← Back
BuildNYC
Four families
2306 CAMBRELENG AVENUE
BRONX · Belmont · BIN 2092290
💬 Discuss this project
1931Year Built
3Stories
C3Building Class
R7-1Zoning
3,990 sfGross Floor Area
4Units
Rent Stabilized8 Active Violations 1 old, status unconfirmed ▸
Four families · 4,200 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/07/2026$1.5M—Private party → Private party$370/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pastor E Medina210/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Aye Consulting Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cibor ConstructionGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781210/01/2021
Building Lifecycle
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
04/24/2026
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF DOG AND THE DOG CAGE AT PUBLIC HALL, 2nd STORY
HPD violation · open
04/24/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
04/24/2026
§ 27-2010, 2011, 2012 ADM CODE CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE DOG FECES AT PUBLIC HALL, 2nd STORY
HPD violation · open
11/17/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCibor Construction09/13/2021
BISBLISSUEDPacific Energy03/25/2011
BISPLISSUEDFernandez Heating & Mechanical11/26/2010
BISOTISSUEDBPS Construction & Home11/26/2010
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/05/2021Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
10/05/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/05/2021FinalPastor Medinaprogress
10/05/2021Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
10/05/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/05/2021Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
10/05/2021Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
09/29/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/29/2021Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
09/29/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/29/2021FinalPastor Medinaprogress
09/29/2021Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
09/29/2021Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
09/29/2021Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account