HPD11/10/2026§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT 1ST STACK FROM SOUTH AT WEST BUILDING FRONT AT FIRE ESCAPE, 4th STORY
HPD10/19/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE FOYER LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/19/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F2, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B4, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C11, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D2, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E7, 5th STORY, 6th APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E5, 5th STORY, 4th APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D6, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D7, 4th STORY, 6th APARTMENT FROM NORTH AT EAST
HPD10/06/2026§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D12, 4th STORY, 5th APARTMENT FROM NORTH AT EAST
HPD09/17/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT C3, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD06/01/2025§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 6th STORY
HPD05/14/2025§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HEAT RISER ESCUTCHEON PLATE AT CEILING IN THE BATHROOM LOCATED AT APT B2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB09/06/2019Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tstThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2026). This one is not shown as answered2 identical filings
DOB01/26/2018Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tstThe owner has filed since: Category 1 elevator reports are on file for later years (latest 2026). This one is not shown as answered2 identical filings