← Back
Three families
2305 BEDFORD AVENUE
BROOKLYN · BIN 3117754
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6Zoning
3,150 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 2305 LLC · 1,560 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 39p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2305 LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2022$620K—Private party → 2305 LLC$197/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRAMEWORK ENGINEERING PC605/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BSD CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor303/21/2026
PLATINUM PWR ELECTL CONTElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519605/13/2024
Building Lifecycle
All (110)Filed (6)Permit Issued (2)Signed Off (1)Violation (60)Inspection (4)Objection (12)Special Inspection (25)
05/01/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
05/13/2024
Filed — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-P4
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
05/07/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
05/07/2024
Special inspection requirement — Metering
Younes Abouyaala
05/07/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
05/07/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
05/07/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
04/08/2024
Violation issued (HPD, closed)
A
03/05/2024
Signed off — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-S1
02/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2023
Filed — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-P3
09/27/2023
Filed — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-P2
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/27/2023
Special inspection requirement — Lighting controls
Younes Abouyaala
09/27/2023
Special inspection requirement — Metering
Younes Abouyaala
09/27/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
09/27/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/27/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
09/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2023
Filed — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-P1
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/12/2023
Special inspection requirement — Lighting controls
Younes Abouyaala
09/12/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/12/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
09/12/2023
Special inspection requirement — Metering
Younes Abouyaala
09/12/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
09/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2023
Permit issued — Plumbing
B00826777-S1-PL
06/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/05/2023
Objection raised — Inspections
05/05/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Admin
05/05/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Admin
05/05/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Scope
05/05/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Inspections
05/05/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Other
05/05/2023
Objection resolved — Addressed
05/03/2023
Filed — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-S1
05/03/2023
Permit issued — General Construction
B00826777-I1-GC
03/21/2023
Violation issued (HPD, closed)
A
02/22/2023
Filed — Alteration CO
altering an existing 3 Family dwelling to a 6 Family dwelling
B00826777-I1
11/10/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
06/11/2020
Violation issued (HPD, closed)
B
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/29/2023
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR05/03/2023
1 project · most recent 05/13/2024
Water/Sanitary
FiledStatusContractorScope
05/13/2024Signed-offINFINITI ESC PLUMBING CORWater/Sanitary
3 projects · most recent 01/25/2024
General Wiring
FiledStatusContractorScope
01/25/2024CompleteCONTACT ELECTRIC CORPGeneral Wiring
01/08/2024CompletePLATINUM PWR ELECTL CONT7 meters, 7 new_meters
07/31/2023CompleteMARTIN DORKINGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/07/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/07/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/07/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
05/07/2024Interior lighting powerYounes Abouyaalaenergy_progress
05/07/2024MeteringYounes Abouyaalaenergy_progress
05/07/2024Lighting controlsYounes Abouyaalaenergy_progress
05/07/2024Maintenance informationYounes Abouyaalaenergy_progress
05/07/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
09/27/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/27/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/27/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/27/2023Lighting controlsYounes Abouyaalaenergy_progress
09/27/2023MeteringYounes Abouyaalaenergy_progress
09/27/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
09/27/2023Interior lighting powerYounes Abouyaalaenergy_progress
09/27/2023Maintenance informationYounes Abouyaalaenergy_progress
09/12/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/12/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/12/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/12/2023Lighting controlsYounes Abouyaalaenergy_progress
09/12/2023Interior lighting powerYounes Abouyaalaenergy_progress
09/12/2023Maintenance informationYounes Abouyaalaenergy_progress
09/12/2023MeteringYounes Abouyaalaenergy_progress
09/12/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
06/07/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00826777-P1Request digital key ↗
08/26/2026B00826777-P3Request digital key ↗
08/26/2026B00826777-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00826777-P1Open ↗
08/13/2026B00826777-P3Open ↗
08/13/2026B00826777-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00826777-P4Open ↗
09/01/2026B00826777-P4Open ↗
08/31/2026B00826777-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/07/2026B00826777-S1Open ↗
09/01/2026B00826777-P4Open ↗
08/31/2026B00826777-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026B00826777-I1Open ↗
08/13/2026B00826777-P1Open ↗
08/13/2026B00826777-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00826777-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B00826777-P2Open ↗
08/13/2026B00826777-P4Open ↗
08/13/2026B00826777-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification5
08/13/2026B00826777-P3Open ↗
08/13/2026B00826777-I1Open ↗
08/13/2026B00826777-P4Open ↗
Showing 3 of 5 on file for this type