632769Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
10/29/2020220638763Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
10/16/2018220632769Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/20/2020220632769Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/20/2020220632769Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/03/2021220632769Open ↗
▸BISFDNY CERTIFICATE OF APPROVALL1
12/08/2020220632769Open ↗
▸BISEQUIPMENT USE PERMITS1
02/03/2021220632769Open ↗
▸BISSCHEDULE B - PLUMBING1
10/14/2020220632769Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/15/2018220632769Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist9
08/24/2026X00569787-A3Open ↗
08/24/2026X00569787-A1Open ↗
08/24/2026X00569787-P9Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST2
07/29/2020220645880Open ↗
10/15/2018220632769Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/05/2018220632769Open ↗
▸BISSTREET TREES SITE PLAN1
07/29/2020220645880Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00569787-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00569787-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00569787-I1Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026X00479692-I1Open ↗
08/13/2026X00569787-I1Open ↗
08/13/2026X00647608-S1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/19/2020220632769Open ↗
11/19/2020220632769Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/15/2018220632769Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/23/2020220632769Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
09/23/2020220632769Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/19/2020220632769Open ↗
11/19/2020220632769Open ↗
10/23/2020220632769Open ↗
Showing 3 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
10/15/2018220632769Open ↗
10/15/2018220632769Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/15/2018220632769Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/26/2020220632769Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/15/2018220632769Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/14/2018220632769Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/20/2020220632769Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/23/2020220632769Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
02/03/2021220632769Open ↗
01/29/2021220632769Open ↗
01/26/2021220632769Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/06/2021220632769Open ↗
12/08/2020220632769Open ↗
11/09/2020220735444Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/08/2019220632769Open ↗
10/15/2018220632769Open ↗
09/18/2018220632769Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT2
11/05/2020220638763Open ↗
11/05/2020220638763Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/20/2019220632769Open ↗
11/14/2018220632769Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
11/14/2018220632769Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION20
01/06/2021220632769Open ↗
01/06/2021220632769Open ↗
12/08/2020220632769Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM8
06/10/2020220632769Open ↗
04/22/2020220632769Open ↗
04/10/2020220638763Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET4
11/09/2020220735444Open ↗
05/09/2018220645880Open ↗
05/01/2018220638763Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/09/2018220645880Open ↗
▸Other Documents15
▸DOB NOWWaiver Document6
08/13/2026X00569787-A1Open ↗
08/13/2026X00569787-A3Open ↗
08/13/2026X00569787-P9Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/29/2020220638763Open ↗
10/29/2020220638763Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/29/2020220645880Open ↗
▸BISTCO - Supporting Documents1
11/30/2020220632769Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/29/2020220645880Open ↗
▸BISPLOT DIAGRAM1
10/15/2018220632769Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
10/15/2018220632769Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/29/2020220645880Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00569787-I1Open ↗